Concept: If the final total costs of the measure is provided, it needs to be a number. in the cdrqaqc vocabulary

Concept URI http://dd.eionet.europa.eu/vocabulary/aq/cdrqaqc/K22
Preferred label If the final total costs of the measure is provided, it needs to be a number.
Definition /aqd:AQD_Measures/aqd:costs/aqd:Costs/aqd:finalImplementationCosts should be an integer number if populated
Notation K22
Status Valid
Status Modified 2023-05-04
Accepted Date 2023-05-04
Not Accepted Date
Hidden label
  • If the final total costs of the measure is provided, it needs to be a number. [en]
Error type
  • BLOCKER