Concept: The planned end date for the measure should be provided in the right format. If unknown, it should be voided using indeterminatePosition="unknown". in the cdrqaqc vocabulary

Concept URI http://dd.eionet.europa.eu/vocabulary/aq/cdrqaqc/K28
Preferred label The planned end date for the measure should be provided in the right format. If unknown, it should be voided using indeterminatePosition="unknown".
Definition If not voided aqd:AQD_Measures/aqd:plannedImplementation/aqd:PlannedImplementation/aqd:implementationPlannedTimePeriod/gml:TimePeriod/gml:endPosition must be a date in full ISO format and must be after aqd:AQD_Measures/aqd:plannedImplementation/aqd:PlannedImplementation/aqd:implementationPlannedTimePeriod/gml:TimePeriod/gml:beginPosition. If voided it should be indeterminatePosition="unknown"
Notation K28
Status Valid
Status Modified 2023-05-04
Accepted Date 2023-05-04
Not Accepted Date
Hidden label
  • The planned end date for the measure should be provided in the right format. If unknown, it should be voided using indeterminatePosition="unknown". [en]
Error type
  • BLOCKER