| Concept URI | http://dd.eionet.europa.eu/vocabulary/euregistryonindustrialsites/BATAELValue/IS-Zn-BAT81-III |
|---|---|
| Preferred label | Iron and Steel Production - Zn - BAT81-III |
| Definition | 2, Production and processing of metals: 2,2 Production of pig iron or steel (primary or secondary fusion) including continuous casting, with a capacity exceeding 2,5�tonnes per hour Reducing zinc to water. The BAT-AEL emission level is < 2 mg/l. |
| Notation | IS-Zn-BAT81-III |
| Status | Valid |
| Status Modified | 2019-04-23 |
| Accepted Date | 2019-04-23 |
| Not Accepted Date |
European Environment Agency
Kgs. Nytorv 6, DK-1050 Copenhagen K, Denmark