Edit vocabulary

Folder Mandatory
Identifier Mandatory
Label Mandatory
Base URI Optional
Registration status Mandatory
Type Mandatory Common
Numeric concept identifiers Mandatory
Optional
Definition Optional
Version Optional
Source Optional
License Optional
 

Bound elements for concepts

Element Type Status
skos:exactMatch Quantitative
Released
  • Step 1
  • Step 2
  • Step 3
  • Step 4
  • Step 5
30 Sep 2013

Add new data elements

Mandatory
Mandatory
Optional
Optional (forcefully equal to identifier in this vocabulary)
 

Vocabulary concepts

707 concepts found, displaying 221 to 240.First89101112131415Last
Id Label Status Status Modified Notation
MIO_EUR_SCA Million euro (SCA) Quick edit Valid 2016-02-18 MIO_EUR_SCA
MIO_GTKM Million gross tonne-kilometres Quick edit Valid 2013-09-24 MIO_GTKM
MIO_HR Million hours Quick edit Valid 2013-09-24 MIO_HR
MIO_M2 Million square metres Quick edit Valid 2023-05-10 MIO_M2
MIO_M3 Million cubic metres Quick edit Valid 2013-09-24 MIO_M3
MIO_M3D Million cubic metres per day Quick edit Valid 2018-11-28 MIO_M3D
MIO_NAC Million units of national currency Quick edit Valid 2013-09-24 MIO_NAC
MIO_NAT Million units of national currency (former currencies of the euro area countries) Quick edit Valid 2013-09-24 MIO_NAT
MIO_PER Million persons Quick edit Valid 2017-08-02 MIO_PER
MIO_PKM Millions of passenger-kilometres Quick edit Valid 2013-09-24 MIO_PKM
MIO_PPS Million purchasing power standards (PPS) Quick edit Valid 2013-09-24 MIO_PPS
MIO_PPS_EU27_2020 Million purchasing power standards (PPS, EU27 from 2020) Quick edit Valid 2020-02-25 MIO_PPS_EU27_2020
MIO_PPS_KP00 Million purchasing power standards (PPS) at 2000 prices Quick edit Valid 2013-09-24 MIO_PPS_KP00
MIO_PPS_KP05 Million purchasing power standards (PPS) at 2005 prices Quick edit Valid 2013-09-24 MIO_PPS_KP05
MIO_SAL Millions of employees Quick edit Valid 2023-05-10 MIO_SAL
MIO_SKM Million seat-kilometre Quick edit Valid 2023-10-19 MIO_SKM
MIO_T Million tonnes Quick edit Valid 2013-09-24 MIO_T
MIO_TKM Million tonne-kilometre (TKM) Quick edit Valid 2013-09-24 MIO_TKM
MIO_VKM Million vehicle-kilometres (VKM) Quick edit Valid 2013-09-24 MIO_VKM
MJ Megajoule Quick edit Valid 2019-07-17 MJ
CSV Import

The CSV file should contain a header row for element names and data rows for concepts.
It is strongly recommended to use an exported CSV file as a template for bulk editing. Columns and rows can be added to or deleted from the template file.
A concept can be ignored by prepending a double-slash '//' to the concept row in the CSV
    Notes:
  • If the header row contains unknown elements the import will aborted and data will be rolled back
  • Erroneous concept rows are ignored, valid data rows are still imported
  • Successful import cannot be undone (unless "undo checkout" is performed)
  • If a concept with the same identifier already exists in the vocabulary it will be overwritten
  • "Purge Vocabulary" option deletes all the vocabulary concepts before import
Note
  • With this operation, contents of RDF file will be imported into vocabulary folder.
  • Only a working copy can be updated with a RDF file upload.
  • If user select "Purge Per Predicate" option. All seen predicates will be removed from vocabulary.
  • If user select "Purge All Vocabulary Data" option. All data will be removed from vocabulary.
  • Once import is successful, operation cannot be undone. If an error occurs during import, then all data will be rolled back.
In this case, existing vocabulary information will be updated with information from imported concepts.
In this case, predicates of existing concepts will be replaced with the imported predicates.
In this case, all existing concepts will be removed and the imported concepts will be added.
In this case, all imported concepts will be removed from the vocabulary.
How to handle missing concepts?