Edit vocabulary

Folder Mandatory
Identifier Mandatory
Label Mandatory
Base URI Optional
Registration status Mandatory
Type Mandatory Common
Numeric concept identifiers Mandatory
Optional
Definition Optional
Version Optional
Source Optional
License Optional
 

Bound elements for concepts

Element Type Status
skos:exactMatch Quantitative
Released
  • Step 1
  • Step 2
  • Step 3
  • Step 4
  • Step 5
30 Sep 2013

Add new data elements

Mandatory
Mandatory
Optional
Optional (forcefully equal to identifier in this vocabulary)
 

Vocabulary concepts

707 concepts found, displaying 281 to 300.First1112131415161718Last
Id Label Status Status Modified Notation
PCH_M12 Percentage change m/m-12 Quick edit Valid 2013-09-24 PCH_M12
PCH_M12_CA Percentage change m/m-12 (CA) Quick edit Valid 2016-01-27 PCH_M12_CA
PCH_M12_NSA Percentage change m/m-12 (NSA) Quick edit Valid 2013-09-24 PCH_M12_NSA
PCH_M1_NSA Percentage change m/m-1 (NSA) Quick edit Valid 2013-09-24 PCH_M1_NSA
PCH_M1_SA Percentage change m/m-1 (SA) Quick edit Valid 2013-09-24 PCH_M1_SA
PCH_M1_SCA Percentage change m/m-1 (SCA) Quick edit Valid 2016-01-27 PCH_M1_SCA
PCH_M24 Percentage change m/m-24 Quick edit Valid 2023-05-10 PCH_M24
PCH_MV12 Percentage change - 12-months average Quick edit Valid 2013-09-24 PCH_MV12
PCH_OECD_5Y Percentage of OECD total - 5-year change Quick edit Valid 2013-10-25 PCH_OECD_5Y
PCH_OECD_EU_5Y Percentage of the total of OECD countries and EU Member States not in OECD - 5-year change Quick edit Valid 2023-08-08 PCH_OECD_EU_5Y
PCH_PRE Percentage change on previous period Quick edit Valid 2013-09-24 PCH_PRE
PCH_PRE_CPI00_EUR Price index - percentage change on previous period, based on 2000=100 and the euro Quick edit Valid 2013-09-24 PCH_PRE_CPI00_EUR
PCH_PRE_CPI00_NAC Price index - percentage change on previous period, based on 2000=100 and national currency Quick edit Valid 2013-09-24 PCH_PRE_CPI00_NAC
PCH_PRE_CPI05_EUR Price index - percentage change on previous period, based on 2005=100 and the euro Quick edit Valid 2013-09-24 PCH_PRE_CPI05_EUR
PCH_PRE_CPI05_NAC Price index - percentage change on previous period, based on 2005=100 and national currency Quick edit Valid 2013-09-24 PCH_PRE_CPI05_NAC
PCH_PRE_EUR Percentage change on previous period, euro Quick edit Valid 2013-09-24 PCH_PRE_EUR
PCH_PRE_FTE Percentage change on previous period (based on full-time equivalents) Quick edit Valid 2013-09-24 PCH_PRE_FTE
PCH_PRE_HAB Percentage change on previous period (based on inhabitants) Quick edit Valid 2013-09-24 PCH_PRE_HAB
PCH_PRE_HW Percentage change on previous period (based on hours worked) Quick edit Valid 2014-07-09 PCH_PRE_HW
PCH_PRE_JOB Percentage change on previous period (based on jobs) Quick edit Valid 2013-09-24 PCH_PRE_JOB
CSV Import

The CSV file should contain a header row for element names and data rows for concepts.
It is strongly recommended to use an exported CSV file as a template for bulk editing. Columns and rows can be added to or deleted from the template file.
A concept can be ignored by prepending a double-slash '//' to the concept row in the CSV
    Notes:
  • If the header row contains unknown elements the import will aborted and data will be rolled back
  • Erroneous concept rows are ignored, valid data rows are still imported
  • Successful import cannot be undone (unless "undo checkout" is performed)
  • If a concept with the same identifier already exists in the vocabulary it will be overwritten
  • "Purge Vocabulary" option deletes all the vocabulary concepts before import
Note
  • With this operation, contents of RDF file will be imported into vocabulary folder.
  • Only a working copy can be updated with a RDF file upload.
  • If user select "Purge Per Predicate" option. All seen predicates will be removed from vocabulary.
  • If user select "Purge All Vocabulary Data" option. All data will be removed from vocabulary.
  • Once import is successful, operation cannot be undone. If an error occurs during import, then all data will be rolled back.
In this case, existing vocabulary information will be updated with information from imported concepts.
In this case, predicates of existing concepts will be replaced with the imported predicates.
In this case, all existing concepts will be removed and the imported concepts will be added.
In this case, all imported concepts will be removed from the vocabulary.
How to handle missing concepts?