Edit vocabulary

Folder Mandatory
Identifier Mandatory
Label Mandatory
Base URI Optional
Registration status Mandatory
Type Mandatory Common
Numeric concept identifiers Mandatory
Optional
Definition Optional
Version Optional
Source Optional
License Optional
 

Bound elements for concepts

Element Type Status
skos:broader Quantitative
Released
  • Step 1
  • Step 2
  • Step 3
  • Step 4
  • Step 5
30 Sep 2013
skos:narrower Quantitative
Released
  • Step 1
  • Step 2
  • Step 3
  • Step 4
  • Step 5
17 Sep 2015

Add new data elements

Mandatory
Mandatory
Optional
Optional (forcefully equal to identifier in this vocabulary)
 

Vocabulary concepts

48 concepts found, displaying 21 to 40.First123Last
Id Label Status Status Modified Notation
4_2 4.2. Production of inorganic chemicals as defined under (a) to (e) Quick edit Valid 2014-08-29 4_2
4_3 4.3. Production of phosphorous-, nitrogen- or potassium-based fertilisers (simple or compound fertilisers) Quick edit Valid 2014-08-29 4_3
4_4 4.4. Production of plant protection products or of biocides Quick edit Valid 2014-08-29 4_4
4_5 4.5. Production of pharmaceutical products including intermediates Quick edit Valid 2014-08-29 4_5
4_6 4.6. Production of explosives Quick edit Valid 2014-08-29 4_6
5 5. Waste management Quick edit Valid 2014-08-29 5
5_1 5.1. Disposal or recovery of hazardous waste with a capacity exceeding 10 tonnes per day involving one or more of the activities (a) to (k) Quick edit Valid 2014-08-29 5_1
5_2a 5.2. (a) Disposal or recovery of waste in waste incineration plants or in waste co-incineration plants for non-hazardous waste with a capacity exceeding 3 tonnes per hour Quick edit Valid 2014-08-29 5_2a
5_2b 5.2. (b) Disposal or recovery of waste in waste incineration plants or in waste co-incineration plants for for hazardous waste with a capacity exceeding 10 tonnes per day Quick edit Valid 2014-08-29 5_2b
5_3a 5.3. (a) Disposal of non-hazardous waste with a capacity exceeding 50 tonnes per day involving one or more of activities (i) to (v) Quick edit Valid 2014-08-29 5_3a
5_3b 5.3. (b) Recovery, or a mix of recovery and disposal, of non-hazardous waste with a capacity exceeding 75 tonnes per day involving one or more of activities (i) to (iv) Quick edit Valid 2014-08-29 5_3b
5_4 5.4. Landfills, as defined in Article 2(g) of Council Directive 1999/31/EC of 26 April 1999 on the landfill of waste, receiving more than 10 tonnes of waste per day or with a total capacity exceeding 25 000 tonnes, excluding landfills of inert waste Quick edit Valid 2014-08-29 5_4
5_5 5.5. Temporary storage of hazardous waste not covered under point 5.4 pending any of the activities listed in points 5.1, 5.2, 5.4 and 5.6 with a total capacity exceeding 50 tonnes, excluding temporary storage, pending collection, on the site where the waste is generated Quick edit Valid 2014-08-29 5_5
5_6 5.6. Underground storage of hazardous waste with a total capacity exceeding 50 tonnes Quick edit Valid 2014-08-29 5_6
6 6. Other activities Quick edit Valid 2014-08-29 6
6_10 6.10. Preservation of wood and wood products with chemicals with a production capacity exceeding 75 m3 per day other than exclusively treating against sapstain Quick edit Valid 2014-08-29 6_10
6_11 6.11. Independently operated treatment of waste water not covered by Directive 91/271/EEC and discharged by an installation covered by Chapter II Quick edit Valid 2014-08-29 6_11
6_1a 6.1. (a) Production in industrial installations of (a) pulp from timber or other fibrous materials or (b) paper or card board with a production capacity exceeding 20 tonnes per day Quick edit Valid 2014-08-29 6_1a
6_1b 6.1. (b) Production in industrial installations of (c) one or more of the following wood-based panels: oriented strand board, particleboard or fibreboard with a production capacity exceeding 600 m3 per day Quick edit Valid 2014-08-29 6_1b
6_2 6.2. Pre-treatment (operations such as washing, bleaching, mercerisation) or dyeing of textile fibres or textiles where the treatment capacity exceeds 10 tonnes per day Quick edit Valid 2014-08-29 6_2
CSV Import

The CSV file should contain a header row for element names and data rows for concepts.
It is strongly recommended to use an exported CSV file as a template for bulk editing. Columns and rows can be added to or deleted from the template file.
A concept can be ignored by prepending a double-slash '//' to the concept row in the CSV
    Notes:
  • If the header row contains unknown elements the import will aborted and data will be rolled back
  • Erroneous concept rows are ignored, valid data rows are still imported
  • Successful import cannot be undone (unless "undo checkout" is performed)
  • If a concept with the same identifier already exists in the vocabulary it will be overwritten
  • "Purge Vocabulary" option deletes all the vocabulary concepts before import
Note
  • With this operation, contents of RDF file will be imported into vocabulary folder.
  • Only a working copy can be updated with a RDF file upload.
  • If user select "Purge Per Predicate" option. All seen predicates will be removed from vocabulary.
  • If user select "Purge All Vocabulary Data" option. All data will be removed from vocabulary.
  • Once import is successful, operation cannot be undone. If an error occurs during import, then all data will be rolled back.
In this case, existing vocabulary information will be updated with information from imported concepts.
In this case, predicates of existing concepts will be replaced with the imported predicates.
In this case, all existing concepts will be removed and the imported concepts will be added.
In this case, all imported concepts will be removed from the vocabulary.
How to handle missing concepts?