Edit vocabulary

Folder Mandatory
Identifier Mandatory
Label Mandatory
Base URI Optional
Registration status Mandatory
Type Mandatory Common
Numeric concept identifiers Mandatory
Optional
Definition Optional
Version Optional
Source Optional
License Optional
 

Bound elements for concepts

Element Type Status
skos:exactMatch Quantitative
Released
  • Step 1
  • Step 2
  • Step 3
  • Step 4
  • Step 5
30 Sep 2013

Add new data elements

Mandatory
Mandatory
Optional
Optional (forcefully equal to identifier in this vocabulary)
 

Vocabulary concepts

707 concepts found, displaying 61 to 80.First12345678Last
Id Label Status Status Modified Notation
ECU European currency unit (Ecu) Quick edit Valid 2013-09-24 ECU
EUR Euro Quick edit Valid 2013-09-24 EUR
EUR_AE Euro per adult equivalent Quick edit Valid 2017-06-28 EUR_AE
EUR_BGDP Euro per billion GDP Quick edit Valid 2017-01-18 EUR_BGDP
EUR_HA Euro per hectare Quick edit Valid 2013-09-24 EUR_HA
EUR_HAB Euro per inhabitant Quick edit Valid 2013-09-24 EUR_HAB
EUR_HAB_EU Euro per inhabitant in percentage of the EU average Quick edit Valid 2013-09-24 EUR_HAB_EU
EUR_HAB_EU27_2020 Euro per inhabitant in percentage of the EU27 (from 2020) average Quick edit Valid 2020-02-25 EUR_HAB_EU27_2020
EUR_HAB_KP10 Euro per inhabitant (at constant 2010 prices) Quick edit Valid 2017-01-18 EUR_HAB_KP10
EUR_HD Euro per head (animal) Quick edit Valid 2023-05-10 EUR_HD
EUR_HH Euro per household Quick edit Valid 2017-06-28 EUR_HH
EUR_HHD Euro per hundred heads (animals) Quick edit Valid 2023-05-10 EUR_HHD
EUR_HIVE Euro per beehive Quick edit Valid 2023-05-10 EUR_HIVE
EUR_HM2 Euro per hundred square metres Quick edit Valid 2023-05-10 EUR_HM2
EUR_KG Euro per kilogram Quick edit Valid 2013-09-24 EUR_KG
EUR_KGOE Euro per kilogram of oil equivalent (KGOE) Quick edit Valid 2013-11-13 EUR_KGOE
EUR_KG_CLV10 Euro per kilogram, chain linked volumes (2010) Quick edit Valid 2015-03-25 EUR_KG_CLV10
EUR_KG_CLV15 Euro per kilogram, chain linked volumes (2015) Quick edit Valid 2023-05-10 EUR_KG_CLV15
EUR_M3_CLV10 Euro per cubic metre (Euro: chain-linked volumes, reference year 2010, at 2010 exchange rates) Quick edit Valid 2016-03-23 EUR_M3_CLV10
EUR_T Euro per tonne Quick edit Valid 2013-09-24 EUR_T
CSV Import

The CSV file should contain a header row for element names and data rows for concepts.
It is strongly recommended to use an exported CSV file as a template for bulk editing. Columns and rows can be added to or deleted from the template file.
A concept can be ignored by prepending a double-slash '//' to the concept row in the CSV
    Notes:
  • If the header row contains unknown elements the import will aborted and data will be rolled back
  • Erroneous concept rows are ignored, valid data rows are still imported
  • Successful import cannot be undone (unless "undo checkout" is performed)
  • If a concept with the same identifier already exists in the vocabulary it will be overwritten
  • "Purge Vocabulary" option deletes all the vocabulary concepts before import
Note
  • With this operation, contents of RDF file will be imported into vocabulary folder.
  • Only a working copy can be updated with a RDF file upload.
  • If user select "Purge Per Predicate" option. All seen predicates will be removed from vocabulary.
  • If user select "Purge All Vocabulary Data" option. All data will be removed from vocabulary.
  • Once import is successful, operation cannot be undone. If an error occurs during import, then all data will be rolled back.
In this case, existing vocabulary information will be updated with information from imported concepts.
In this case, predicates of existing concepts will be replaced with the imported predicates.
In this case, all existing concepts will be removed and the imported concepts will be added.
In this case, all imported concepts will be removed from the vocabulary.
How to handle missing concepts?