EU Registry on Industrial Sites
euregistryonindustrialsites
This code list allows details of authorisations given by reporting countries to change operating conditions under Article 51 of 2010/75/EU.
Article51Value
Released
marnaian
2018-09-26 06:10:56.0
Common
false
false
Art50-1
Article 50 - 1
Article 50(1): This value should be selected if the derogation relates to Article 50(1) which requires that the total organic carbon content of slag and bottom ashes is less than 3 % or their loss on ignition is less than 5 % of the dry weight of the material.
Conditions different from those laid down in Article 50(1), (2) and (3) and, as regards the temperature, paragraph 4 of that Article and specified in the permit for certain categories of waste or for certain thermal processes, may be authorised by the competent authority provided the other requirements of this Chapter are met. Member States may lay down rules governing these authorisations.
valid
2016-06-07
Art50-2
Article 50 - 2
Article 50(2): This value should be selected if the derogation relates to Article 50(2) which specifies the minimum requirement residence time and temperature of the waste gases from the combustion process.
For waste incineration plants, the change of the operating conditions shall not cause more residues or residues with a higher content of organic polluting substances compared to those residues which could be expected under the conditions laid down in Article 50(1), (2) and (3).
valid
2016-06-07
Art50-3
Article 50 - 3
Article 50(3): This value should be selected if the derogation relates to Article 50(3) which requires each combustion chamber to be equipped with at least one auxiliary burner.
Emissions of total organic carbon and carbon monoxide from waste co-incineration plants, authorised to change operating conditions according to paragraph 1 shall also comply with the emission limit values set out in Part 3 of Annex VI.
valid
2016-06-07
Article 51 - 1
Art51-1
This indicates situations where a member state has allowed a derogation in line with the requirements of Article 51(1) of Directive 2010/75/EU.
Conditions different from those laid down in Article 50(1), (2) and (3) and, as regards the temperature, paragraph 4 of that Article and specified in the permit for certain categories of waste or for certain thermal processes, may be authorised by the competent authority provided the other requirements of this Chapter are met. Member States may lay down rules governing these authorisations.
invalid
2018-09-18
2018-09-18
Art50-1-2
Article 50(1) and Article 50(2) apply.
This code list option should be chosen where the derogations offered under both Article 50(1) and 50(2) are applied.
valid
2018-09-26
Art50-1-3
Article 50(1) and 50(3) apply.
This code list option should be chosen where the derogations offered under both Article 50(1) and 50(3) are applied.
valid
2018-09-26
Art50-2-3
Article 50(2) and Article 50(3) apply.
This code list option should be chosen where the derogations offered under both Article 50(2) and 50(3) are applied.
valid
2018-09-26
Art50-1-2-3
Article 50(1), Article 50(2) and Article 50(3) apply.
This code list option should be chosen where the derogations offered under Article 50(1), Article 50(2) and Article 50(3) are applied.
valid
2018-09-26
Baseline Report Value
BaselineReportValue
Released
claudia
2018-11-21 12:35:16.0
Common
false
false
NOREPORT
No Report
Baseline report not prepared and submitted to the competent authority.
valid
2018-10-02
NOTREQUIRED
Not Required
Baeline report not required as the activity does not involve the use, production or release of relevant hazardous substances and/or does not have the possibility of soil and groundwater contamination at the site of the installation.
valid
2018-10-02
REPORT
Report
Baseline report prepared and submitted to the competent authority.
valid
2018-10-02
BATAELValue
BATAELValue
Released
garlaluc
2020-09-18 14:47:07.0
Common
false
false
CAK-Cl2-BAT13-I
Production of Chlor-alkali - Cl2 - BAT13-I
4, Chemical industry: 4,2 Production of inorganic chemicals, such as: (a) gases, such as ammonia, chlorine or hydrogen chloride, fluorine or hydrogen fluoride, carbon oxides, sulphur compounds, nitrogen oxides, hydrogen, sulphur dioxide, carbonyl chloride;
(c) bases, such as ammonium hydroxide, potassium hydroxide, sodium hydroxide; Reducing free chlorine to water. The BAT-AEL emission level is 0,05 - 0,2 mg/l.
valid
2019-04-23
2019-04-23
CAK-Cl2-BAT8-I
Production of Chlor-alkali - Cl2 - BAT8-I
4, Chemical industry: 4,2 Production of inorganic chemicals, such as: (a) gases, such as ammonia, chlorine or hydrogen chloride, fluorine or hydrogen fluoride, carbon oxides, sulphur compounds, nitrogen oxides, hydrogen, sulphur dioxide, carbonyl chloride;
(c) bases, such as ammonium hydroxide, potassium hydroxide, sodium hydroxide; Chlorine absorption unit; features (i)-(xv) (see list); Reducing chlorine and chlorine dioxide emissions to air. The BAT-AEL emission level is 0,2 - 1 mg/Nm3.
valid
2019-04-23
2019-04-23
CLM-CO-BAT48
Production of Cement, Lime and Magnesium Oxide - CO - BAT48
3, Mineral industry: 3,1 Production of cement, lime and magnesium oxide: (b) production of lime in kilns with a production capacity exceeding 50 tonnes per day; PFRK, OSK, LRK, PRK; Reducing carbon monoxide (CO) emissions to air. The BAT-AEL emission level is < 500 mg/Nm3.
valid
2019-04-23
2019-04-23
CLM-CO-BAT63
Production of Cement, Lime and Magnesium Oxide - CO - BAT63
3, Mineral industry: 3,1 Production of cement, lime and magnesium oxide: (c) production of magnesium oxide in kilns with a production capacity exceeding 50 tonnes per day; Techniques (a)-(c) (see table); Reducing carbon monoxide (CO) emissions to air. The BAT-AEL emission level is < 50 - 1000 mg/Nm3.
valid
2019-04-23
2019-04-23
CLM-Dust-BAT16
Production of Cement, Lime and Magnesium Oxide - Dust - BAT16
3, Mineral industry: 3,1 Production of cement, lime and magnesium oxide: (a) production of cement clinker in rotary kilns with a production capacity exceeding 500 tonnes per day or in other kilns with a production capacity exceeding 50 tonnes per day; Dry flue-gas cleaning with a filter (usually fabric filter); Reducing dust emissions to air. The BAT-AEL emission level is < 10 mg/Nm3.
valid
2019-04-23
2019-04-23
CLM-Dust-BAT17
Production of Cement, Lime and Magnesium Oxide - Dust - BAT17
3, Mineral industry: 3,1 Production of cement, lime and magnesium oxide: (a) production of cement clinker in rotary kilns with a production capacity exceeding 500 tonnes per day or in other kilns with a production capacity exceeding 50 tonnes per day; ESPs, fabric filters, hybrid filters; Reducing dust emissions to air. The BAT-AEL emission level is < 10 - 20 mg/Nm3.
valid
2019-04-23
2019-04-23
CLM-Dust-BAT18
Production of Cement, Lime and Magnesium Oxide - Dust - BAT18
3, Mineral industry: 3,1 Production of cement, lime and magnesium oxide: (a) production of cement clinker in rotary kilns with a production capacity exceeding 500 tonnes per day or in other kilns with a production capacity exceeding 50 tonnes per day; ESPs, fabric filters, hybrid filters; Reducing dust emissions to air. The BAT-AEL emission level is < 10 - 20 mg/Nm3.
valid
2019-04-23
2019-04-23
CLM-Dust-BAT42-I
Production of Cement, Lime and Magnesium Oxide - Dust - BAT42-I
3, Mineral industry: 3,1 Production of cement, lime and magnesium oxide: (b) production of lime in kilns with a production capacity exceeding 50 tonnes per day; Fabric filter; Reducing dust emissions to air. The BAT-AEL emission level is < 10 mg/Nm3.
valid
2019-04-23
2019-04-23
CLM-Dust-BAT42-II
Production of Cement, Lime and Magnesium Oxide - Dust - BAT42-II
3, Mineral industry: 3,1 Production of cement, lime and magnesium oxide: (b) production of lime in kilns with a production capacity exceeding 50 tonnes per day; Wet scrubber; Reducing dust emissions to air. The BAT-AEL emission level is < 10 - 20 mg/Nm3.
valid
2019-04-23
2019-04-23
CLM-Dust-BAT43-I
Production of Cement, Lime and Magnesium Oxide - Dust - BAT43-I
3, Mineral industry: 3,1 Production of cement, lime and magnesium oxide: (b) production of lime in kilns with a production capacity exceeding 50 tonnes per day; Fabric filter; Reducing dust emissions to air. The BAT-AEL emission level is < 10 mg/Nm3.
valid
2019-04-23
2019-04-23
CLM-Dust-BAT43-II
Production of Cement, Lime and Magnesium Oxide - Dust - BAT43-II
3, Mineral industry: 3,1 Production of cement, lime and magnesium oxide: (b) production of lime in kilns with a production capacity exceeding 50 tonnes per day; ESP or other filters; Reducing dust emissions to air. The BAT-AEL emission level is < 20 mg/Nm3.
valid
2019-04-23
2019-04-23
CLM-Dust-BAT59
Production of Cement, Lime and Magnesium Oxide - Dust - BAT59
3, Mineral industry: 3,1 Production of cement, lime and magnesium oxide: (c) production of magnesium oxide in kilns with a production capacity exceeding 50 tonnes per day; Fabric filters, centrifugal separators/ cyclones, wet dust separators; Reducing dust emissions to air. The BAT-AEL emission level is < 10 mg/Nm3.
valid
2019-04-23
2019-04-23
CLM-Dust-BAT60
Production of Cement, Lime and Magnesium Oxide - Dust - BAT60
3, Mineral industry: 3,1 Production of cement, lime and magnesium oxide: (c) production of magnesium oxide in kilns with a production capacity exceeding 50 tonnes per day; ESPs, fabric filters, centrifugal separators / cyclones, wet dust separators; Reducing dust emissions to air. The BAT-AEL emission level is < 20 - 35 mg/Nm3.
valid
2019-04-23
2019-04-23
CLM-HCl-BAT25
Production of Cement, Lime and Magnesium Oxide - HCl - BAT25
3, Mineral industry: 3,1 Production of cement, lime and magnesium oxide: (a) production of cement clinker in rotary kilns with a production capacity exceeding 500 tonnes per day or in other kilns with a production capacity exceeding 50 tonnes per day; Primary techniques (a)-(b) (see table); Reducing hydrogen chloride (HCl) emissions to air. The BAT-AEL emission level is < 10 mg/Nm3.
valid
2019-04-23
2019-04-23
CLM-HCl-BAT51-I
Production of Cement, Lime and Magnesium Oxide - HCl - BAT51-I
3, Mineral industry: 3,1 Production of cement, lime and magnesium oxide: (b) production of lime in kilns with a production capacity exceeding 50 tonnes per day; Primary techniques (a)-(b) (see table), when using waste; Reducing hydrogen chloride (HCl) emissions to air. The BAT-AEL emission level is < 10 mg/Nm3.
valid
2019-04-23
2019-04-23
CLM-HF-BAT26
Production of Cement, Lime and Magnesium Oxide - HF - BAT26
3, Mineral industry: 3,1 Production of cement, lime and magnesium oxide: (a) production of cement clinker in rotary kilns with a production capacity exceeding 500 tonnes per day or in other kilns with a production capacity exceeding 50 tonnes per day; Primary techniques (a)-(b) (see table); Reducing hydrogen fluoride (HF) emissions to air. The BAT-AEL emission level is < 1 mg/Nm3.
valid
2019-04-23
2019-04-23
CLM-HF-BAT51-II
Production of Cement, Lime and Magnesium Oxide - HF - BAT51-II
3, Mineral industry: 3,1 Production of cement, lime and magnesium oxide: (b) production of lime in kilns with a production capacity exceeding 50 tonnes per day; Primary techniques (a)-(b) (see table), when using waste; Reducing hydrogen fluoride (HF) emissions to air. The BAT-AEL emission level is < 1 mg/Nm3.
valid
2019-04-23
2019-04-23
CLM-Hg-BAT28-I
Production of Cement, Lime and Magnesium Oxide - Hg - BAT28-I
3, Mineral industry: 3,1 Production of cement, lime and magnesium oxide: (a) production of cement clinker in rotary kilns with a production capacity exceeding 500 tonnes per day or in other kilns with a production capacity exceeding 50 tonnes per day; Techniques (a)-(c) (see table); Reducing mercury emissions to air. The BAT-AEL emission level is < 0,05 mg/Nm3.
valid
2019-04-23
2019-04-23
CLM-Hg-BAT53-I
Production of Cement, Lime and Magnesium Oxide - Hg - BAT53-I
3, Mineral industry: 3,1 Production of cement, lime and magnesium oxide: (b) production of lime in kilns with a production capacity exceeding 50 tonnes per day; Techniques (a)-(d) (see table), when using wastes; Reducing metals emissions to air. The BAT-AEL emission level is < 0,05 mg/Nm3.
valid
2019-04-23
2019-04-23
CLM-Metals-BAT28-II
Production of Cement, Lime and Magnesium Oxide - Metals - BAT28-II
3, Mineral industry: 3,1 Production of cement, lime and magnesium oxide: (a) production of cement clinker in rotary kilns with a production capacity exceeding 500 tonnes per day or in other kilns with a production capacity exceeding 50 tonnes per day; Techniques (a)-(c) (see table); Reducing metals emissions to air. The BAT-AEL emission level is < 0,05 mg/Nm3.
valid
2019-04-23
2019-04-23
CLM-Metals-BAT28-III
Production of Cement, Lime and Magnesium Oxide - Metals - BAT28-III
3, Mineral industry: 3,1 Production of cement, lime and magnesium oxide: (a) production of cement clinker in rotary kilns with a production capacity exceeding 500 tonnes per day or in other kilns with a production capacity exceeding 50 tonnes per day; Techniques (a)-(c) (see table); Reducing metals emissions to air. The BAT-AEL emission level is < 0,5 mg/Nm3.
valid
2019-04-23
2019-04-23
CLM-Metals-BAT53-II
Production of Cement, Lime and Magnesium Oxide - Metals - BAT53-II
3, Mineral industry: 3,1 Production of cement, lime and magnesium oxide: (b) production of lime in kilns with a production capacity exceeding 50 tonnes per day; Techniques (a)-(d) (see table), when using wastes; Reducing metals emissions to air. The BAT-AEL emission level is < 0,05 mg/Nm3.
valid
2019-04-23
2019-04-23
CLM-Metals-BAT53-III
Production of Cement, Lime and Magnesium Oxide - Metals - BAT53-III
3, Mineral industry: 3,1 Production of cement, lime and magnesium oxide: (b) production of lime in kilns with a production capacity exceeding 50 tonnes per day; Techniques (a)-(d) (see table), when using wastes; Reducing metals emissions to air. The BAT-AEL emission level is < 0,5 mg/Nm3.
valid
2019-04-23
2019-04-23
CLM-NH3-BAT20
Production of Cement, Lime and Magnesium Oxide - NH3 - BAT20
3, Mineral industry: 3,1 Production of cement, lime and magnesium oxide: (a) production of cement clinker in rotary kilns with a production capacity exceeding 500 tonnes per day or in other kilns with a production capacity exceeding 50 tonnes per day; SNCR; techniques (a)-(c) (see table); Reducing ammonia slip emissions to air. The BAT-AEL emission level is < 30 - 50 mg/Nm3.
valid
2019-04-23
2019-04-23
CLM-NH3-BAT46
Production of Cement, Lime and Magnesium Oxide - NH3 - BAT46
3, Mineral industry: 3,1 Production of cement, lime and magnesium oxide: (b) production of lime in kilns with a production capacity exceeding 50 tonnes per day; SNCR; Reducing ammonia slip emissions to air. The BAT-AEL emission level is < 30 mg/Nm3.
valid
2019-04-23
2019-04-23
CLM-NO2-BAT19-I
Production of Cement, Lime and Magnesium Oxide - NO2 - BAT19-I
3, Mineral industry: 3,1 Production of cement, lime and magnesium oxide: (a) production of cement clinker in rotary kilns with a production capacity exceeding 500 tonnes per day or in other kilns with a production capacity exceeding 50 tonnes per day; Preheater kilns; Reducing nitrogen oxides (NOx) emissions to air. The BAT-AEL emission level is < 200 - 450 mg/Nm3.
valid
2019-04-23
2019-04-23
CLM-NO2-BAT19-II
Production of Cement, Lime and Magnesium Oxide - NO2 - BAT19-II
3, Mineral industry: 3,1 Production of cement, lime and magnesium oxide: (a) production of cement clinker in rotary kilns with a production capacity exceeding 500 tonnes per day or in other kilns with a production capacity exceeding 50 tonnes per day; Lepol and long rotary kilns; Reducing nitrogen oxides (NOx) emissions to air. The BAT-AEL emission level is 400 - 800 mg/Nm3.
valid
2019-04-23
2019-04-23
CLM-NO2-BAT45-I
Production of Cement, Lime and Magnesium Oxide - NO2 - BAT45-I
3, Mineral industry: 3,1 Production of cement, lime and magnesium oxide: (b) production of lime in kilns with a production capacity exceeding 50 tonnes per day; PFRK, ASK, MFSK, OSK; Reducing nitrogen oxides (NOx) emissions to air. The BAT-AEL emission level is 100 - 350 mg/Nm3.
valid
2019-04-23
2019-04-23
CLM-NO2-BAT45-II
Production of Cement, Lime and Magnesium Oxide - NO2 - BAT45-II
3, Mineral industry: 3,1 Production of cement, lime and magnesium oxide: (b) production of lime in kilns with a production capacity exceeding 50 tonnes per day; LRK, PRK; Reducing nitrogen oxides (NOx) emissions to air. The BAT-AEL emission level is < 200 - 500 mg/Nm3.
valid
2019-04-23
2019-04-23
CLM-NO2-BAT62
Production of Cement, Lime and Magnesium Oxide - NO2 - BAT62
3, Mineral industry: 3,1 Production of cement, lime and magnesium oxide: (c) production of magnesium oxide in kilns with a production capacity exceeding 50 tonnes per day; Techniques (a)-(b) (see table); Reducing nitrogen oxides (NOx) emissions to air. The BAT-AEL emission level is < 500 - 1500 mg/Nm3.
valid
2019-04-23
2019-04-23
CLM-PCDD.F-BAT27
Production of Cement, Lime and Magnesium Oxide - PCDD.F - BAT27
3, Mineral industry: 3,1 Production of cement, lime and magnesium oxide: (a) production of cement clinker in rotary kilns with a production capacity exceeding 500 tonnes per day or in other kilns with a production capacity exceeding 50 tonnes per day; Techniques (a)-(f) (see table); Reducing PCDD/F emissions to air. The BAT-AEL emission level is < 0,05 - 0,1 ng/Nm3.
valid
2019-04-23
2019-04-23
CLM-PCDD.F-BAT52
Production of Cement, Lime and Magnesium Oxide - PCDD.F - BAT52
3, Mineral industry: 3,1 Production of cement, lime and magnesium oxide: (b) production of lime in kilns with a production capacity exceeding 50 tonnes per day; Primary techniques (a)-(c) (see table); Reducing PCDD/F emissions to air. The BAT-AEL emission level is < 0,05 - 0,1 ng/Nm3.
valid
2019-04-23
2019-04-23
CLM-SO2-BAT21
Production of Cement, Lime and Magnesium Oxide - SO2 - BAT21
3, Mineral industry: 3,1 Production of cement, lime and magnesium oxide: (a) production of cement clinker in rotary kilns with a production capacity exceeding 500 tonnes per day or in other kilns with a production capacity exceeding 50 tonnes per day; Absorbent addition, wet scrubber; Reducing sulphur oxides (SOx) emissions to air. The BAT-AEL emission level is < 50 - 400 mg/Nm3.
valid
2019-04-23
2019-04-23
CLM-SO2-BAT47-I
Production of Cement, Lime and Magnesium Oxide - SO2 - BAT47-I
3, Mineral industry: 3,1 Production of cement, lime and magnesium oxide: (b) production of lime in kilns with a production capacity exceeding 50 tonnes per day; PFRK, ASK, MFSK, OSK, PRK; Reducing SOX emissions to air. The BAT-AEL emission level is < 50 - 200 mg/Nm3.
valid
2019-04-23
2019-04-23
CLM-SO2-BAT47-II
Production of Cement, Lime and Magnesium Oxide - SO2 - BAT47-II
3, Mineral industry: 3,1 Production of cement, lime and magnesium oxide: (b) production of lime in kilns with a production capacity exceeding 50 tonnes per day; LRK; Reducing SOX emissions to air. The BAT-AEL emission level is < 50 - 400 mg/Nm3.
valid
2019-04-23
2019-04-23
CLM-SO2-BAT65
Production of Cement, Lime and Magnesium Oxide - SO2 - BAT65
3, Mineral industry: 3,1 Production of cement, lime and magnesium oxide: (c) production of magnesium oxide in kilns with a production capacity exceeding 50 tonnes per day; Primary and secondary techniques (a)-(d) (see table); Reducing sulphur oxides (SOx) emissions to air. The BAT-AEL emission level is < 50 - 400 mg/Nm3.
valid
2019-04-23
2019-04-23
CLM-TOC-BAT50-I
Production of Cement, Lime and Magnesium Oxide - TOC - BAT50-I
3, Mineral industry: 3,1 Production of cement, lime and magnesium oxide: (b) production of lime in kilns with a production capacity exceeding 50 tonnes per day; LRK, PRK; Reducing total organic carbon (TOC) emissions to air. The BAT-AEL emission level is < 10 mg/Nm3.
valid
2019-04-23
2019-04-23
CLM-TOC-BAT50-II
Production of Cement, Lime and Magnesium Oxide - TOC - BAT50-II
3, Mineral industry: 3,1 Production of cement, lime and magnesium oxide: (b) production of lime in kilns with a production capacity exceeding 50 tonnes per day; ASK, MFSK, PFRK; Reducing total organic carbon (TOC) emissions to air. The BAT-AEL emission level is < 30 mg/Nm3.
valid
2019-04-23
2019-04-23
CWW-AOX-BAT10-XIII
Common Waste Water and Waste Gas Treatment/ Management Systems in the Chemical Sector - AOX - BAT10-XIII
4, Chemical industry: 4.1, Production of organic chemicals;
4.2, Production of inorganic chemicals;
4.3, Production of phosphorous-, nitrogen- or potassium-based fertilisers;
4.4, Production of plant protection products or of biocides;
4.5, Production of pharmaceutical products including intermediates;
4.6. Production of explosives. Reducing adsorbable organically bound halogens (AOX) to water. The BAT-AEL emission level is 0,2 - 1 mg/l.
valid
2019-04-23
2019-04-23
CWW-AOX-BAT10-XIV
Common Waste Water and Waste Gas Treatment/ Management Systems in the Chemical Sector - AOX - BAT10-XIV
6, Other activities: 6,11 Independently operated treatment of waste water not covered by Directive 91/271/EEC and discharged by an installation undertaking activities covered under Section 4. of Annex I Reducing adsorbable organically bound halogens (AOX) to water. The BAT-AEL emission level is 0,2 - 1 mg/l.
valid
2019-04-23
2019-04-23
CWW-COD-BAT10-III
Common Waste Water and Waste Gas Treatment/ Management Systems in the Chemical Sector - COD - BAT10-III
4, Chemical industry: 4.1, Production of organic chemicals;
4.2, Production of inorganic chemicals;
4.3, Production of phosphorous-, nitrogen- or potassium-based fertilisers;
4.4, Production of plant protection products or of biocides;
4.5, Production of pharmaceutical products including intermediates;
4.6. Production of explosives. Reducing chemical oxygen demand (COD) to water. The BAT-AEL emission level is < 30 - 100 mg/l.
valid
2019-04-23
2019-04-23
CWW-COD-BAT10-IV
Common Waste Water and Waste Gas Treatment/ Management Systems in the Chemical Sector - COD - BAT10-IV
6, Other activities: 6,11 Independently operated treatment of waste water not covered by Directive 91/271/EEC and discharged by an installation undertaking activities covered under Section 4. of Annex I Reducing chemical oxygen demand (COD) to water. The BAT-AEL emission level is < 30 - 100 mg/l.
valid
2019-04-23
2019-04-23
CWW-Cr-BAT10-XV
Common Waste Water and Waste Gas Treatment/ Management Systems in the Chemical Sector - Cr - BAT10-XV
4, Chemical industry: 4.1, Production of organic chemicals;
4.2, Production of inorganic chemicals;
4.3, Production of phosphorous-, nitrogen- or potassium-based fertilisers;
4.4, Production of plant protection products or of biocides;
4.5, Production of pharmaceutical products including intermediates;
4.6. Production of explosives. Reducing chromium to water. The BAT-AEL emission level is 5 - 25 μg/l.
valid
2019-04-23
2019-04-23
CWW-Cr-BAT10-XVI
Common Waste Water and Waste Gas Treatment/ Management Systems in the Chemical Sector - Cr - BAT10-XVI
6, Other activities: 6,11 Independently operated treatment of waste water not covered by Directive 91/271/EEC and discharged by an installation undertaking activities covered under Section 4. of Annex I Reducing chromium to water. The BAT-AEL emission level is 5 - 25 μg/l.
valid
2019-04-23
2019-04-23
CWW-Cu-BAT10-XVII
Common Waste Water and Waste Gas Treatment/ Management Systems in the Chemical Sector - Cu - BAT10-XVII
4, Chemical industry: 4.1, Production of organic chemicals;
4.2, Production of inorganic chemicals;
4.3, Production of phosphorous-, nitrogen- or potassium-based fertilisers;
4.4, Production of plant protection products or of biocides;
4.5, Production of pharmaceutical products including intermediates;
4.6. Production of explosives. Reducing copper to water. The BAT-AEL emission level is 5 - 50 μg/l.
valid
2019-04-23
2019-04-23
CWW-Cu-BAT10-XVIII
Common Waste Water and Waste Gas Treatment/ Management Systems in the Chemical Sector - Cu - BAT10-XVIII
6, Other activities: 6,11 Independently operated treatment of waste water not covered by Directive 91/271/EEC and discharged by an installation undertaking activities covered under Section 4. of Annex I Reducing copper to water. The BAT-AEL emission level is 5 - 50 μg/l.
valid
2019-04-23
2019-04-23
CWW-InorgN-BAT10-IX
Common Waste Water and Waste Gas Treatment/ Management Systems in the Chemical Sector - InorgN - BAT10-IX
4, Chemical industry: 4.1, Production of organic chemicals;
4.2, Production of inorganic chemicals;
4.3, Production of phosphorous-, nitrogen- or potassium-based fertilisers;
4.4, Production of plant protection products or of biocides;
4.5, Production of pharmaceutical products including intermediates;
4.6. Production of explosives. Reducing total inorganic nitrogen (N inorg) to water. The BAT-AEL emission level is 5 - 20 mg/l.
valid
2019-04-23
2019-04-23
CWW-InorgN-BAT10-X
Common Waste Water and Waste Gas Treatment/ Management Systems in the Chemical Sector - InorgN - BAT10-X
6, Other activities: 6,11 Independently operated treatment of waste water not covered by Directive 91/271/EEC and discharged by an installation undertaking activities covered under Section 4. of Annex I Reducing total inorganic nitrogen (N inorg) to water. The BAT-AEL emission level is 5 - 20 mg/l.
valid
2019-04-23
2019-04-23
CWW-Ni-BAT10-XIX
Common Waste Water and Waste Gas Treatment/ Management Systems in the Chemical Sector - Ni - BAT10-XIX
4, Chemical industry: 4.1, Production of organic chemicals;
4.2, Production of inorganic chemicals;
4.3, Production of phosphorous-, nitrogen- or potassium-based fertilisers;
4.4, Production of plant protection products or of biocides;
4.5, Production of pharmaceutical products including intermediates;
4.6. Production of explosives. Reducing nickel to water. The BAT-AEL emission level is 5 - 50 μg/l.
valid
2019-04-23
2019-04-23
CWW-Ni-BAT10-XX
Common Waste Water and Waste Gas Treatment/ Management Systems in the Chemical Sector - Ni - BAT10-XX
6, Other activities: 6,11 Independently operated treatment of waste water not covered by Directive 91/271/EEC and discharged by an installation undertaking activities covered under Section 4. of Annex I Reducing nickel to water. The BAT-AEL emission level is 5 - 50 μg/l.
valid
2019-04-23
2019-04-23
CWW-TN-BAT10-VII
Common Waste Water and Waste Gas Treatment/ Management Systems in the Chemical Sector - TN - BAT10-VII
4, Chemical industry: 4.1, Production of organic chemicals;
4.2, Production of inorganic chemicals;
4.3, Production of phosphorous-, nitrogen- or potassium-based fertilisers;
4.4, Production of plant protection products or of biocides;
4.5, Production of pharmaceutical products including intermediates;
4.6. Production of explosives. Reducing total nitrogen (TN) to water. The BAT-AEL emission level is 5 - 25 mg/l.
valid
2019-04-23
2019-04-23
CWW-TN-BAT10-VIII
Common Waste Water and Waste Gas Treatment/ Management Systems in the Chemical Sector - TN - BAT10-VIII
6, Other activities: 6,11 Independently operated treatment of waste water not covered by Directive 91/271/EEC and discharged by an installation undertaking activities covered under Section 4. of Annex I Reducing total nitrogen (TN) to water. The BAT-AEL emission level is 5 - 25 mg/l.
valid
2019-04-23
2019-04-23
CWW-TOC-BAT10-I
Common Waste Water and Waste Gas Treatment/ Management Systems in the Chemical Sector - TOC - BAT10-I
4, Chemical industry: 4.1, Production of organic chemicals;
4.2, Production of inorganic chemicals;
4.3, Production of phosphorous-, nitrogen- or potassium-based fertilisers;
4.4, Production of plant protection products or of biocides;
4.5, Production of pharmaceutical products including intermediates;
4.6. Production of explosives. Reducing total organic carbon (TOC) to water. The BAT-AEL emission level is < 10 - 33 mg/l.
valid
2019-04-23
2019-04-23
CWW-TOC-BAT10-II
Common Waste Water and Waste Gas Treatment/ Management Systems in the Chemical Sector - TOC - BAT10-II
6, Other activities: 6,11 Independently operated treatment of waste water not covered by Directive 91/271/EEC and discharged by an installation undertaking activities covered under Section 4. of Annex I Reducing total organic carbon (TOC) to water. The BAT-AEL emission level is < 10 - 33 mg/l.
valid
2019-04-23
2019-04-23
CWW-TP-BAT10-XI
Common Waste Water and Waste Gas Treatment/ Management Systems in the Chemical Sector - TP - BAT10-XI
4, Chemical industry: 4.1, Production of organic chemicals;
4.2, Production of inorganic chemicals;
4.3, Production of phosphorous-, nitrogen- or potassium-based fertilisers;
4.4, Production of plant protection products or of biocides;
4.5, Production of pharmaceutical products including intermediates;
4.6. Production of explosives. Reducing total phosphorus (TP) to water. The BAT-AEL emission level is 0,5 - 3 mg/l.
valid
2019-04-23
2019-04-23
CWW-TP-BAT10-XII
Common Waste Water and Waste Gas Treatment/ Management Systems in the Chemical Sector - TP - BAT10-XII
6, Other activities: 6,11 Independently operated treatment of waste water not covered by Directive 91/271/EEC and discharged by an installation undertaking activities covered under Section 4. of Annex I Reducing total phosphorus (TP) to water. The BAT-AEL emission level is 0,5 - 3 mg/l.
valid
2019-04-23
2019-04-23
CWW-TSS-BAT10-V
Common Waste Water and Waste Gas Treatment/ Management Systems in the Chemical Sector - TSS - BAT10-V
4, Chemical industry: 4.1, Production of organic chemicals;
4.2, Production of inorganic chemicals;
4.3, Production of phosphorous-, nitrogen- or potassium-based fertilisers;
4.4, Production of plant protection products or of biocides;
4.5, Production of pharmaceutical products including intermediates;
4.6. Production of explosives. Reducing total suspended solids (TSS) to water. The BAT-AEL emission level is 5 - 35 mg/l.
valid
2019-04-23
2019-04-23
CWW-TSS-BAT10-VI
Common Waste Water and Waste Gas Treatment/ Management Systems in the Chemical Sector - TSS - BAT10-VI
6, Other activities: 6,11 Independently operated treatment of waste water not covered by Directive 91/271/EEC and discharged by an installation undertaking activities covered under Section 4. of Annex I Reducing total suspended solids (TSS) to water. The BAT-AEL emission level is 5 - 35 mg/l.
valid
2019-04-23
2019-04-23
CWW-Zn-BAT10-XXI
Common Waste Water and Waste Gas Treatment/ Management Systems in the Chemical Sector - Zn - BAT10-XXI
4, Chemical industry: 4.1, Production of organic chemicals;
4.2, Production of inorganic chemicals;
4.3, Production of phosphorous-, nitrogen- or potassium-based fertilisers;
4.4, Production of plant protection products or of biocides;
4.5, Production of pharmaceutical products including intermediates;
4.6. Production of explosives. Reducing zinc to water. The BAT-AEL emission level is 20 - 300 μg/l.
valid
2019-04-23
2019-04-23
CWW-Zn-BAT10-XXII
Common Waste Water and Waste Gas Treatment/ Management Systems in the Chemical Sector - Zn - BAT10-XXII
6, Other activities: 6,11 Independently operated treatment of waste water not covered by Directive 91/271/EEC and discharged by an installation undertaking activities covered under Section 4. of Annex I Reducing zinc to water. The BAT-AEL emission level is 20 - 300 μg/l.
valid
2019-04-23
2019-04-23
FDM-COD-BAT12-I
Food, Drink and Milk Industries - COD - BAT12-I
Other activities reducing chemical oxygen demand (COD) to water. The BAT-AEL emission level is 25–100 mg/l.
valid
2020-05-25
2020-05-25
FDM-Dust-BAT17-I
Food, Drink and Milk Industries - Dust - BAT17-I
Other activities reducing dust emissions to air. The BAT-AEL emission level is < 2–10 mg/Nm3.
valid
2020-05-25
2020-05-25
FDM-Dust-BAT17-II
Food, Drink and Milk Industries - Dust - BAT17-II
Other activities reducing dust emissions to air. The BAT-AEL emission level is < 2–5 mg/Nm3.
valid
2020-05-25
2020-05-25
FDM-Dust-BAT17-III
Food, Drink and Milk Industries - Dust - BAT17-III
Other activities reducing dust emissions to air. The BAT-AEL emission level is < 2–20 mg/Nm3.
valid
2020-05-25
2020-05-25
FDM-Dust-BAT20-I
Food, Drink and Milk Industries - Dust - BAT20-I
Other activities reducing dust emissions to air. The BAT-AEL emission level is < 2–10 mg/Nm3.
valid
2020-05-25
2020-05-25
FDM-Dust-BAT20-II
Food, Drink and Milk Industries - Dust - BAT20-II
Other activities reducing dust emissions to air. The BAT-AEL emission level is < 2–5 mg/Nm3.
valid
2020-05-25
2020-05-25
FDM-Dust-BAT23
Food, Drink and Milk Industries - Dust - BAT23
Other activities reducing dust emissions to air. The BAT-AEL emission level is < 2–10 mg/Nm3.
valid
2020-05-25
2020-05-25
FDM-Dust-BAT28
Food, Drink and Milk Industries - Dust - BAT28
Other activities reducing dust emissions to air. The BAT-AEL emission level is < 2–5 mg/Nm3.
valid
2020-05-25
2020-05-25
FDM-Dust-BAT31-I
Food, Drink and Milk Industries - Dust - BAT31-I
Other activities reducing dust emissions to air. The BAT-AEL emission level is < 2–10 mg/Nm3.
valid
2020-05-25
2020-05-25
FDM-Dust-BAT31-II
Food, Drink and Milk Industries - Dust - BAT31-II
Other activities reducing dust emissions to air. The BAT-AEL emission level is < 2–5 mg/Nm3.
valid
2020-05-25
2020-05-25
FDM-Dust-BAT34-I
Food, Drink and Milk Industries - Dust - BAT34-I
Other activities reducing dust emissions to air. The BAT-AEL emission level is < 2–10 mg/Nm3.
valid
2020-05-25
2020-05-25
FDM-Dust-BAT34-II
Food, Drink and Milk Industries - Dust - BAT34-II
Other activities reducing dust emissions to air. The BAT-AEL emission level is < 2–5 mg/Nm3.
valid
2020-05-25
2020-05-25
FDM-Dust-BAT36
Food, Drink and Milk Industries - Dust - BAT36
Other activities reducing dust emissions to air. The BAT-AEL emission level is 5–100 mg/Nm3.
valid
2020-05-25
2020-05-25
FDM-SOx-BAT37
Food, Drink and Milk Industries - SOx - BAT37
Other activities reducing sulphur oxides (SOx) emissions to air. The BAT-AEL emission level is 30–100 mg/Nm3.
valid
2020-05-25
2020-05-25
FDM-TN-BAT12-III
Food, Drink and Milk Industries - TN - BAT12-III
Other activities reducing total nitrogen to water. The BAT-AEL emission level is 2–20 mg/l.
valid
2020-05-25
2020-05-25
FDM-TP-BAT12-IV
Food, Drink and Milk Industries - TP - BAT12-IV
Other activities reducing total phosphorus to water. The BAT-AEL emission level is 0.2–2 mg/l.
valid
2020-05-25
2020-05-25
FDM-TSS-BAT12-II
Food, Drink and Milk Industries - TSS - BAT12-II
Other activities reducing total suspended solids to water. The BAT-AEL emission level is 4–50 mg/l.
valid
2020-05-25
2020-05-25
FDM-TVOC-BAT26
Food, Drink and Milk Industries - TVOC - BAT26
Other activities reducing volatile organic compounds (VOC) emissions to air. The BAT-AEL emission level is 15–50 mg/Nm3.
valid
2020-05-25
2020-05-25
FDM-TVOC-BAT29
Food, Drink and Milk Industries - TVOC - BAT29
Other activities reducing volatile organic compounds (VOC) emissions to air. The BAT-AEL emission level is 3–50 mg/Nm3.
valid
2020-05-25
2020-05-25
GLS-Amines-BAT63-V
Manufacture of Glass - Amines - BAT63-V
3, Mineral industry: 3,4 Melting mineral substances including the production of mineral fibres with a melting capacity exceeding 20 tonnes per day; Techniques (i)-(v) (see table); Reducing amines emissions to air. The BAT-AEL emission level is < 3 mg/Nm3.
valid
2019-04-23
2019-04-23
GLS-Amines-BAT63-XI
Manufacture of Glass - Amines - BAT63-XI
3, Mineral industry: 3,4 Melting mineral substances including the production of mineral fibres with a melting capacity exceeding 20 tonnes per day; Techniques (i)-(v) (see table); Reducing amines emissions to air. The BAT-AEL emission level is < 2 mg/Nm3.
valid
2019-04-23
2019-04-23
GLS-Amines-BAT63-XVIII
Manufacture of Glass - Amines - BAT63-XVIII
3, Mineral industry: 3,4 Melting mineral substances including the production of mineral fibres with a melting capacity exceeding 20 tonnes per day; Techniques (i)-(v) (see table); Reducing amines emissions to air. The BAT-AEL emission level is < 0,01 kg/t.
valid
2019-04-23
2019-04-23
GLS-As-BAT13-IX
Manufacture of Glass - As - BAT13-IX
3, Mineral industry: 3,3 Manufacture of glass including glass fibre with a melting capacity exceeding 20 tonnes per day Reducing arsenic to water. The BAT-AEL emission level is < 0,3 mg/l.
valid
2019-04-23
2019-04-23
GLS-B-BAT13-XVIII
Manufacture of Glass - B - BAT13-XVIII
3, Mineral industry: 3,3 Manufacture of glass including glass fibre with a melting capacity exceeding 20 tonnes per day Reducing boron to water. The BAT-AEL emission level is < 1 - 3 mg/l.
valid
2019-04-23
2019-04-23
GLS-Ba-BAT13-X
Manufacture of Glass - Ba - BAT13-X
3, Mineral industry: 3,3 Manufacture of glass including glass fibre with a melting capacity exceeding 20 tonnes per day Reducing barium to water. The BAT-AEL emission level is < 3 mg/l.
valid
2019-04-23
2019-04-23
GLS-C-BAT37-IV
Manufacture of Glass - C - BAT37-IV
3, Mineral industry: 3,3 Manufacture of glass including glass fibre with a melting capacity exceeding 20 tonnes per day; Techniques (i)-(iii) (see table); Reducing total volatile organic compounds emissions to air. The BAT-AEL emission level is < 20 mg/Nm3.
valid
2019-04-23
2019-04-23
GLS-C-BAT63-VI
Manufacture of Glass - C - BAT63-VI
3, Mineral industry: 3,4 Melting mineral substances including the production of mineral fibres with a melting capacity exceeding 20 tonnes per day; Techniques (i)-(v) (see table); Reducing total volatile organic compounds emissions to air. The BAT-AEL emission level is 10 - 30 mg/Nm3.
valid
2019-04-23
2019-04-23
GLS-C-BAT63-XII
Manufacture of Glass - C - BAT63-XII
3, Mineral industry: 3,4 Melting mineral substances including the production of mineral fibres with a melting capacity exceeding 20 tonnes per day; Techniques (i)-(v) (see table); Reducing total volatile organic compounds emissions to air. The BAT-AEL emission level is < 10 mg/Nm3.
valid
2019-04-23
2019-04-23
GLS-C-BAT63-XIX
Manufacture of Glass - C - BAT63-XIX
3, Mineral industry: 3,4 Melting mineral substances including the production of mineral fibres with a melting capacity exceeding 20 tonnes per day; Techniques (i)-(v) (see table); Reducing total volatile organic compounds emissions to air. The BAT-AEL emission level is < 0,065 kg/t.
valid
2019-04-23
2019-04-23
GLS-C-BAT70
Manufacture of Glass - C - BAT70
3, Mineral industry: 3,4 Melting mineral substances including the production of mineral fibres with a melting capacity exceeding 20 tonnes per day; Techniques (i)-(iii) (see table); Reducing volatile organic compounds emissions to air. The BAT-AEL emission level is 10 - 20 mg/Nm3.
valid
2019-04-23
2019-04-23
GLS-C6H6O-BAT13-XIX
Manufacture of Glass - C6H6O - BAT13-XIX
3, Mineral industry: 3,3 Manufacture of glass including glass fibre with a melting capacity exceeding 20 tonnes per day Reducing phenol to water. The BAT-AEL emission level is < 1 mg/l.
valid
2019-04-23
2019-04-23
GLS-C6H6O-BAT63-II
Manufacture of Glass - C6H6O - BAT63-II
3, Mineral industry: 3,4 Melting mineral substances including the production of mineral fibres with a melting capacity exceeding 20 tonnes per day; Techniques (i)-(v) (see table); Reducing phenol emissions to air. The BAT-AEL emission level is < 5 - 10 mg/Nm3.
valid
2019-04-23
2019-04-23
GLS-C6H6O-BAT63-VIII
Manufacture of Glass - C6H6O - BAT63-VIII
3, Mineral industry: 3,4 Melting mineral substances including the production of mineral fibres with a melting capacity exceeding 20 tonnes per day; Techniques (i)-(v) (see table); Reducing phenol emissions to air. The BAT-AEL emission level is < 2 - 5 mg/Nm3.
valid
2019-04-23
2019-04-23
GLS-C6H6O-BAT63-XV
Manufacture of Glass - C6H6O - BAT63-XV
3, Mineral industry: 3,4 Melting mineral substances including the production of mineral fibres with a melting capacity exceeding 20 tonnes per day; Techniques (i)-(v) (see table); Reducing phenol emissions to air. The BAT-AEL emission level is < 0,03 kg/t.
valid
2019-04-23
2019-04-23
GLS-CH2O-BAT37-II
Manufacture of Glass - CH2O - BAT37-II
3, Mineral industry: 3,3 Manufacture of glass including glass fibre with a melting capacity exceeding 20 tonnes per day; Techniques (i)-(iii) (see table); Reducing formaldehyde emissions to air. The BAT-AEL emission level is < 10 mg/Nm3.
valid
2019-04-23
2019-04-23
GLS-CH2O-BAT63-III
Manufacture of Glass - CH2O - BAT63-III
3, Mineral industry: 3,4 Melting mineral substances including the production of mineral fibres with a melting capacity exceeding 20 tonnes per day; Techniques (i)-(v) (see table); Reducing formaldehyde emissions to air. The BAT-AEL emission level is < 2 - 5 mg/Nm3.
valid
2019-04-23
2019-04-23
GLS-CH2O-BAT63-IX
Manufacture of Glass - CH2O - BAT63-IX
3, Mineral industry: 3,4 Melting mineral substances including the production of mineral fibres with a melting capacity exceeding 20 tonnes per day; Techniques (i)-(v) (see table); Reducing formaldehyde emissions to air. The BAT-AEL emission level is < 2 - 5 mg/Nm3.
valid
2019-04-23
2019-04-23
GLS-CH2O-BAT63-XVI
Manufacture of Glass - CH2O - BAT63-XVI
3, Mineral industry: 3,4 Melting mineral substances including the production of mineral fibres with a melting capacity exceeding 20 tonnes per day; Techniques (i)-(v) (see table); Reducing formaldehyde emissions to air. The BAT-AEL emission level is < 0,03 kg/t.
valid
2019-04-23
2019-04-23
GLS-CO-BAT9
Manufacture of Glass - CO - BAT9
3, Mineral industry: 3,3 Manufacture of glass including glass fibre with a melting capacity exceeding 20 tonnes per day; Techniques (see table); Reducing carbon monoxide (CO) emissions to air. The BAT-AEL emission level is < 100 mg/Nm3.
valid
2019-04-23
2019-04-23
GLS-COD-BAT13-III
Manufacture of Glass - COD - BAT13-III
3, Mineral industry: 3,3 Manufacture of glass including glass fibre with a melting capacity exceeding 20 tonnes per day Reducing chemical oxygen demand (COD) to water. The BAT-AEL emission level is < 5 - 130 mg/l.
valid
2019-04-23
2019-04-23
GLS-Cd-BAT13-XIV
Manufacture of Glass - Cd - BAT13-XIV
3, Mineral industry: 3,3 Manufacture of glass including glass fibre with a melting capacity exceeding 20 tonnes per day Reducing cadmium to water. The BAT-AEL emission level is < 0,05 mg/l.
valid
2019-04-23
2019-04-23
GLS-Cr-BAT13-XIII
Manufacture of Glass - Cr - BAT13-XIII
3, Mineral industry: 3,3 Manufacture of glass including glass fibre with a melting capacity exceeding 20 tonnes per day Reducing chromium to water. The BAT-AEL emission level is < 0,3 mg/l.
valid
2019-04-23
2019-04-23
GLS-Cu-BAT13-XII
Manufacture of Glass - Cu - BAT13-XII
3, Mineral industry: 3,3 Manufacture of glass including glass fibre with a melting capacity exceeding 20 tonnes per day Reducing copper to water. The BAT-AEL emission level is < 0,3 mg/l.
valid
2019-04-23
2019-04-23
GLS-Dust-BAT16-I
Manufacture of Glass - Dust - BAT16-I
3, Mineral industry: 3,3 Manufacture of glass including glass fibre with a melting capacity exceeding 20 tonnes per day; Flue-gas cleaning system such as electrostatic precipitator or bag filter (see table); Reducing dust emissions to air. The BAT-AEL emission level is < 10 - 20 mg/Nm3.
valid
2019-04-23
2019-04-23
GLS-Dust-BAT16-II
Manufacture of Glass - Dust - BAT16-II
3, Mineral industry: 3,3 Manufacture of glass including glass fibre with a melting capacity exceeding 20 tonnes per day; Flue-gas cleaning system such as electrostatic precipitator or bag filter (see table); Reducing dust emissions to air. The BAT-AEL emission level is < 0,015 - 0,06 kg/t.
valid
2019-04-23
2019-04-23
GLS-Dust-BAT22-I
Manufacture of Glass - Dust - BAT22-I
3, Mineral industry: 3,3 Manufacture of glass including glass fibre with a melting capacity exceeding 20 tonnes per day; Techniques (i)-(iii) (see table); Reducing dust emissions to air. The BAT-AEL emission level is < 10 mg/Nm3.
valid
2019-04-23
2019-04-23
GLS-Dust-BAT24-I
Manufacture of Glass - Dust - BAT24-I
3, Mineral industry: 3,3 Manufacture of glass including glass fibre with a melting capacity exceeding 20 tonnes per day; Electrostatic precipitator or bag filter system; Reducing dust emissions to air. The BAT-AEL emission level is < 10 - 20 mg/Nm3.
valid
2019-04-23
2019-04-23
GLS-Dust-BAT24-II
Manufacture of Glass - Dust - BAT24-II
3, Mineral industry: 3,3 Manufacture of glass including glass fibre with a melting capacity exceeding 20 tonnes per day; Electrostatic precipitator or bag filter system; Reducing dust emissions to air. The BAT-AEL emission level is < 0,025 - 0,05 kg/t.
valid
2019-04-23
2019-04-23
GLS-Dust-BAT31-I
Manufacture of Glass - Dust - BAT31-I
3, Mineral industry: 3,3 Manufacture of glass including glass fibre with a melting capacity exceeding 20 tonnes per day; Techniques (i)-(iv) (see table); Reducing dust emissions to air. The BAT-AEL emission level is < 15 - 20 mg/Nm3.
valid
2019-04-23
2019-04-23
GLS-Dust-BAT32-I
Manufacture of Glass - Dust - BAT32-I
3, Mineral industry: 3,3 Manufacture of glass including glass fibre with a melting capacity exceeding 20 tonnes per day; Techniques (i)-(iii) (see table); Reducing dust emissions to air. The BAT-AEL emission level is < 10 - 20 mg/Nm3.
valid
2019-04-23
2019-04-23
GLS-Dust-BAT32-II
Manufacture of Glass - Dust - BAT32-II
3, Mineral industry: 3,3 Manufacture of glass including glass fibre with a melting capacity exceeding 20 tonnes per day; Techniques (i)-(iii) (see table); Reducing dust emissions to air. The BAT-AEL emission level is < 0,045 - 0,09 kg/t.
valid
2019-04-23
2019-04-23
GLS-Dust-BAT37-I
Manufacture of Glass - Dust - BAT37-I
3, Mineral industry: 3,3 Manufacture of glass including glass fibre with a melting capacity exceeding 20 tonnes per day; Techniques (i)-(iii) (see table); Reducing dust emissions to air. The BAT-AEL emission level is < 5 - 20 mg/Nm3.
valid
2019-04-23
2019-04-23
GLS-Dust-BAT37-V
Manufacture of Glass - Dust - BAT37-V
3, Mineral industry: 3,3 Manufacture of glass including glass fibre with a melting capacity exceeding 20 tonnes per day; Techniques (i)-(iii) (see table); Reducing dust emissions to air. The BAT-AEL emission level is < 5 - 20 mg/Nm3.
valid
2019-04-23
2019-04-23
GLS-Dust-BAT38-I
Manufacture of Glass - Dust - BAT38-I
3, Mineral industry: 3,3 Manufacture of glass including glass fibre with a melting capacity exceeding 20 tonnes per day; Techniques (i)-(v) (see table); Reducing dust emissions to air. The BAT-AEL emission level is < 10 - 20 mg/Nm3.
valid
2019-04-23
2019-04-23
GLS-Dust-BAT38-II
Manufacture of Glass - Dust - BAT38-II
3, Mineral industry: 3,3 Manufacture of glass including glass fibre with a melting capacity exceeding 20 tonnes per day; Techniques (i)-(v) and batch formulations with significant amounts of dangerous substances (EC No 1272/2008); Reducing dust emissions to air. The BAT-AEL emission level is < 1 - 10 mg/Nm3.
valid
2019-04-23
2019-04-23
GLS-Dust-BAT38-III
Manufacture of Glass - Dust - BAT38-III
3, Mineral industry: 3,3 Manufacture of glass including glass fibre with a melting capacity exceeding 20 tonnes per day; Techniques (i)-(v) (see table); Reducing dust emissions to air. The BAT-AEL emission level is < 0,03 - 0,06 kg/t.
valid
2019-04-23
2019-04-23
GLS-Dust-BAT38-IV
Manufacture of Glass - Dust - BAT38-IV
3, Mineral industry: 3,3 Manufacture of glass including glass fibre with a melting capacity exceeding 20 tonnes per day; Techniques (i)-(v) and batch formulations with significant amounts of dangerous substances (EC No 1272/2008); Reducing dust emissions to air. The BAT-AEL emission level is < 0,003 - 0,03 kg/t.
valid
2019-04-23
2019-04-23
GLS-Dust-BAT46-I
Manufacture of Glass - Dust - BAT46-I
3, Mineral industry: 3,3 Manufacture of glass including glass fibre with a melting capacity exceeding 20 tonnes per day; Techniques (i)-(ii) (see table); Reducing dust emissions to air. The BAT-AEL emission level is < 1 - 10 mg/Nm3.
valid
2019-04-23
2019-04-23
GLS-Dust-BAT48-I
Manufacture of Glass - Dust - BAT48-I
3, Mineral industry: 3,3 Manufacture of glass including glass fibre with a melting capacity exceeding 20 tonnes per day; Techniques (i)-(iii) (see table); Reducing dust emissions to air. The BAT-AEL emission level is < 10 - 20 mg/Nm3.
valid
2019-04-23
2019-04-23
GLS-Dust-BAT48-II
Manufacture of Glass - Dust - BAT48-II
3, Mineral industry: 3,3 Manufacture of glass including glass fibre with a melting capacity exceeding 20 tonnes per day; Techniques (i)-(iii) (see table) and batch formulations with significant amounts of dangerous substances (EC No 1272/2008); Reducing dust emissions to air. The BAT-AEL emission level is < 1 - 10 mg/Nm3.
valid
2019-04-23
2019-04-23
GLS-Dust-BAT48-III
Manufacture of Glass - Dust - BAT48-III
3, Mineral industry: 3,3 Manufacture of glass including glass fibre with a melting capacity exceeding 20 tonnes per day; Techniques (i)-(iii) (see table); Reducing dust emissions to air. The BAT-AEL emission level is < 0,03 - 0,13 kg/t.
valid
2019-04-23
2019-04-23
GLS-Dust-BAT48-IV
Manufacture of Glass - Dust - BAT48-IV
3, Mineral industry: 3,3 Manufacture of glass including glass fibre with a melting capacity exceeding 20 tonnes per day; Techniques (i)-(iii) (see table) and batch formulations with significant amounts of dangerous substances (EC No 1272/2008); Reducing dust emissions to air. The BAT-AEL emission level is < 0,003 - 0,065 kg/t.
valid
2019-04-23
2019-04-23
GLS-Dust-BAT54-I
Manufacture of Glass - Dust - BAT54-I
3, Mineral industry: 3,3 Manufacture of glass including glass fibre with a melting capacity exceeding 20 tonnes per day; Techniques (i)-(ii) (see table); Reducing dust emissions to air. The BAT-AEL emission level is 1 - 10 mg/Nm3.
valid
2019-04-23
2019-04-23
GLS-Dust-BAT56-I
Manufacture of Glass - Dust - BAT56-I
3, Mineral industry: 3,4 Melting mineral substances including the production of mineral fibres with a melting capacity exceeding 20 tonnes per day; Electrostatic precipitator or bag filter system; Reducing dust emissions to air. The BAT-AEL emission level is < 10 - 20 mg/Nm3.
valid
2019-04-23
2019-04-23
GLS-Dust-BAT56-II
Manufacture of Glass - Dust - BAT56-II
3, Mineral industry: 3,4 Melting mineral substances including the production of mineral fibres with a melting capacity exceeding 20 tonnes per day; Electrostatic precipitator or bag filter system; Reducing dust emissions to air. The BAT-AEL emission level is < 0,02 - 0,05 kg/t.
valid
2019-04-23
2019-04-23
GLS-Dust-BAT64
Manufacture of Glass - Dust - BAT64
3, Mineral industry: 3,4 Melting mineral substances including the production of mineral fibres with a melting capacity exceeding 20 tonnes per day; Flue-gas cleaning by bag filter system; Reducing dust emissions to air. The BAT-AEL emission level is < 5 - 20 mg/Nm3.
valid
2019-04-23
2019-04-23
GLS-Dust-BAT65
Manufacture of Glass - Dust - BAT65
3, Mineral industry: 3,4 Melting mineral substances including the production of mineral fibres with a melting capacity exceeding 20 tonnes per day; Techniques (i)-(iii) (see table); Reducing dust emissions to air. The BAT-AEL emission level is 1 - 5 mg/Nm3.
valid
2019-04-23
2019-04-23
GLS-Dust-BAT71-I
Manufacture of Glass - Dust - BAT71-I
3, Mineral industry: 3,4 Melting mineral substances including the production of mineral fibres with a melting capacity exceeding 20 tonnes per day; Electrostatic precipitator or bag filter system; Reducing dust emissions to air. The BAT-AEL emission level is < 10 - 20 mg/Nm3.
valid
2019-04-23
2019-04-23
GLS-Dust-BAT71-II
Manufacture of Glass - Dust - BAT71-II
3, Mineral industry: 3,4 Melting mineral substances including the production of mineral fibres with a melting capacity exceeding 20 tonnes per day; Electrostatic precipitator or bag filter system; Reducing dust emissions to air. The BAT-AEL emission level is < 0,05 - 0,15 kg/t.
valid
2019-04-23
2019-04-23
GLS-Dust-BAT76-I
Manufacture of Glass - Dust - BAT76-I
3, Mineral industry: 3,4 Melting mineral substances including the production of mineral fibres with a melting capacity exceeding 20 tonnes per day; Techniques (i)-(iii) (see table); Reducing dust emissions to air. The BAT-AEL emission level is 5 - 10 mg/Nm3.
valid
2019-04-23
2019-04-23
GLS-F-BAT13-V
Manufacture of Glass - F - BAT13-V
3, Mineral industry: 3,3 Manufacture of glass including glass fibre with a melting capacity exceeding 20 tonnes per day Reducing fluorides to water. The BAT-AEL emission level is < 6 mg/l.
valid
2019-04-23
2019-04-23
GLS-H2S-BAT61-I
Manufacture of Glass - H2S - BAT61-I
3, Mineral industry: 3,4 Melting mineral substances including the production of mineral fibres with a melting capacity exceeding 20 tonnes per day; Waste gas incineration system to oxidise hydrogen sulphide to SO2; Reducing hydrogen sulphide emissions to air. The BAT-AEL emission level is < 2 mg/Nm3.
valid
2019-04-23
2019-04-23
GLS-H2S-BAT61-II
Manufacture of Glass - H2S - BAT61-II
3, Mineral industry: 3,4 Melting mineral substances including the production of mineral fibres with a melting capacity exceeding 20 tonnes per day; Waste gas incineration system to oxidise hydrogen sulphide to SO2; Reducing hydrogen sulphide emissions to air. The BAT-AEL emission level is < 0,005 kg/t.
valid
2019-04-23
2019-04-23
GLS-HCl-BAT20-I
Manufacture of Glass - HCl - BAT20-I
3, Mineral industry: 3,3 Manufacture of glass including glass fibre with a melting capacity exceeding 20 tonnes per day; Techniques (i)-(ii) (see table); Reducing hydrogen chloride emissions to air. The BAT-AEL emission level is < 10 - 20 mg/Nm3.
valid
2019-04-23
2019-04-23
GLS-HCl-BAT20-III
Manufacture of Glass - HCl - BAT20-III
3, Mineral industry: 3,3 Manufacture of glass including glass fibre with a melting capacity exceeding 20 tonnes per day; Techniques (i)-(ii) (see table); Reducing hydrogen chloride emissions to air. The BAT-AEL emission level is < 0,02 - 0,03 kg/t.
valid
2019-04-23
2019-04-23
GLS-HCl-BAT22-IV
Manufacture of Glass - HCl - BAT22-IV
3, Mineral industry: 3,3 Manufacture of glass including glass fibre with a melting capacity exceeding 20 tonnes per day; Techniques (i)-(iii) (see table); Reducing hydrogen chloride emissions to air. The BAT-AEL emission level is < 30 mg/Nm3.
valid
2019-04-23
2019-04-23
GLS-HCl-BAT28-I
Manufacture of Glass - HCl - BAT28-I
3, Mineral industry: 3,3 Manufacture of glass including glass fibre with a melting capacity exceeding 20 tonnes per day; Techniques (i)-(ii) (see table); Reducing hydrogen chloride emissions to air. The BAT-AEL emission level is < 10 - 25 mg/Nm3.
valid
2019-04-23
2019-04-23
GLS-HCl-BAT28-III
Manufacture of Glass - HCl - BAT28-III
3, Mineral industry: 3,3 Manufacture of glass including glass fibre with a melting capacity exceeding 20 tonnes per day; Techniques (i)-(ii) (see table); Reducing hydrogen chloride emissions to air. The BAT-AEL emission level is < 0,025 - 0,0625 kg/t.
valid
2019-04-23
2019-04-23
GLS-HCl-BAT31-II
Manufacture of Glass - HCl - BAT31-II
3, Mineral industry: 3,3 Manufacture of glass including glass fibre with a melting capacity exceeding 20 tonnes per day; Techniques (i)-(iv) (see table); Reducing hydrogen chloride emissions to air. The BAT-AEL emission level is < 10 mg/Nm3.
valid
2019-04-23
2019-04-23
GLS-HCl-BAT35-I
Manufacture of Glass - HCl - BAT35-I
3, Mineral industry: 3,3 Manufacture of glass including glass fibre with a melting capacity exceeding 20 tonnes per day; Techniques (i)-(iv) (see table); Reducing hydrogen chloride emissions to air. The BAT-AEL emission level is < 10 mg/Nm3.
valid
2019-04-23
2019-04-23
GLS-HCl-BAT35-III
Manufacture of Glass - HCl - BAT35-III
3, Mineral industry: 3,3 Manufacture of glass including glass fibre with a melting capacity exceeding 20 tonnes per day; Techniques (i)-(iv) (see table); Reducing hydrogen chloride emissions to air. The BAT-AEL emission level is < 0,05 kg/t.
valid
2019-04-23
2019-04-23
GLS-HCl-BAT42-I
Manufacture of Glass - HCl - BAT42-I
3, Mineral industry: 3,3 Manufacture of glass including glass fibre with a melting capacity exceeding 20 tonnes per day; Techniques (i)-(iv) (see table); Reducing hydrogen chloride emissions to air. The BAT-AEL emission level is < 10 - 20 mg/Nm3.
valid
2019-04-23
2019-04-23
GLS-HCl-BAT42-III
Manufacture of Glass - HCl - BAT42-III
3, Mineral industry: 3,3 Manufacture of glass including glass fibre with a melting capacity exceeding 20 tonnes per day; Techniques (i)-(iv) (see table); Reducing hydrogen chloride emissions to air. The BAT-AEL emission level is < 0,03 - 0,06 kg/t.
valid
2019-04-23
2019-04-23
GLS-HCl-BAT52-I
Manufacture of Glass - HCl - BAT52-I
3, Mineral industry: 3,3 Manufacture of glass including glass fibre with a melting capacity exceeding 20 tonnes per day; Techniques (i)-(iii) (see table); Reducing hydrogen chloride emissions to air. The BAT-AEL emission level is < 10 - 20 mg/Nm3.
valid
2019-04-23
2019-04-23
GLS-HCl-BAT52-III
Manufacture of Glass - HCl - BAT52-III
3, Mineral industry: 3,3 Manufacture of glass including glass fibre with a melting capacity exceeding 20 tonnes per day; Techniques (i)-(iii) (see table); Reducing hydrogen chloride emissions to air. The BAT-AEL emission level is < 0,03 - 0,05 kg/t.
valid
2019-04-23
2019-04-23
GLS-HCl-BAT60-I
Manufacture of Glass - HCl - BAT60-I
3, Mineral industry: 3,4 Melting mineral substances including the production of mineral fibres with a melting capacity exceeding 20 tonnes per day; Techniques (i)-(ii) (see table); for glass wool; Reducing hydrogen chloride emissions to air. The BAT-AEL emission level is < 5 - 10 mg/Nm3.
valid
2019-04-23
2019-04-23
GLS-HCl-BAT60-II
Manufacture of Glass - HCl - BAT60-II
3, Mineral industry: 3,4 Melting mineral substances including the production of mineral fibres with a melting capacity exceeding 20 tonnes per day; Techniques (i)-(ii) (see table); for stone wool; Reducing hydrogen chloride emissions to air. The BAT-AEL emission level is < 10 - 30 mg/Nm3.
valid
2019-04-23
2019-04-23
GLS-HCl-BAT60-IV
Manufacture of Glass - HCl - BAT60-IV
3, Mineral industry: 3,4 Melting mineral substances including the production of mineral fibres with a melting capacity exceeding 20 tonnes per day; Techniques (i)-(ii) (see table); for glass wool; Reducing hydrogen chloride emissions to air. The BAT-AEL emission level is < 0,01 - 0,02 kg/t.
valid
2019-04-23
2019-04-23
GLS-HCl-BAT60-V
Manufacture of Glass - HCl - BAT60-V
3, Mineral industry: 3,4 Melting mineral substances including the production of mineral fibres with a melting capacity exceeding 20 tonnes per day; Techniques (i)-(ii) (see table); for stone wool; Reducing hydrogen chloride emissions to air. The BAT-AEL emission level is < 0,025 - 0,075 kg/t.
valid
2019-04-23
2019-04-23
GLS-HCl-BAT68-I
Manufacture of Glass - HCl - BAT68-I
3, Mineral industry: 3,4 Melting mineral substances including the production of mineral fibres with a melting capacity exceeding 20 tonnes per day; Raw materials selection for batch formulation with low content of chlorine and fluorine; Reducing hydrogen chloride emissions to air. The BAT-AEL emission level is < 10 mg/Nm3.
valid
2019-04-23
2019-04-23
GLS-HCl-BAT74-I
Manufacture of Glass - HCl - BAT74-I
3, Mineral industry: 3,4 Melting mineral substances including the production of mineral fibres with a melting capacity exceeding 20 tonnes per day; Techniques (i)-(iii) (see table); Reducing hydrogen chloride emissions to air. The BAT-AEL emission level is < 10 mg/Nm3.
valid
2019-04-23
2019-04-23
GLS-HCl-BAT74-III
Manufacture of Glass - HCl - BAT74-III
3, Mineral industry: 3,4 Melting mineral substances including the production of mineral fibres with a melting capacity exceeding 20 tonnes per day; Techniques (i)-(iii) (see table); Reducing hydrogen chloride emissions to air. The BAT-AEL emission level is < 0,05 kg/t.
valid
2019-04-23
2019-04-23
GLS-HF-BAT20-II
Manufacture of Glass - HF - BAT20-II
3, Mineral industry: 3,3 Manufacture of glass including glass fibre with a melting capacity exceeding 20 tonnes per day; Techniques (i)-(ii) (see table); Reducing hydrogen fluoride emissions to air. The BAT-AEL emission level is < 1 - 5 mg/Nm3.
valid
2019-04-23
2019-04-23
GLS-HF-BAT20-IV
Manufacture of Glass - HF - BAT20-IV
3, Mineral industry: 3,3 Manufacture of glass including glass fibre with a melting capacity exceeding 20 tonnes per day; Techniques (i)-(ii) (see table); Reducing hydrogen fluoride emissions to air. The BAT-AEL emission level is 0,001 - 0,008 kg/t.
valid
2019-04-23
2019-04-23
GLS-HF-BAT28-II
Manufacture of Glass - HF - BAT28-II
3, Mineral industry: 3,3 Manufacture of glass including glass fibre with a melting capacity exceeding 20 tonnes per day; Techniques (i)-(ii) (see table); Reducing hydrogen fluoride emissions to air. The BAT-AEL emission level is < 1 - 4 mg/Nm3.
valid
2019-04-23
2019-04-23
GLS-HF-BAT28-IV
Manufacture of Glass - HF - BAT28-IV
3, Mineral industry: 3,3 Manufacture of glass including glass fibre with a melting capacity exceeding 20 tonnes per day; Techniques (i)-(ii) (see table); Reducing hydrogen fluoride emissions to air. The BAT-AEL emission level is < 0,0025 - 0,01 kg/t.
valid
2019-04-23
2019-04-23
GLS-HF-BAT31-III
Manufacture of Glass - HF - BAT31-III
3, Mineral industry: 3,3 Manufacture of glass including glass fibre with a melting capacity exceeding 20 tonnes per day; Techniques (i)-(iv) (see table); Reducing hydrogen fluoride emissions to air. The BAT-AEL emission level is < 1 - 5 mg/Nm3.
valid
2019-04-23
2019-04-23
GLS-HF-BAT35-II
Manufacture of Glass - HF - BAT35-II
3, Mineral industry: 3,3 Manufacture of glass including glass fibre with a melting capacity exceeding 20 tonnes per day; Techniques (i)-(iv) (see table); Reducing hydrogen fluoride emissions to air. The BAT-AEL emission level is < 5 - 15 mg/Nm3.
valid
2019-04-23
2019-04-23
GLS-HF-BAT35-IV
Manufacture of Glass - HF - BAT35-IV
3, Mineral industry: 3,3 Manufacture of glass including glass fibre with a melting capacity exceeding 20 tonnes per day; Techniques (i)-(iv) (see table); Reducing hydrogen fluoride emissions to air. The BAT-AEL emission level is < 0,02 - 0,07 kg/t.
valid
2019-04-23
2019-04-23
GLS-HF-BAT42-II
Manufacture of Glass - HF - BAT42-II
3, Mineral industry: 3,3 Manufacture of glass including glass fibre with a melting capacity exceeding 20 tonnes per day; Techniques (i)-(iv) (see table); Reducing hydrogen fluoride emissions to air. The BAT-AEL emission level is < 1 - 5 mg/Nm3.
valid
2019-04-23
2019-04-23
GLS-HF-BAT42-IV
Manufacture of Glass - HF - BAT42-IV
3, Mineral industry: 3,3 Manufacture of glass including glass fibre with a melting capacity exceeding 20 tonnes per day; Techniques (i)-(iv) (see table); Reducing hydrogen fluoride emissions to air. The BAT-AEL emission level is < 0,003 - 0,015 kg/t.
valid
2019-04-23
2019-04-23
GLS-HF-BAT47
Manufacture of Glass - HF - BAT47
3, Mineral industry: 3,3 Manufacture of glass including glass fibre with a melting capacity exceeding 20 tonnes per day; Techniques (i)-(ii) (see table); Reducing hydrogen fluoride emissions to air. The BAT-AEL emission level is < 5 mg/Nm3.
valid
2019-04-23
2019-04-23
GLS-HF-BAT52-II
Manufacture of Glass - HF - BAT52-II
3, Mineral industry: 3,3 Manufacture of glass including glass fibre with a melting capacity exceeding 20 tonnes per day; Techniques (i)-(iii) (see table); Reducing hydrogen fluoride emissions to air. The BAT-AEL emission level is < 1 - 5 mg/Nm3.
valid
2019-04-23
2019-04-23
GLS-HF-BAT52-IV
Manufacture of Glass - HF - BAT52-IV
3, Mineral industry: 3,3 Manufacture of glass including glass fibre with a melting capacity exceeding 20 tonnes per day; Techniques (i)-(iii) (see table); Reducing hydrogen fluoride emissions to air. The BAT-AEL emission level is < 0,003 - 0,04 kg/t.
valid
2019-04-23
2019-04-23
GLS-HF-BAT55
Manufacture of Glass - HF - BAT55
3, Mineral industry: 3,3 Manufacture of glass including glass fibre with a melting capacity exceeding 20 tonnes per day; Techniques (i)-(ii) (see table); Reducing hydrogen fluoride emissions to air. The BAT-AEL emission level is < 5 mg/Nm3.
valid
2019-04-23
2019-04-23
GLS-HF-BAT60-III
Manufacture of Glass - HF - BAT60-III
3, Mineral industry: 3,4 Melting mineral substances including the production of mineral fibres with a melting capacity exceeding 20 tonnes per day; Techniques (i)-(ii) (see table); for all products; Reducing hydrogen fluoride emissions to air. The BAT-AEL emission level is < 1 - 5 mg/Nm3.
valid
2019-04-23
2019-04-23
GLS-HF-BAT60-VI
Manufacture of Glass - HF - BAT60-VI
3, Mineral industry: 3,4 Melting mineral substances including the production of mineral fibres with a melting capacity exceeding 20 tonnes per day; Techniques (i)-(ii) (see table); for all products; Reducing hydrogen fluoride emissions to air. The BAT-AEL emission level is < 0,002 - 0,013 kg/t.
valid
2019-04-23
2019-04-23
GLS-HF-BAT68-II
Manufacture of Glass - HF - BAT68-II
3, Mineral industry: 3,4 Melting mineral substances including the production of mineral fibres with a melting capacity exceeding 20 tonnes per day; Raw materials selection for batch formulation with low content of chlorine and fluorine; Reducing hydrogen fluoride emissions to air. The BAT-AEL emission level is < 5 mg/Nm3.
valid
2019-04-23
2019-04-23
GLS-HF-BAT74-II
Manufacture of Glass - HF - BAT74-II
3, Mineral industry: 3,4 Melting mineral substances including the production of mineral fibres with a melting capacity exceeding 20 tonnes per day; Techniques (i)-(iii) (see table); Reducing hydrogen fluoride emissions to air. The BAT-AEL emission level is < 5 mg/Nm3.
valid
2019-04-23
2019-04-23
GLS-HF-BAT74-IV
Manufacture of Glass - HF - BAT74-IV
3, Mineral industry: 3,4 Melting mineral substances including the production of mineral fibres with a melting capacity exceeding 20 tonnes per day; Techniques (i)-(iii) (see table); Reducing hydrogen fluoride emissions to air. The BAT-AEL emission level is < 0,03 kg/t.
valid
2019-04-23
2019-04-23
GLS-Metals-BAT21-I
Manufacture of Glass - Metals - BAT21-I
3, Mineral industry: 3,3 Manufacture of glass including glass fibre with a melting capacity exceeding 20 tonnes per day; Techniques (i)-(iv) (see table); Reducing metals emissions to air. The BAT-AEL emission level is < 0,2 - 1 mg/Nm3.
valid
2019-04-23
2019-04-23
GLS-Metals-BAT21-II
Manufacture of Glass - Metals - BAT21-II
3, Mineral industry: 3,3 Manufacture of glass including glass fibre with a melting capacity exceeding 20 tonnes per day; Techniques (i)-(iv) (see table); Reducing metals emissions to air. The BAT-AEL emission level is < 1 - 5 mg/Nm3.
valid
2019-04-23
2019-04-23
GLS-Metals-BAT21-III
Manufacture of Glass - Metals - BAT21-III
3, Mineral industry: 3,3 Manufacture of glass including glass fibre with a melting capacity exceeding 20 tonnes per day; Techniques (i)-(iv) (see table); Reducing metals emissions to air. The BAT-AEL emission level is < 0,0003 - 0,0015 kg/t.
valid
2019-04-23
2019-04-23
GLS-Metals-BAT21-IV
Manufacture of Glass - Metals - BAT21-IV
3, Mineral industry: 3,3 Manufacture of glass including glass fibre with a melting capacity exceeding 20 tonnes per day; Techniques (i)-(iv) (see table); Reducing metals emissions to air. The BAT-AEL emission level is < 0,0015 - 0,0075 kg/t.
valid
2019-04-23
2019-04-23
GLS-Metals-BAT29-I
Manufacture of Glass - Metals - BAT29-I
3, Mineral industry: 3,3 Manufacture of glass including glass fibre with a melting capacity exceeding 20 tonnes per day; Techniques (i)-(iii) (see table); Reducing metals emissions to air. The BAT-AEL emission level is < 0,2 - 1 mg/Nm3.
valid
2019-04-23
2019-04-23
GLS-Metals-BAT29-II
Manufacture of Glass - Metals - BAT29-II
3, Mineral industry: 3,3 Manufacture of glass including glass fibre with a melting capacity exceeding 20 tonnes per day; Techniques (i)-(iii) (see table); Reducing metals emissions to air. The BAT-AEL emission level is < 1 - 5 mg/Nm3.
valid
2019-04-23
2019-04-23
GLS-Metals-BAT29-III
Manufacture of Glass - Metals - BAT29-III
3, Mineral industry: 3,3 Manufacture of glass including glass fibre with a melting capacity exceeding 20 tonnes per day; Techniques (i)-(iii) (see table); Reducing metals emissions to air. The BAT-AEL emission level is < 0,0005 - 0,0025 kg/t.
valid
2019-04-23
2019-04-23
GLS-Metals-BAT29-IV
Manufacture of Glass - Metals - BAT29-IV
3, Mineral industry: 3,3 Manufacture of glass including glass fibre with a melting capacity exceeding 20 tonnes per day; Techniques (i)-(iii) (see table); Reducing metals emissions to air. The BAT-AEL emission level is < 0,0025 - 0,0125 kg/t.
valid
2019-04-23
2019-04-23
GLS-Metals-BAT31-V
Manufacture of Glass - Metals - BAT31-V
3, Mineral industry: 3,3 Manufacture of glass including glass fibre with a melting capacity exceeding 20 tonnes per day; Techniques (i)-(iv) (see table); Reducing metals emissions to air. The BAT-AEL emission level is < 1 mg/Nm3.
valid
2019-04-23
2019-04-23
GLS-Metals-BAT31-VI
Manufacture of Glass - Metals - BAT31-VI
3, Mineral industry: 3,3 Manufacture of glass including glass fibre with a melting capacity exceeding 20 tonnes per day; Techniques (i)-(iv) (see table); Reducing metals emissions to air. The BAT-AEL emission level is < 5 mg/Nm3.
valid
2019-04-23
2019-04-23
GLS-Metals-BAT36-I
Manufacture of Glass - Metals - BAT36-I
3, Mineral industry: 3,3 Manufacture of glass including glass fibre with a melting capacity exceeding 20 tonnes per day; Techniques (i)-(iii) (see table); Reducing metals emissions to air. The BAT-AEL emission level is < 0,2 - 1 mg/Nm3.
valid
2019-04-23
2019-04-23
GLS-Metals-BAT36-II
Manufacture of Glass - Metals - BAT36-II
3, Mineral industry: 3,3 Manufacture of glass including glass fibre with a melting capacity exceeding 20 tonnes per day; Techniques (i)-(iii) (see table); Reducing metals emissions to air. The BAT-AEL emission level is < 1 - 3 mg/Nm3.
valid
2019-04-23
2019-04-23
GLS-Metals-BAT36-III
Manufacture of Glass - Metals - BAT36-III
3, Mineral industry: 3,3 Manufacture of glass including glass fibre with a melting capacity exceeding 20 tonnes per day; Techniques (i)-(iii) (see table); Reducing metals emissions to air. The BAT-AEL emission level is < 0,0009 - 0,0045 kg/t.
valid
2019-04-23
2019-04-23
GLS-Metals-BAT36-IV
Manufacture of Glass - Metals - BAT36-IV
3, Mineral industry: 3,3 Manufacture of glass including glass fibre with a melting capacity exceeding 20 tonnes per day; Techniques (i)-(iii) (see table); Reducing metals emissions to air. The BAT-AEL emission level is < 0,0045 - 0,0135 kg/t.
valid
2019-04-23
2019-04-23
GLS-Metals-BAT43-I
Manufacture of Glass - Metals - BAT43-I
3, Mineral industry: 3,3 Manufacture of glass including glass fibre with a melting capacity exceeding 20 tonnes per day; Techniques (i)-(iii) (see table); Reducing metals emissions to air. The BAT-AEL emission level is < 0,2 - 1 mg/Nm3.
valid
2019-04-23
2019-04-23
GLS-Metals-BAT43-II
Manufacture of Glass - Metals - BAT43-II
3, Mineral industry: 3,3 Manufacture of glass including glass fibre with a melting capacity exceeding 20 tonnes per day; Techniques (i)-(iii) (see table); Reducing metals emissions to air. The BAT-AEL emission level is < 1 - 5 mg/Nm3.
valid
2019-04-23
2019-04-23
GLS-Metals-BAT43-III
Manufacture of Glass - Metals - BAT43-III
3, Mineral industry: 3,3 Manufacture of glass including glass fibre with a melting capacity exceeding 20 tonnes per day; Techniques (i)-(iii) (see table); Reducing metals emissions to air. The BAT-AEL emission level is < 0,0006 - 0,003 kg/t.
valid
2019-04-23
2019-04-23
GLS-Metals-BAT43-IV
Manufacture of Glass - Metals - BAT43-IV
3, Mineral industry: 3,3 Manufacture of glass including glass fibre with a melting capacity exceeding 20 tonnes per day; Techniques (i)-(iii) (see table); Reducing metals emissions to air. The BAT-AEL emission level is < 0,003 - 0,015 kg/t.
valid
2019-04-23
2019-04-23
GLS-Metals-BAT46-II
Manufacture of Glass - Metals - BAT46-II
3, Mineral industry: 3,3 Manufacture of glass including glass fibre with a melting capacity exceeding 20 tonnes per day; Techniques (i)-(ii) (see table); Reducing metals emissions to air. The BAT-AEL emission level is < 1 mg/Nm3.
valid
2019-04-23
2019-04-23
GLS-Metals-BAT46-III
Manufacture of Glass - Metals - BAT46-III
3, Mineral industry: 3,3 Manufacture of glass including glass fibre with a melting capacity exceeding 20 tonnes per day; Techniques (i)-(ii) (see table); Reducing metals emissions to air. The BAT-AEL emission level is < 1 - 5 mg/Nm3.
valid
2019-04-23
2019-04-23
GLS-Metals-BAT53-I
Manufacture of Glass - Metals - BAT53-I
3, Mineral industry: 3,3 Manufacture of glass including glass fibre with a melting capacity exceeding 20 tonnes per day; Techniques (i)-(iii) (see table); Reducing metals emissions to air. The BAT-AEL emission level is < 0,1 - 1 mg/Nm3.
valid
2019-04-23
2019-04-23
GLS-Metals-BAT53-II
Manufacture of Glass - Metals - BAT53-II
3, Mineral industry: 3,3 Manufacture of glass including glass fibre with a melting capacity exceeding 20 tonnes per day; Techniques (i)-(iii) (see table); Reducing metals emissions to air. The BAT-AEL emission level is < 1 - 5 mg/Nm3.
valid
2019-04-23
2019-04-23
GLS-Metals-BAT53-III
Manufacture of Glass - Metals - BAT53-III
3, Mineral industry: 3,3 Manufacture of glass including glass fibre with a melting capacity exceeding 20 tonnes per day; Techniques (i)-(iii) (see table); Reducing metals emissions to air. The BAT-AEL emission level is < 0,0003 - 0,003 kg/t.
valid
2019-04-23
2019-04-23
GLS-Metals-BAT53-IV
Manufacture of Glass - Metals - BAT53-IV
3, Mineral industry: 3,3 Manufacture of glass including glass fibre with a melting capacity exceeding 20 tonnes per day; Techniques (i)-(iii) (see table); Reducing metals emissions to air. The BAT-AEL emission level is < 0,003 - 0,015 kg/t.
valid
2019-04-23
2019-04-23
GLS-Metals-BAT54-II
Manufacture of Glass - Metals - BAT54-II
3, Mineral industry: 3,3 Manufacture of glass including glass fibre with a melting capacity exceeding 20 tonnes per day; Techniques (i)-(ii) (see table); Reducing metals emissions to air. The BAT-AEL emission level is < 1 mg/Nm3.
valid
2019-04-23
2019-04-23
GLS-Metals-BAT54-III
Manufacture of Glass - Metals - BAT54-III
3, Mineral industry: 3,3 Manufacture of glass including glass fibre with a melting capacity exceeding 20 tonnes per day; Techniques (i)-(ii) (see table); Reducing metals emissions to air. The BAT-AEL emission level is < 1 - 5 mg/Nm3.
valid
2019-04-23
2019-04-23
GLS-Metals-BAT62-I
Manufacture of Glass - Metals - BAT62-I
3, Mineral industry: 3,4 Melting mineral substances including the production of mineral fibres with a melting capacity exceeding 20 tonnes per day; Techniques (i)-(ii) (see table); Reducing metals emissions to air. The BAT-AEL emission level is < 0,2 - 1 mg/Nm3.
valid
2019-04-23
2019-04-23
GLS-Metals-BAT62-II
Manufacture of Glass - Metals - BAT62-II
3, Mineral industry: 3,4 Melting mineral substances including the production of mineral fibres with a melting capacity exceeding 20 tonnes per day; Techniques (i)-(ii) (see table); Reducing metals emissions to air. The BAT-AEL emission level is < 1 - 2 mg/Nm3.
valid
2019-04-23
2019-04-23
GLS-Metals-BAT62-III
Manufacture of Glass - Metals - BAT62-III
3, Mineral industry: 3,4 Melting mineral substances including the production of mineral fibres with a melting capacity exceeding 20 tonnes per day; Techniques (i)-(ii) (see table); Reducing metals emissions to air. The BAT-AEL emission level is < 0,0004 - 0,0025 kg/t.
valid
2019-04-23
2019-04-23
GLS-Metals-BAT62-IV
Manufacture of Glass - Metals - BAT62-IV
3, Mineral industry: 3,4 Melting mineral substances including the production of mineral fibres with a melting capacity exceeding 20 tonnes per day; Techniques (i)-(ii) (see table); Reducing metals emissions to air. The BAT-AEL emission level is < 0,002 - 0,005 kg/t.
valid
2019-04-23
2019-04-23
GLS-Metals-BAT69-I
Manufacture of Glass - Metals - BAT69-I
3, Mineral industry: 3,4 Melting mineral substances including the production of mineral fibres with a melting capacity exceeding 20 tonnes per day; Techniques (i)-(ii) (see table); Reducing metals emissions to air. The BAT-AEL emission level is < 1 mg/Nm3.
valid
2019-04-23
2019-04-23
GLS-Metals-BAT69-II
Manufacture of Glass - Metals - BAT69-II
3, Mineral industry: 3,4 Melting mineral substances including the production of mineral fibres with a melting capacity exceeding 20 tonnes per day; Techniques (i)-(ii) (see table); Reducing metals emissions to air. The BAT-AEL emission level is < 5 mg/Nm3.
valid
2019-04-23
2019-04-23
GLS-Metals-BAT75-I
Manufacture of Glass - Metals - BAT75-I
3, Mineral industry: 3,4 Melting mineral substances including the production of mineral fibres with a melting capacity exceeding 20 tonnes per day; Techniques (i)-(iii) (see table); Reducing metals emissions to air. The BAT-AEL emission level is < 1 mg/Nm3.
valid
2019-04-23
2019-04-23
GLS-Metals-BAT75-II
Manufacture of Glass - Metals - BAT75-II
3, Mineral industry: 3,4 Melting mineral substances including the production of mineral fibres with a melting capacity exceeding 20 tonnes per day; Techniques (i)-(iii) (see table); Reducing metals emissions to air. The BAT-AEL emission level is < 5 mg/Nm3.
valid
2019-04-23
2019-04-23
GLS-Metals-BAT75-III
Manufacture of Glass - Metals - BAT75-III
3, Mineral industry: 3,4 Melting mineral substances including the production of mineral fibres with a melting capacity exceeding 20 tonnes per day; Techniques (i)-(iii) (see table); Reducing metals emissions to air. The BAT-AEL emission level is < 0,0075 kg/t.
valid
2019-04-23
2019-04-23
GLS-Metals-BAT75-IV
Manufacture of Glass - Metals - BAT75-IV
3, Mineral industry: 3,4 Melting mineral substances including the production of mineral fibres with a melting capacity exceeding 20 tonnes per day; Techniques (i)-(iii) (see table); Reducing metals emissions to air. The BAT-AEL emission level is < 0,037 kg/t.
valid
2019-04-23
2019-04-23
GLS-Metals-BAT76-II
Manufacture of Glass - Metals - BAT76-II
3, Mineral industry: 3,4 Melting mineral substances including the production of mineral fibres with a melting capacity exceeding 20 tonnes per day; Techniques (i)-(iii) (see table); Reducing metals emissions to air. The BAT-AEL emission level is < 1 mg/Nm3.
valid
2019-04-23
2019-04-23
GLS-Metals-BAT76-III
Manufacture of Glass - Metals - BAT76-III
3, Mineral industry: 3,4 Melting mineral substances including the production of mineral fibres with a melting capacity exceeding 20 tonnes per day; Techniques (i)-(iii) (see table); Reducing metals emissions to air. The BAT-AEL emission level is < 5 mg/Nm3.
valid
2019-04-23
2019-04-23
GLS-NH3-BAT10
Manufacture of Glass - NH3 - BAT10
3, Mineral industry: 3,3 Manufacture of glass including glass fibre with a melting capacity exceeding 20 tonnes per day; SCR or SNCR; Reducing ammonia (NH3) emissions to air. The BAT-AEL emission level is < 5 - 30 mg/Nm3.
valid
2019-04-23
2019-04-23
GLS-NH3-BAT37-III
Manufacture of Glass - NH3 - BAT37-III
3, Mineral industry: 3,3 Manufacture of glass including glass fibre with a melting capacity exceeding 20 tonnes per day; Techniques (i)-(iii) (see table); Reducing ammonia emissions to air. The BAT-AEL emission level is < 30 mg/Nm3.
valid
2019-04-23
2019-04-23
GLS-NH3-BAT63-IV
Manufacture of Glass - NH3 - BAT63-IV
3, Mineral industry: 3,4 Melting mineral substances including the production of mineral fibres with a melting capacity exceeding 20 tonnes per day; Techniques (i)-(v) (see table); Reducing ammonia emissions to air. The BAT-AEL emission level is 30 - 60 mg/Nm3.
valid
2019-04-23
2019-04-23
GLS-NH3-BAT63-X
Manufacture of Glass - NH3 - BAT63-X
3, Mineral industry: 3,4 Melting mineral substances including the production of mineral fibres with a melting capacity exceeding 20 tonnes per day; Techniques (i)-(v) (see table); Reducing ammonia emissions to air. The BAT-AEL emission level is < 20 - 60 mg/Nm3.
valid
2019-04-23
2019-04-23
GLS-NH3-BAT63-XVII
Manufacture of Glass - NH3 - BAT63-XVII
3, Mineral industry: 3,4 Melting mineral substances including the production of mineral fibres with a melting capacity exceeding 20 tonnes per day; Techniques (i)-(v) (see table); Reducing ammonia emissions to air. The BAT-AEL emission level is < 0,4 kg/t.
valid
2019-04-23
2019-04-23
GLS-NH4-BAT13-XVII
Manufacture of Glass - NH4 - BAT13-XVII
3, Mineral industry: 3,3 Manufacture of glass including glass fibre with a melting capacity exceeding 20 tonnes per day Reducing ammonia to water. The BAT-AEL emission level is < 10 mg/l.
valid
2019-04-23
2019-04-23
GLS-NO2-BAT17-I
Manufacture of Glass - NO2 - BAT17-I
3, Mineral industry: 3,3 Manufacture of glass including glass fibre with a melting capacity exceeding 20 tonnes per day; I. Primary techniques: Combustion modifications (i), special furnace design (ii); Reducing nitrogen oxides (NOx) emissions to air. The BAT-AEL emission level is 500 - 800 mg/Nm3.
valid
2019-04-23
2019-04-23
GLS-NO2-BAT17-II
Manufacture of Glass - NO2 - BAT17-II
3, Mineral industry: 3,3 Manufacture of glass including glass fibre with a melting capacity exceeding 20 tonnes per day; I. Primary techniques: Electric melting (iii); Reducing nitrogen oxides (NOx) emissions to air. The BAT-AEL emission level is < 100 mg/Nm3.
valid
2019-04-23
2019-04-23
GLS-NO2-BAT17-III
Manufacture of Glass - NO2 - BAT17-III
3, Mineral industry: 3,3 Manufacture of glass including glass fibre with a melting capacity exceeding 20 tonnes per day; II. Secondary techniques; Reducing nitrogen oxides (NOx) emissions to air. The BAT-AEL emission level is < 500 mg/Nm3.
valid
2019-04-23
2019-04-23
GLS-NO2-BAT17-IV
Manufacture of Glass - NO2 - BAT17-IV
3, Mineral industry: 3,3 Manufacture of glass including glass fibre with a melting capacity exceeding 20 tonnes per day; I. Primary techniques: Combustion modifications (i), special furnace design (ii); Reducing nitrogen oxides (NOx) emissions to air. The BAT-AEL emission level is 0,75 - 1,2 kg/t.
valid
2019-04-23
2019-04-23
GLS-NO2-BAT17-V
Manufacture of Glass - NO2 - BAT17-V
3, Mineral industry: 3,3 Manufacture of glass including glass fibre with a melting capacity exceeding 20 tonnes per day; I. Primary techniques: Electric melting (iii); Reducing nitrogen oxides (NOx) emissions to air. The BAT-AEL emission level is < 0,3 kg/t.
valid
2019-04-23
2019-04-23
GLS-NO2-BAT17-VI
Manufacture of Glass - NO2 - BAT17-VI
3, Mineral industry: 3,3 Manufacture of glass including glass fibre with a melting capacity exceeding 20 tonnes per day; I. Primary techniques: Oxy-fuel melting (iv); Reducing nitrogen oxides (NOx) emissions to air. The BAT-AEL emission level is < 0,5 - 0,8 kg/t.
valid
2019-04-23
2019-04-23
GLS-NO2-BAT17-VII
Manufacture of Glass - NO2 - BAT17-VII
3, Mineral industry: 3,3 Manufacture of glass including glass fibre with a melting capacity exceeding 20 tonnes per day; II. Secondary techniques; Reducing nitrogen oxides (NOx) emissions to air. The BAT-AEL emission level is < 0,75 kg/t.
valid
2019-04-23
2019-04-23
GLS-NO2-BAT18-I
Manufacture of Glass - NO2 - BAT18-I
3, Mineral industry: 3,3 Manufacture of glass including glass fibre with a melting capacity exceeding 20 tonnes per day; I. Primary techniques (see table BAT 17): Combustion modifications (i), special furnace designs (ii) combined with minimisation of these (nitrates) raw materials; Reducing nitrogen oxides (NOx) emissions to air. The BAT-AEL emission level is 500 - 800 mg/Nm3.
valid
2019-04-23
2019-04-23
GLS-NO2-BAT18-II
Manufacture of Glass - NO2 - BAT18-II
3, Mineral industry: 3,3 Manufacture of glass including glass fibre with a melting capacity exceeding 20 tonnes per day; I. Primary techniques (see table BAT 17): Electric melting (iii) combined with minimisation of these (nitrates) raw materials; Reducing nitrogen oxides (NOx) emissions to air. The BAT-AEL emission level is < 100 mg/Nm3.
valid
2019-04-23
2019-04-23
GLS-NO2-BAT18-III
Manufacture of Glass - NO2 - BAT18-III
3, Mineral industry: 3,3 Manufacture of glass including glass fibre with a melting capacity exceeding 20 tonnes per day; II. Secondary techniques (see table BAT 17) combined with minimisation of these (nitrates) raw materials; Reducing nitrogen oxides (NOx) emissions to air. The BAT-AEL emission level is < 500 mg/Nm3.
valid
2019-04-23
2019-04-23
GLS-NO2-BAT18-IV
Manufacture of Glass - NO2 - BAT18-IV
3, Mineral industry: 3,3 Manufacture of glass including glass fibre with a melting capacity exceeding 20 tonnes per day; I. Primary techniques (see table BAT 17): Combustion modifications (i), special furnace designs (ii) combined with minimisation of these (nitrates) raw materials; Reducing nitrogen oxides (NOx) emissions to air. The BAT-AEL emission level is 0,75 - 1,2 kg/t.
valid
2019-04-23
2019-04-23
GLS-NO2-BAT18-IX
Manufacture of Glass - NO2 - BAT18-IX
3, Mineral industry: 3,3 Manufacture of glass including glass fibre with a melting capacity exceeding 20 tonnes per day; Primary techniques (see table) in cases of short campaigns or melting furnaces with a capacity < 100 t/d; Reducing nitrogen oxides (NOx) emissions to air. The BAT-AEL emission level is < 3 kg/t.
valid
2019-04-23
2019-04-23
GLS-NO2-BAT18-V
Manufacture of Glass - NO2 - BAT18-V
3, Mineral industry: 3,3 Manufacture of glass including glass fibre with a melting capacity exceeding 20 tonnes per day; I. Primary techniques (see table BAT 17): Electric melting (iii) combined with minimisation of these (nitrates) raw materials; Reducing nitrogen oxides (NOx) emissions to air. The BAT-AEL emission level is < 0,3 kg/t.
valid
2019-04-23
2019-04-23
GLS-NO2-BAT18-VI
Manufacture of Glass - NO2 - BAT18-VI
3, Mineral industry: 3,3 Manufacture of glass including glass fibre with a melting capacity exceeding 20 tonnes per day; I. Primary techniques (see table BAT 17): Oxy-fuel melting (iv) combined with minimisation of these (nitrates) raw materials; Reducing nitrogen oxides (NOx) emissions to air. The BAT-AEL emission level is < 0,5 - 0,8 kg/t.
valid
2019-04-23
2019-04-23
GLS-NO2-BAT18-VII
Manufacture of Glass - NO2 - BAT18-VII
3, Mineral industry: 3,3 Manufacture of glass including glass fibre with a melting capacity exceeding 20 tonnes per day; II. Secondary techniques (see table BAT 17) combined with minimisation of these (nitrates) raw materials; Reducing nitrogen oxides (NOx) emissions to air. The BAT-AEL emission level is < 0,75 kg/t.
valid
2019-04-23
2019-04-23
GLS-NO2-BAT18-VIII
Manufacture of Glass - NO2 - BAT18-VIII
3, Mineral industry: 3,3 Manufacture of glass including glass fibre with a melting capacity exceeding 20 tonnes per day; Primary techniques (see table) in cases of short campaigns or melting furnaces with a capacity < 100 t/d; Reducing nitrogen oxides (NOx) emissions to air. The BAT-AEL emission level is < 1000 mg/Nm3.
valid
2019-04-23
2019-04-23
GLS-NO2-BAT25-I
Manufacture of Glass - NO2 - BAT25-I
3, Mineral industry: 3,3 Manufacture of glass including glass fibre with a melting capacity exceeding 20 tonnes per day; I. Primary techniques: Combustion modifications (i), Fenix process (ii); Reducing nitrogen oxides (NOx) emissions to air. The BAT-AEL emission level is 700 - 800 mg/Nm3.
valid
2019-04-23
2019-04-23
GLS-NO2-BAT25-II
Manufacture of Glass - NO2 - BAT25-II
3, Mineral industry: 3,3 Manufacture of glass including glass fibre with a melting capacity exceeding 20 tonnes per day; II. Secondary techniques; Reducing nitrogen oxides (NOx) emissions to air. The BAT-AEL emission level is 400 - 700 mg/Nm3.
valid
2019-04-23
2019-04-23
GLS-NO2-BAT25-III
Manufacture of Glass - NO2 - BAT25-III
3, Mineral industry: 3,3 Manufacture of glass including glass fibre with a melting capacity exceeding 20 tonnes per day; I. Primary techniques: Combustion modifications (i), Fenix process (ii); Reducing nitrogen oxides (NOx) emissions to air. The BAT-AEL emission level is 1,75 - 2 kg/t.
valid
2019-04-23
2019-04-23
GLS-NO2-BAT25-IV
Manufacture of Glass - NO2 - BAT25-IV
3, Mineral industry: 3,3 Manufacture of glass including glass fibre with a melting capacity exceeding 20 tonnes per day; I. Primary techniques: Oxy-fuel melting (iii); Reducing nitrogen oxides (NOx) emissions to air. The BAT-AEL emission level is < 1,25 - 2 kg/t.
valid
2019-04-23
2019-04-23
GLS-NO2-BAT25-V
Manufacture of Glass - NO2 - BAT25-V
3, Mineral industry: 3,3 Manufacture of glass including glass fibre with a melting capacity exceeding 20 tonnes per day; II. Secondary techniques; Reducing nitrogen oxides (NOx) emissions to air. The BAT-AEL emission level is 1 - 1,75 kg/t.
valid
2019-04-23
2019-04-23
GLS-NO2-BAT26-I
Manufacture of Glass - NO2 - BAT26-I
3, Mineral industry: 3,3 Manufacture of glass including glass fibre with a melting capacity exceeding 20 tonnes per day; II. Secondary techniques (see table BAT 25) and minimisation of these (nitrates) raw materials; Reducing nitrogen oxides (NOx) emissions to air. The BAT-AEL emission level is 400 - 700 mg/Nm3.
valid
2019-04-23
2019-04-23
GLS-NO2-BAT26-II
Manufacture of Glass - NO2 - BAT26-II
3, Mineral industry: 3,3 Manufacture of glass including glass fibre with a melting capacity exceeding 20 tonnes per day; II. Secondary techniques (see table BAT 25) and minimisation of these (nitrates) raw materials; Reducing nitrogen oxides (NOx) emissions to air. The BAT-AEL emission level is 1 - 1,75 kg/t.
valid
2019-04-23
2019-04-23
GLS-NO2-BAT26-III
Manufacture of Glass - NO2 - BAT26-III
3, Mineral industry: 3,3 Manufacture of glass including glass fibre with a melting capacity exceeding 20 tonnes per day; Primary techniques (see table) and production of special glasses in a limited number of short campaigns; Reducing nitrogen oxides (NOx) emissions to air. The BAT-AEL emission level is < 1200 mg/Nm3.
valid
2019-04-23
2019-04-23
GLS-NO2-BAT26-IV
Manufacture of Glass - NO2 - BAT26-IV
3, Mineral industry: 3,3 Manufacture of glass including glass fibre with a melting capacity exceeding 20 tonnes per day; Primary techniques (see table) and production of special glasses in a limited number of short campaigns; Reducing nitrogen oxides (NOx) emissions to air. The BAT-AEL emission level is < 3 kg/t.
valid
2019-04-23
2019-04-23
GLS-NO2-BAT33-I
Manufacture of Glass - NO2 - BAT33-I
3, Mineral industry: 3,3 Manufacture of glass including glass fibre with a melting capacity exceeding 20 tonnes per day; Combustion modifications (i); Reducing nitrogen oxides (NOx) emissions to air. The BAT-AEL emission level is < 600 - 1000 mg/Nm3.
valid
2019-04-23
2019-04-23
GLS-NO2-BAT33-II
Manufacture of Glass - NO2 - BAT33-II
3, Mineral industry: 3,3 Manufacture of glass including glass fibre with a melting capacity exceeding 20 tonnes per day; Combustion modifications (i); Reducing nitrogen oxides (NOx) emissions to air. The BAT-AEL emission level is < 2,7 - 4,5 kg/t.
valid
2019-04-23
2019-04-23
GLS-NO2-BAT33-III
Manufacture of Glass - NO2 - BAT33-III
3, Mineral industry: 3,3 Manufacture of glass including glass fibre with a melting capacity exceeding 20 tonnes per day; Oxy-fuel melting (ii); Reducing nitrogen oxides (NOx) emissions to air. The BAT-AEL emission level is < 0,5 - 1,5 kg/t.
valid
2019-04-23
2019-04-23
GLS-NO2-BAT39-I
Manufacture of Glass - NO2 - BAT39-I
3, Mineral industry: 3,3 Manufacture of glass including glass fibre with a melting capacity exceeding 20 tonnes per day; Combustion modifications (i), special furnace design (ii); Reducing nitrogen oxides (NOx) emissions to air. The BAT-AEL emission level is < 500 - 1000 mg/Nm3.
valid
2019-04-23
2019-04-23
GLS-NO2-BAT39-II
Manufacture of Glass - NO2 - BAT39-II
3, Mineral industry: 3,3 Manufacture of glass including glass fibre with a melting capacity exceeding 20 tonnes per day; Electric melting (iii); Reducing nitrogen oxides (NOx) emissions to air. The BAT-AEL emission level is < 100 mg/Nm3.
valid
2019-04-23
2019-04-23
GLS-NO2-BAT39-III
Manufacture of Glass - NO2 - BAT39-III
3, Mineral industry: 3,3 Manufacture of glass including glass fibre with a melting capacity exceeding 20 tonnes per day; Combustion modifications (i), special furnace design (ii); Reducing nitrogen oxides (NOx) emissions to air. The BAT-AEL emission level is < 1,25 - 2,5 kg/t.
valid
2019-04-23
2019-04-23
GLS-NO2-BAT39-IV
Manufacture of Glass - NO2 - BAT39-IV
3, Mineral industry: 3,3 Manufacture of glass including glass fibre with a melting capacity exceeding 20 tonnes per day; Electric melting (iii); Reducing nitrogen oxides (NOx) emissions to air. The BAT-AEL emission level is < 0,3 kg/t.
valid
2019-04-23
2019-04-23
GLS-NO2-BAT39-V
Manufacture of Glass - NO2 - BAT39-V
3, Mineral industry: 3,3 Manufacture of glass including glass fibre with a melting capacity exceeding 20 tonnes per day; Oxy-fuel melting (iv); Reducing nitrogen oxides (NOx) emissions to air. The BAT-AEL emission level is < 0,5 - 1,5 kg/t.
valid
2019-04-23
2019-04-23
GLS-NO2-BAT40-I
Manufacture of Glass - NO2 - BAT40-I
3, Mineral industry: 3,3 Manufacture of glass including glass fibre with a melting capacity exceeding 20 tonnes per day; Combustion modifications (i), special furnace designs (ii) (see table BAT 39) combined with minimisation of these (nitrates) raw materials; Reducing nitrogen oxides (NOx) emissions to air. The BAT-AEL emission level is < 500 - 1500 mg/Nm3.
valid
2019-04-23
2019-04-23
GLS-NO2-BAT40-II
Manufacture of Glass - NO2 - BAT40-II
3, Mineral industry: 3,3 Manufacture of glass including glass fibre with a melting capacity exceeding 20 tonnes per day; Electric melting (iii) (see table BAT 39) combined with minimisation of these (nitrates) raw materials; Reducing nitrogen oxides (NOx) emissions to air. The BAT-AEL emission level is < 100 mg/Nm3.
valid
2019-04-23
2019-04-23
GLS-NO2-BAT40-III
Manufacture of Glass - NO2 - BAT40-III
3, Mineral industry: 3,3 Manufacture of glass including glass fibre with a melting capacity exceeding 20 tonnes per day; Combustion modifications (i), special furnace designs (ii) (see table BAT 39) combined with minimisation of these (nitrates) raw materials; Reducing nitrogen oxides (NOx) emissions to air. The BAT-AEL emission level is < 1,25 - 2,5 kg/t.
valid
2019-04-23
2019-04-23
GLS-NO2-BAT40-IV
Manufacture of Glass - NO2 - BAT40-IV
3, Mineral industry: 3,3 Manufacture of glass including glass fibre with a melting capacity exceeding 20 tonnes per day; Electric melting (iii) (see table BAT 39) combined with minimisation of these (nitrates) raw materials; Reducing nitrogen oxides (NOx) emissions to air. The BAT-AEL emission level is < 0,3 kg/t.
valid
2019-04-23
2019-04-23
GLS-NO2-BAT40-IX
Manufacture of Glass - NO2 - BAT40-IX
3, Mineral industry: 3,3 Manufacture of glass including glass fibre with a melting capacity exceeding 20 tonnes per day; Electric melting in production of special types of soda-lime glasses and other special glasses and for a limited number of short campaigns or for melting furnaces with a capacity < 100 t/d; Reducing nitrogen oxides (NOx) emissions to air. The BAT-AEL emission level is < 8 - 10 kg/t.
valid
2019-04-23
2019-04-23
GLS-NO2-BAT40-V
Manufacture of Glass - NO2 - BAT40-V
3, Mineral industry: 3,3 Manufacture of glass including glass fibre with a melting capacity exceeding 20 tonnes per day; Oxy-fuel melting (iv) (see table BAT 39) combined with minimisation of these (nitrates) raw materials; Reducing nitrogen oxides (NOx) emissions to air. The BAT-AEL emission level is < 0,5 - 1,5 kg/t.
valid
2019-04-23
2019-04-23
GLS-NO2-BAT40-VI
Manufacture of Glass - NO2 - BAT40-VI
3, Mineral industry: 3,3 Manufacture of glass including glass fibre with a melting capacity exceeding 20 tonnes per day; Fuel/air conventional furnaces in production of special types of soda-lime glasses and other special glasses and for a limited number of short campaigns or for melting furnaces with a capacity < 100 t/d; Reducing nitrogen oxides (NOx) emissions to air. The BAT-AEL emission level is < 500 - 1500 mg/Nm3.
valid
2019-04-23
2019-04-23
GLS-NO2-BAT40-VII
Manufacture of Glass - NO2 - BAT40-VII
3, Mineral industry: 3,3 Manufacture of glass including glass fibre with a melting capacity exceeding 20 tonnes per day; Electric melting in production of special types of soda-lime glasses and other special glasses and for a limited number of short campaigns or for melting furnaces with a capacity < 100 t/d; Reducing nitrogen oxides (NOx) emissions to air. The BAT-AEL emission level is < 300 - 500 mg/Nm3.
valid
2019-04-23
2019-04-23
GLS-NO2-BAT40-VIII
Manufacture of Glass - NO2 - BAT40-VIII
3, Mineral industry: 3,3 Manufacture of glass including glass fibre with a melting capacity exceeding 20 tonnes per day; Fuel/air conventional furnaces in production of special types of soda-lime glasses and other special glasses and for a limited number of short campaigns or for melting furnaces with a capacity < 100 t/d; Reducing nitrogen oxides (NOx) emissions to air. The BAT-AEL emission level is < 1,25 - 3,75 kg/t.
valid
2019-04-23
2019-04-23
GLS-NO2-BAT49-I
Manufacture of Glass - NO2 - BAT49-I
3, Mineral industry: 3,3 Manufacture of glass including glass fibre with a melting capacity exceeding 20 tonnes per day; I. Primary techniques: Combustion modifications (i); Reducing nitrogen oxides (NOx) emissions to air. The BAT-AEL emission level is 600 - 800 mg/Nm3.
valid
2019-04-23
2019-04-23
GLS-NO2-BAT49-II
Manufacture of Glass - NO2 - BAT49-II
3, Mineral industry: 3,3 Manufacture of glass including glass fibre with a melting capacity exceeding 20 tonnes per day; I. Primary techniques: Electric melting (ii); Reducing nitrogen oxides (NOx) emissions to air. The BAT-AEL emission level is < 100 mg/Nm3.
valid
2019-04-23
2019-04-23
GLS-NO2-BAT49-III
Manufacture of Glass - NO2 - BAT49-III
3, Mineral industry: 3,3 Manufacture of glass including glass fibre with a melting capacity exceeding 20 tonnes per day; II. Secondary techniques; Reducing nitrogen oxides (NOx) emissions to air. The BAT-AEL emission level is < 500 mg/Nm3.
valid
2019-04-23
2019-04-23
GLS-NO2-BAT49-IV
Manufacture of Glass - NO2 - BAT49-IV
3, Mineral industry: 3,3 Manufacture of glass including glass fibre with a melting capacity exceeding 20 tonnes per day; I. Primary techniques: Combustion modifications (i); Reducing nitrogen oxides (NOx) emissions to air. The BAT-AEL emission level is 1,5 - 3,2 kg/t.
valid
2019-04-23
2019-04-23
GLS-NO2-BAT49-V
Manufacture of Glass - NO2 - BAT49-V
3, Mineral industry: 3,3 Manufacture of glass including glass fibre with a melting capacity exceeding 20 tonnes per day; I. Primary techniques: Electric melting (ii); Reducing nitrogen oxides (NOx) emissions to air. The BAT-AEL emission level is < 0,25 - 0,4 kg/t.
valid
2019-04-23
2019-04-23
GLS-NO2-BAT49-VI
Manufacture of Glass - NO2 - BAT49-VI
3, Mineral industry: 3,3 Manufacture of glass including glass fibre with a melting capacity exceeding 20 tonnes per day; I. Primary techniques: Oxy-fuel melting (iii); Reducing nitrogen oxides (NOx) emissions to air. The BAT-AEL emission level is < 1 - 3 kg/t.
valid
2019-04-23
2019-04-23
GLS-NO2-BAT49-VII
Manufacture of Glass - NO2 - BAT49-VII
3, Mineral industry: 3,3 Manufacture of glass including glass fibre with a melting capacity exceeding 20 tonnes per day; II. Secondary techniques; Reducing nitrogen oxides (NOx) emissions to air. The BAT-AEL emission level is < 1 - 3 kg/t.
valid
2019-04-23
2019-04-23
GLS-NO2-BAT50-I
Manufacture of Glass - NO2 - BAT50-I
3, Mineral industry: 3,3 Manufacture of glass including glass fibre with a melting capacity exceeding 20 tonnes per day; Primary or secondary techniques (see table) combined with minimisation of nitrate input; Reducing nitrogen oxides (NOx) emissions to air. The BAT-AEL emission level is < 500 - 1000 mg/Nm3.
valid
2019-04-23
2019-04-23
GLS-NO2-BAT50-II
Manufacture of Glass - NO2 - BAT50-II
3, Mineral industry: 3,3 Manufacture of glass including glass fibre with a melting capacity exceeding 20 tonnes per day; Primary or secondary techniques (see table) combined with minimisation of nitrate input; Reducing nitrogen oxides (NOx) emissions to air. The BAT-AEL emission level is < 1 - 6 kg/t.
valid
2019-04-23
2019-04-23
GLS-NO2-BAT57-I
Manufacture of Glass - NO2 - BAT57-I
3, Mineral industry: 3,4 Melting mineral substances including the production of mineral fibres with a melting capacity exceeding 20 tonnes per day; For glass wool: Fuel/air (i) and electric furnaces (ii); Reducing nitrogen oxides (NOx) emissions to air. The BAT-AEL emission level is < 200 - 500 mg/Nm3.
valid
2019-04-23
2019-04-23
GLS-NO2-BAT57-II
Manufacture of Glass - NO2 - BAT57-II
3, Mineral industry: 3,4 Melting mineral substances including the production of mineral fibres with a melting capacity exceeding 20 tonnes per day; For stone wool: All types of furnaces; Reducing nitrogen oxides (NOx) emissions to air. The BAT-AEL emission level is < 400 - 500 mg/Nm3.
valid
2019-04-23
2019-04-23
GLS-NO2-BAT57-III
Manufacture of Glass - NO2 - BAT57-III
3, Mineral industry: 3,4 Melting mineral substances including the production of mineral fibres with a melting capacity exceeding 20 tonnes per day; For glass wool: Fuel/air (i) and electric furnaces (ii); Reducing nitrogen oxides (NOx) emissions to air. The BAT-AEL emission level is < 0,4 - 1 kg/t.
valid
2019-04-23
2019-04-23
GLS-NO2-BAT57-IV
Manufacture of Glass - NO2 - BAT57-IV
3, Mineral industry: 3,4 Melting mineral substances including the production of mineral fibres with a melting capacity exceeding 20 tonnes per day; For glass wool: Oxy-fuel melting (iii); Reducing nitrogen oxides (NOx) emissions to air. The BAT-AEL emission level is < 0,5 kg/t.
valid
2019-04-23
2019-04-23
GLS-NO2-BAT57-V
Manufacture of Glass - NO2 - BAT57-V
3, Mineral industry: 3,4 Melting mineral substances including the production of mineral fibres with a melting capacity exceeding 20 tonnes per day; For stone wool: All types of furnaces; Reducing nitrogen oxides (NOx) emissions to air. The BAT-AEL emission level is < 1 - 1,25 kg/t.
valid
2019-04-23
2019-04-23
GLS-NO2-BAT58-I
Manufacture of Glass - NO2 - BAT58-I
3, Mineral industry: 3,4 Melting mineral substances including the production of mineral fibres with a melting capacity exceeding 20 tonnes per day; Primary techniques (i)-(iii) combined with minimisation of nitrate input; Reducing nitrogen oxides (NOx) emissions to air. The BAT-AEL emission level is < 500 - 700 mg/Nm3.
valid
2019-04-23
2019-04-23
GLS-NO2-BAT58-II
Manufacture of Glass - NO2 - BAT58-II
3, Mineral industry: 3,4 Melting mineral substances including the production of mineral fibres with a melting capacity exceeding 20 tonnes per day; Primary techniques (i)-(iii) combined with minimisation of nitrate input; Reducing nitrogen oxides (NOx) emissions to air. The BAT-AEL emission level is < 1 - 1,4 kg/t.
valid
2019-04-23
2019-04-23
GLS-NO2-BAT63-XIII
Manufacture of Glass - NO2 - BAT63-XIII
3, Mineral industry: 3,4 Melting mineral substances including the production of mineral fibres with a melting capacity exceeding 20 tonnes per day; Techniques (i)-(v) (see table); Reducing nitrogen oxides (NOx) emissions to air. The BAT-AEL emission level is < 100 - 200 mg/Nm3.
valid
2019-04-23
2019-04-23
GLS-NO2-BAT63-XX
Manufacture of Glass - NO2 - BAT63-XX
3, Mineral industry: 3,4 Melting mineral substances including the production of mineral fibres with a melting capacity exceeding 20 tonnes per day; Techniques (i)-(v) (see table); Reducing nitrogen oxides (NOx) emissions to air. The BAT-AEL emission level is < 1 kg/t.
valid
2019-04-23
2019-04-23
GLS-NO2-BAT66
Manufacture of Glass - NO2 - BAT66
3, Mineral industry: 3,4 Melting mineral substances including the production of mineral fibres with a melting capacity exceeding 20 tonnes per day; Lubricant burn-off oven with combustion control and/or modifications (see table); Reducing nitrogen oxides (NOx) emissions to air. The BAT-AEL emission level is 100 - 200 mg/Nm3.
valid
2019-04-23
2019-04-23
GLS-NO2-BAT72-I
Manufacture of Glass - NO2 - BAT72-I
3, Mineral industry: 3,4 Melting mineral substances including the production of mineral fibres with a melting capacity exceeding 20 tonnes per day; Primary techniques: Fuel/air, fuel/oxygen- enriched air combustion, without nitrates; Reducing nitrogen oxides (NOx) emissions to air. The BAT-AEL emission level is 500 - 1000 mg/Nm3.
valid
2019-04-23
2019-04-23
GLS-NO2-BAT72-II
Manufacture of Glass - NO2 - BAT72-II
3, Mineral industry: 3,4 Melting mineral substances including the production of mineral fibres with a melting capacity exceeding 20 tonnes per day; Primary techniques: Fuel/air, fuel/oxygen- enriched air combustion, with use of nitrates; Reducing nitrogen oxides (NOx) emissions to air. The BAT-AEL emission level is < 1600 mg/Nm3.
valid
2019-04-23
2019-04-23
GLS-NO2-BAT72-III
Manufacture of Glass - NO2 - BAT72-III
3, Mineral industry: 3,4 Melting mineral substances including the production of mineral fibres with a melting capacity exceeding 20 tonnes per day; Primary techniques: Oxy-fuel firing, without nitrates; Reducing nitrogen oxides (NOx) emissions to air. The BAT-AEL emission level is < 2,5 - 5 kg/t.
valid
2019-04-23
2019-04-23
GLS-NO2-BAT72-IV
Manufacture of Glass - NO2 - BAT72-IV
3, Mineral industry: 3,4 Melting mineral substances including the production of mineral fibres with a melting capacity exceeding 20 tonnes per day; Primary techniques: Oxy-fuel firing, with use of nitrates; Reducing nitrogen oxides (NOx) emissions to air. The BAT-AEL emission level is 5 - 10 kg/t.
valid
2019-04-23
2019-04-23
GLS-NO2-BAT72-V
Manufacture of Glass - NO2 - BAT72-V
3, Mineral industry: 3,4 Melting mineral substances including the production of mineral fibres with a melting capacity exceeding 20 tonnes per day; Primary techniques: Fuel/air, fuel/oxygen- enriched air combustion, without nitrates; Reducing nitrogen oxides (NOx) emissions to air. The BAT-AEL emission level is 2,5 - 7,5 kg/t.
valid
2019-04-23
2019-04-23
GLS-NO2-BAT72-VI
Manufacture of Glass - NO2 - BAT72-VI
3, Mineral industry: 3,4 Melting mineral substances including the production of mineral fibres with a melting capacity exceeding 20 tonnes per day; Primary techniques: Fuel/air, fuel/oxygen- enriched air combustion, with use of nitrates; Reducing nitrogen oxides (NOx) emissions to air. The BAT-AEL emission level is < 12 kg/t.
valid
2019-04-23
2019-04-23
GLS-Ni-BAT13-XVI
Manufacture of Glass - Ni - BAT13-XVI
3, Mineral industry: 3,3 Manufacture of glass including glass fibre with a melting capacity exceeding 20 tonnes per day Reducing nickel to water. The BAT-AEL emission level is < 0,5 mg/l.
valid
2019-04-23
2019-04-23
GLS-Pb-BAT13-VII
Manufacture of Glass - Pb - BAT13-VII
3, Mineral industry: 3,3 Manufacture of glass including glass fibre with a melting capacity exceeding 20 tonnes per day Reducing lead to water. The BAT-AEL emission level is < 0,05 - 0,3 mg/l.
valid
2019-04-23
2019-04-23
GLS-Pb-BAT45-I
Manufacture of Glass - Pb - BAT45-I
3, Mineral industry: 3,3 Manufacture of glass including glass fibre with a melting capacity exceeding 20 tonnes per day; Techniques (i)-(iv) (see table); Reducing lead compounds emissions to air. The BAT-AEL emission level is < 0,5 - 1 mg/Nm3.
valid
2019-04-23
2019-04-23
GLS-Pb-BAT45-II
Manufacture of Glass - Pb - BAT45-II
3, Mineral industry: 3,3 Manufacture of glass including glass fibre with a melting capacity exceeding 20 tonnes per day; Techniques (i)-(iv) (see table); Reducing lead compounds emissions to air. The BAT-AEL emission level is < 0,001 - 0,003 kg/t.
valid
2019-04-23
2019-04-23
GLS-Pb-BAT46-IV
Manufacture of Glass - Pb - BAT46-IV
3, Mineral industry: 3,3 Manufacture of glass including glass fibre with a melting capacity exceeding 20 tonnes per day; Techniques (i)-(ii) (see table); Reducing lead emissions to air. The BAT-AEL emission level is < 1 - 1,5 mg/Nm3.
valid
2019-04-23
2019-04-23
GLS-SO2-BAT19-I
Manufacture of Glass - SO2 - BAT19-I
3, Mineral industry: 3,3 Manufacture of glass including glass fibre with a melting capacity exceeding 20 tonnes per day; Techniques (i)-(iii) (see table), and natural gas; Reducing sulphur oxides (SOx) emissions to air. The BAT-AEL emission level is < 200 - 500 mg/Nm3.
valid
2019-04-23
2019-04-23
GLS-SO2-BAT19-II
Manufacture of Glass - SO2 - BAT19-II
3, Mineral industry: 3,3 Manufacture of glass including glass fibre with a melting capacity exceeding 20 tonnes per day; Techniques (i)-(iii) (see table), and fuel oil; Reducing sulphur oxides (SOx) emissions to air. The BAT-AEL emission level is < 500 - 1200 mg/Nm3.
valid
2019-04-23
2019-04-23
GLS-SO2-BAT19-III
Manufacture of Glass - SO2 - BAT19-III
3, Mineral industry: 3,3 Manufacture of glass including glass fibre with a melting capacity exceeding 20 tonnes per day; Techniques (i)-(iii) (see table), and natural gas; Reducing sulphur oxides (SOx) emissions to air. The BAT-AEL emission level is < 0,3 - 0,75 kg/t.
valid
2019-04-23
2019-04-23
GLS-SO2-BAT19-IV
Manufacture of Glass - SO2 - BAT19-IV
3, Mineral industry: 3,3 Manufacture of glass including glass fibre with a melting capacity exceeding 20 tonnes per day; Techniques (i)-(iii) (see table), and fuel oil; Reducing sulphur oxides (SOx) emissions to air. The BAT-AEL emission level is < 0,75 - 1,8 kg/t.
valid
2019-04-23
2019-04-23
GLS-SO2-BAT23
Manufacture of Glass - SO2 - BAT23
3, Mineral industry: 3,3 Manufacture of glass including glass fibre with a melting capacity exceeding 20 tonnes per day; Techniques (i)-(ii) (see table); Reducing sulphur oxides (SOx) emissions to air. The BAT-AEL emission level is < 100 - 200 mg/Nm3.
valid
2019-04-23
2019-04-23
GLS-SO2-BAT27-I
Manufacture of Glass - SO2 - BAT27-I
3, Mineral industry: 3,3 Manufacture of glass including glass fibre with a melting capacity exceeding 20 tonnes per day; Techniques (i)-(iii) (see table), and natural gas; Reducing sulphur oxides (SOx) emissions to air. The BAT-AEL emission level is < 300 - 500 mg/Nm3.
valid
2019-04-23
2019-04-23
GLS-SO2-BAT27-II
Manufacture of Glass - SO2 - BAT27-II
3, Mineral industry: 3,3 Manufacture of glass including glass fibre with a melting capacity exceeding 20 tonnes per day; Techniques (i)-(iii) (see table), and fuel oil; Reducing sulphur oxides (SOx) emissions to air. The BAT-AEL emission level is 500 - 1300 mg/Nm3.
valid
2019-04-23
2019-04-23
GLS-SO2-BAT27-III
Manufacture of Glass - SO2 - BAT27-III
3, Mineral industry: 3,3 Manufacture of glass including glass fibre with a melting capacity exceeding 20 tonnes per day; Techniques (i)-(iii) (see table), and natural gas; Reducing sulphur oxides (SOx) emissions to air. The BAT-AEL emission level is < 0,75 - 1,25 kg/t.
valid
2019-04-23
2019-04-23
GLS-SO2-BAT27-IV
Manufacture of Glass - SO2 - BAT27-IV
3, Mineral industry: 3,3 Manufacture of glass including glass fibre with a melting capacity exceeding 20 tonnes per day; Techniques (i)-(iii) (see table), and fuel oil; Reducing sulphur oxides (SOx) emissions to air. The BAT-AEL emission level is 1,25 - 3,25 kg/t.
valid
2019-04-23
2019-04-23
GLS-SO2-BAT31-IV
Manufacture of Glass - SO2 - BAT31-IV
3, Mineral industry: 3,3 Manufacture of glass including glass fibre with a melting capacity exceeding 20 tonnes per day; Techniques (i)-(iv) (see table); Reducing sulphur oxides (SOx) emissions to air. The BAT-AEL emission level is < 200 mg/Nm3.
valid
2019-04-23
2019-04-23
GLS-SO2-BAT34-I
Manufacture of Glass - SO2 - BAT34-I
3, Mineral industry: 3,3 Manufacture of glass including glass fibre with a melting capacity exceeding 20 tonnes per day; Techniques (i)-(iv) (see table), and natural gas; Reducing sulphur oxides (SOx) emissions to air. The BAT-AEL emission level is < 200 - 800 mg/Nm3.
valid
2019-04-23
2019-04-23
GLS-SO2-BAT34-II
Manufacture of Glass - SO2 - BAT34-II
3, Mineral industry: 3,3 Manufacture of glass including glass fibre with a melting capacity exceeding 20 tonnes per day; Techniques (i)-(iv) (see table), and fuel oil; Reducing sulphur oxides (SOx) emissions to air. The BAT-AEL emission level is < 500 - 1000 mg/Nm3.
valid
2019-04-23
2019-04-23
GLS-SO2-BAT34-III
Manufacture of Glass - SO2 - BAT34-III
3, Mineral industry: 3,3 Manufacture of glass including glass fibre with a melting capacity exceeding 20 tonnes per day; Techniques (i)-(iv) (see table), and natural gas; Reducing sulphur oxides (SOx) emissions to air. The BAT-AEL emission level is < 0,9 - 3,6 kg/t.
valid
2019-04-23
2019-04-23
GLS-SO2-BAT34-IV
Manufacture of Glass - SO2 - BAT34-IV
3, Mineral industry: 3,3 Manufacture of glass including glass fibre with a melting capacity exceeding 20 tonnes per day; Techniques (i)-(iv) (see table), and fuel oil; Reducing sulphur oxides (SOx) emissions to air. The BAT-AEL emission level is < 2,25 - 4,5 kg/t.
valid
2019-04-23
2019-04-23
GLS-SO2-BAT41-I
Manufacture of Glass - SO2 - BAT41-I
3, Mineral industry: 3,3 Manufacture of glass including glass fibre with a melting capacity exceeding 20 tonnes per day; Techniques (i)-(iii) (see table), and natural gas; Reducing sulphur oxides (SOx) emissions to air. The BAT-AEL emission level is < 200 - 300 mg/Nm3.
valid
2019-04-23
2019-04-23
GLS-SO2-BAT41-II
Manufacture of Glass - SO2 - BAT41-II
3, Mineral industry: 3,3 Manufacture of glass including glass fibre with a melting capacity exceeding 20 tonnes per day; Techniques (i)-(iii) (see table), and fuel oil; Reducing sulphur oxides (SOx) emissions to air. The BAT-AEL emission level is < 1000 mg/Nm3.
valid
2019-04-23
2019-04-23
GLS-SO2-BAT41-III
Manufacture of Glass - SO2 - BAT41-III
3, Mineral industry: 3,3 Manufacture of glass including glass fibre with a melting capacity exceeding 20 tonnes per day; Techniques (i)-(iii) (see table), and electric melting; Reducing sulphur oxides (SOx) emissions to air. The BAT-AEL emission level is < 100 mg/Nm3.
valid
2019-04-23
2019-04-23
GLS-SO2-BAT41-IV
Manufacture of Glass - SO2 - BAT41-IV
3, Mineral industry: 3,3 Manufacture of glass including glass fibre with a melting capacity exceeding 20 tonnes per day; Techniques (i)-(iii) (see table), and natural gas; Reducing sulphur oxides (SOx) emissions to air. The BAT-AEL emission level is < 0,5 - 0,75 kg/t.
valid
2019-04-23
2019-04-23
GLS-SO2-BAT41-V
Manufacture of Glass - SO2 - BAT41-V
3, Mineral industry: 3,3 Manufacture of glass including glass fibre with a melting capacity exceeding 20 tonnes per day; Techniques (i)-(iii) (see table), and fuel oil; Reducing sulphur oxides (SOx) emissions to air. The BAT-AEL emission level is < 2,5 kg/t.
valid
2019-04-23
2019-04-23
GLS-SO2-BAT41-VI
Manufacture of Glass - SO2 - BAT41-VI
3, Mineral industry: 3,3 Manufacture of glass including glass fibre with a melting capacity exceeding 20 tonnes per day; Techniques (i)-(iii) (see table), and electric melting; Reducing sulphur oxides (SOx) emissions to air. The BAT-AEL emission level is < 0,25 kg/t.
valid
2019-04-23
2019-04-23
GLS-SO2-BAT51-I
Manufacture of Glass - SO2 - BAT51-I
3, Mineral industry: 3,3 Manufacture of glass including glass fibre with a melting capacity exceeding 20 tonnes per day; Techniques (i)-(iii) (see table), and natural gas and/or electric melting; Reducing sulphur oxides (SOx) emissions to air. The BAT-AEL emission level is < 30 - 200 mg/Nm3.
valid
2019-04-23
2019-04-23
GLS-SO2-BAT51-II
Manufacture of Glass - SO2 - BAT51-II
3, Mineral industry: 3,3 Manufacture of glass including glass fibre with a melting capacity exceeding 20 tonnes per day; Techniques (i)-(iii) (see table), and fuel oil; Reducing sulphur oxides (SOx) emissions to air. The BAT-AEL emission level is 500 - 800 mg/Nm3.
valid
2019-04-23
2019-04-23
GLS-SO2-BAT51-III
Manufacture of Glass - SO2 - BAT51-III
3, Mineral industry: 3,3 Manufacture of glass including glass fibre with a melting capacity exceeding 20 tonnes per day; Techniques (i)-(iii) (see table), and natural gas and/or electric melting; Reducing sulphur oxides (SOx) emissions to air. The BAT-AEL emission level is < 0,08 - 0,5 kg/t.
valid
2019-04-23
2019-04-23
GLS-SO2-BAT51-IV
Manufacture of Glass - SO2 - BAT51-IV
3, Mineral industry: 3,3 Manufacture of glass including glass fibre with a melting capacity exceeding 20 tonnes per day; Techniques (i)-(iii) (see table), and fuel oil; Reducing sulphur oxides (SOx) emissions to air. The BAT-AEL emission level is 1,25 - 2 kg/t.
valid
2019-04-23
2019-04-23
GLS-SO2-BAT59-I
Manufacture of Glass - SO2 - BAT59-I
3, Mineral industry: 3,4 Melting mineral substances including the production of mineral fibres with a melting capacity exceeding 20 tonnes per day; Techniques (i)-(iv) (see table); for glass wool: Gas-fired and electric furnaces; Reducing sulphur oxides (SOx) emissions to air. The BAT-AEL emission level is < 50 - 150 mg/Nm3.
valid
2019-04-23
2019-04-23
GLS-SO2-BAT59-II
Manufacture of Glass - SO2 - BAT59-II
3, Mineral industry: 3,4 Melting mineral substances including the production of mineral fibres with a melting capacity exceeding 20 tonnes per day; Techniques (i)-(iv) (see table); for stone wool: Gas-fired and electric furnaces; Reducing sulphur oxides (SOx) emissions to air. The BAT-AEL emission level is < 350 mg/Nm3.
valid
2019-04-23
2019-04-23
GLS-SO2-BAT59-III
Manufacture of Glass - SO2 - BAT59-III
3, Mineral industry: 3,4 Melting mineral substances including the production of mineral fibres with a melting capacity exceeding 20 tonnes per day; Techniques (i)-(iv) (see table); for stone wool: Cupola furnaces, no briquettes or slag recycling; Reducing sulphur oxides (SOx) emissions to air. The BAT-AEL emission level is < 400 mg/Nm3.
valid
2019-04-23
2019-04-23
GLS-SO2-BAT59-IV
Manufacture of Glass - SO2 - BAT59-IV
3, Mineral industry: 3,4 Melting mineral substances including the production of mineral fibres with a melting capacity exceeding 20 tonnes per day; Techniques (i)-(iv) (see table); for stone wool: Cupola furnaces, with cement briquettes or slag recycling; Reducing sulphur oxides (SOx) emissions to air. The BAT-AEL emission level is < 1400 mg/Nm3.
valid
2019-04-23
2019-04-23
GLS-SO2-BAT59-V
Manufacture of Glass - SO2 - BAT59-V
3, Mineral industry: 3,4 Melting mineral substances including the production of mineral fibres with a melting capacity exceeding 20 tonnes per day; Techniques (i)-(iv) (see table); for glass wool: Gas-fired and electric furnaces; Reducing sulphur oxides (SOx) emissions to air. The BAT-AEL emission level is < 0,1 - 0,3 kg/t.
valid
2019-04-23
2019-04-23
GLS-SO2-BAT59-VI
Manufacture of Glass - SO2 - BAT59-VI
3, Mineral industry: 3,4 Melting mineral substances including the production of mineral fibres with a melting capacity exceeding 20 tonnes per day; Techniques (i)-(iv) (see table); for stone wool: Gas-fired and electric furnaces; Reducing sulphur oxides (SOx) emissions to air. The BAT-AEL emission level is < 0,9 kg/t.
valid
2019-04-23
2019-04-23
GLS-SO2-BAT59-VII
Manufacture of Glass - SO2 - BAT59-VII
3, Mineral industry: 3,4 Melting mineral substances including the production of mineral fibres with a melting capacity exceeding 20 tonnes per day; Techniques (i)-(iv) (see table); for stone wool: Cupola furnaces, no briquettes or slag recycling; Reducing sulphur oxides (SOx) emissions to air. The BAT-AEL emission level is < 1 kg/t.
valid
2019-04-23
2019-04-23
GLS-SO2-BAT59-VIII
Manufacture of Glass - SO2 - BAT59-VIII
3, Mineral industry: 3,4 Melting mineral substances including the production of mineral fibres with a melting capacity exceeding 20 tonnes per day; Techniques (i)-(iv) (see table); for stone wool: Cupola furnaces, with cement briquettes or slag recycling; Reducing sulphur oxides (SOx) emissions to air. The BAT-AEL emission level is < 3,5 kg/t.
valid
2019-04-23
2019-04-23
GLS-SO2-BAT67
Manufacture of Glass - SO2 - BAT67
3, Mineral industry: 3,4 Melting mineral substances including the production of mineral fibres with a melting capacity exceeding 20 tonnes per day; Primary techniques (i)-(ii) (see table); Reducing sulphur oxides (SOx) emissions to air. The BAT-AEL emission level is < 50 mg/Nm3.
valid
2019-04-23
2019-04-23
GLS-SO2-BAT73-I
Manufacture of Glass - SO2 - BAT73-I
3, Mineral industry: 3,4 Melting mineral substances including the production of mineral fibres with a melting capacity exceeding 20 tonnes per day; Techniques (i)-(iii) (see table); Reducing sulphur oxides (SOx) emissions to air. The BAT-AEL emission level is < 50 - 200 mg/Nm3.
valid
2019-04-23
2019-04-23
GLS-SO2-BAT73-II
Manufacture of Glass - SO2 - BAT73-II
3, Mineral industry: 3,4 Melting mineral substances including the production of mineral fibres with a melting capacity exceeding 20 tonnes per day; Techniques (i)-(iii) (see table); Reducing sulphur oxides (SOx) emissions to air. The BAT-AEL emission level is < 0,25 - 1,5 kg/t.
valid
2019-04-23
2019-04-23
GLS-SO4-BAT13-IV
Manufacture of Glass - SO4 - BAT13-IV
3, Mineral industry: 3,3 Manufacture of glass including glass fibre with a melting capacity exceeding 20 tonnes per day Reducing sulphates to water. The BAT-AEL emission level is < 1000 mg/l.
valid
2019-04-23
2019-04-23
GLS-Sb-BAT13-VIII
Manufacture of Glass - Sb - BAT13-VIII
3, Mineral industry: 3,3 Manufacture of glass including glass fibre with a melting capacity exceeding 20 tonnes per day Reducing antimony to water. The BAT-AEL emission level is < 0,5 mg/l.
valid
2019-04-23
2019-04-23
GLS-Se-BAT30-I
Manufacture of Glass - Se - BAT30-I
3, Mineral industry: 3,3 Manufacture of glass including glass fibre with a melting capacity exceeding 20 tonnes per day; Techniques (i)-(iii) (see table); Reducing selenium compounds emissions to air. The BAT-AEL emission level is 1 - 3 mg/Nm3.
valid
2019-04-23
2019-04-23
GLS-Se-BAT30-II
Manufacture of Glass - Se - BAT30-II
3, Mineral industry: 3,3 Manufacture of glass including glass fibre with a melting capacity exceeding 20 tonnes per day; Techniques (i)-(iii) (see table); Reducing selenium compounds emissions to air. The BAT-AEL emission level is 0,0025 - 0,0075 kg/t.
valid
2019-04-23
2019-04-23
GLS-Se-BAT44-I
Manufacture of Glass - Se - BAT44-I
3, Mineral industry: 3,3 Manufacture of glass including glass fibre with a melting capacity exceeding 20 tonnes per day; Techniques (i)-(ii) (see table); Reducing selenium compounds emissions to air. The BAT-AEL emission level is < 1 mg/Nm3.
valid
2019-04-23
2019-04-23
GLS-Se-BAT44-II
Manufacture of Glass - Se - BAT44-II
3, Mineral industry: 3,3 Manufacture of glass including glass fibre with a melting capacity exceeding 20 tonnes per day; Techniques (i)-(ii) (see table); Reducing selenium compounds emissions to air. The BAT-AEL emission level is < 0,003 kg/t.
valid
2019-04-23
2019-04-23
GLS-Sn-BAT13-XV
Manufacture of Glass - Sn - BAT13-XV
3, Mineral industry: 3,3 Manufacture of glass including glass fibre with a melting capacity exceeding 20 tonnes per day Reducing tin to water. The BAT-AEL emission level is < 0,5 mg/l.
valid
2019-04-23
2019-04-23
GLS-Sn-BAT22-III
Manufacture of Glass - Sn - BAT22-III
3, Mineral industry: 3,3 Manufacture of glass including glass fibre with a melting capacity exceeding 20 tonnes per day; Techniques (i)-(iii) (see table); Reducing tin compounds emissions to air. The BAT-AEL emission level is < 5 mg/Nm3.
valid
2019-04-23
2019-04-23
GLS-THC-BAT13-VI
Manufacture of Glass - THC - BAT13-VI
3, Mineral industry: 3,3 Manufacture of glass including glass fibre with a melting capacity exceeding 20 tonnes per day Reducing total hydrocarbons to water. The BAT-AEL emission level is < 15 mg/l.
valid
2019-04-23
2019-04-23
GLS-TPM-BAT63-I
Manufacture of Glass - TPM - BAT63-I
3, Mineral industry: 3,4 Melting mineral substances including the production of mineral fibres with a melting capacity exceeding 20 tonnes per day; Techniques (i)-(v) (see table); Reducing total particulate matter emissions to air. The BAT-AEL emission level is < 20 - 50 mg/Nm3.
valid
2019-04-23
2019-04-23
GLS-TPM-BAT63-VII
Manufacture of Glass - TPM - BAT63-VII
3, Mineral industry: 3,4 Melting mineral substances including the production of mineral fibres with a melting capacity exceeding 20 tonnes per day; Techniques (i)-(v) (see table); Reducing total particulate matter emissions to air. The BAT-AEL emission level is < 5 - 30 mg/Nm3.
valid
2019-04-23
2019-04-23
GLS-TPM-BAT63-XIV
Manufacture of Glass - TPM - BAT63-XIV
3, Mineral industry: 3,4 Melting mineral substances including the production of mineral fibres with a melting capacity exceeding 20 tonnes per day; Techniques (i)-(v) (see table); Reducing total particulate matter emissions to air. The BAT-AEL emission level is < 0,2 kg/t.
valid
2019-04-23
2019-04-23
GLS-TSS-BAT13-II
Manufacture of Glass - TSS - BAT13-II
3, Mineral industry: 3,3 Manufacture of glass including glass fibre with a melting capacity exceeding 20 tonnes per day Reducing total suspended solids to water. The BAT-AEL emission level is < 30 mg/l.
valid
2019-04-23
2019-04-23
GLS-Ti-BAT22-II
Manufacture of Glass - Ti - BAT22-II
3, Mineral industry: 3,3 Manufacture of glass including glass fibre with a melting capacity exceeding 20 tonnes per day; Techniques (i)-(iii) (see table); Reducing titanium compounds emissions to air. The BAT-AEL emission level is < 5 mg/Nm3.
valid
2019-04-23
2019-04-23
GLS-Zn-BAT13-XI
Manufacture of Glass - Zn - BAT13-XI
3, Mineral industry: 3,3 Manufacture of glass including glass fibre with a melting capacity exceeding 20 tonnes per day Reducing zinc to water. The BAT-AEL emission level is < 0,5 mg/l.
valid
2019-04-23
2019-04-23
GLS-pH-BAT13-I
Manufacture of Glass - pH - BAT13-I
3, Mineral industry: 3,3 Manufacture of glass including glass fibre with a melting capacity exceeding 20 tonnes per day Reducing pH to water. The BAT-AEL emission level is 6,5 – 9.
valid
2019-04-23
2019-04-23
IRPP-NH3-BAT30-I
Intensive rearing of poultry or pigs - NH3 - BAT30-I
6. Other activities: 6.6 (c): Intensive rearing of poultry or pigs with more than 750 places for sows - mating and gestating sows; Techniques (a)-(e) (see table incl. footnote) for mating and gestating sows; Reducing ammonia emissions to air. The BAT-AEL emission level is 0,2-2,7 kg NH3/animal place/year.
valid
2019-04-23
2019-04-23
IRPP-NH3-BAT30-II
Intensive rearing of poultry or pigs - NH3 - BAT30-II
6. Other activities: 6.6 (c): Intensive rearing of poultry or pigs with more than 750 places for sows - farrowing sows (including piglets) in crates; Techniques (a)-(e) (see table incl. footnote) for farrowing sows (including piglets) in crates; Reducing ammonia emissions to air. The BAT-AEL emission level is 0,4-5,6 kg NH3/animal place/year.
valid
2019-04-23
2019-04-23
IRPP-NH3-BAT30-III
Intensive rearing of poultry or pigs - NH3 - BAT30-III
6. Other activities: 6.6 (c): Intensive rearing of poultry or pigs with more than 750 places for sows - weaners; Techniques (a)-(e) (see table incl. footnote) for weaners; Reducing ammonia emissions to air. The BAT-AEL emission level is 0,03-0,53 kg NH3/animal place/year.
valid
2019-04-23
2019-04-23
IRPP-NH3-BAT30-IV
Intensive rearing of poultry or pigs - NH3 - BAT30-IV
6. Other activities: 6.6 (b): Intensive rearing of poultry or pigs with more than 2 000 places for production pigs (over 30 kg) - fattening pigs; Techniques (a)-(e) (see table incl. footnote) for fattening pigs; Reducing ammonia emissions to air. The BAT-AEL emission level is 0,1-2,6 kg NH3/animal place/year.
valid
2019-04-23
2019-04-23
IRPP-NH3-BAT31-I
Intensive rearing of poultry or pigs - NH3 - BAT31-I
6. Other activities: 6.6 (a): Intensive rearing of poultry or pigs with more than 40 000 places for poultry; Techniques (a)-(c) (see table incl. footnote) for fattening pigs for cage systems; Reducing ammonia emissions to air. The BAT-AEL emission level is 0,02-0,08 kg NH3/animal place/year.
valid
2019-04-23
2019-04-23
IRPP-NH3-BAT31-II
Intensive rearing of poultry or pigs - NH3 - BAT31-II
6. Other activities: 6.6 (a): Intensive rearing of poultry or pigs with more than 40 000 places for poultry; Techniques (a)-(c) (see table incl. footnote) for fattening pigs for non-cage systems; Reducing ammonia emissions to air. The BAT-AEL emission level is 0,02-0,13 kg NH3/animal place/year.
valid
2019-04-23
2019-04-23
IRPP-NH3-BAT32
Intensive rearing of poultry or pigs - NH3 - BAT32
6. Other activities: 6.6 (a): Intensive rearing of poultry or pigs with more than 40 000 places for poultry; Techniques (a)-(f) (see table incl. footnote); Reducing ammonia emissions to air. The BAT-AEL emission level is 0,01-0,08 kg NH3/animal place/year.
valid
2019-04-23
2019-04-23
IS-BOD5-BAT56-II
Iron and Steel Production - BOD5 - BAT56-II
1, Energy industries undertaking activities related to 2.2: 1,3 Production of coke Reducing biological oxygen demand for 5 days (BOD5) to water. The BAT-AEL emission level is < 20 mg/l.
valid
2019-04-23
2019-04-23
IS-CN-BAT56-V
Iron and Steel Production - CN - BAT56-V
1, Energy industries undertaking activities related to 2.2: 1,3 Production of coke Reducing cyanide (CN-) to water. The BAT-AEL emission level is < 0,1 mg/l.
valid
2019-04-23
2019-04-23
IS-CN-BAT67-V
Iron and Steel Production - CN - BAT67-V
2, Production and processing of metals: 2,2 Production of pig iron or steel (primary or secondary fusion) including continuous casting, with a capacity exceeding 2,5 tonnes per hour Reducing cyanide (CN-) to water. The BAT-AEL emission level is < 0,4 mg/l.
valid
2019-04-23
2019-04-23
IS-COD-BAT28-II
Iron and Steel Production - COD - BAT28-II
2, Production and processing of metals: 2,1 Metal ore (including sulphide ore) roasting or sintering Reducing chemical oxygen demand (COD) to water. The BAT-AEL emission level is < 100 mg/l.
valid
2019-04-23
2019-04-23
IS-COD-BAT39-II
Iron and Steel Production - COD - BAT39-II
2, Production and processing of metals: 2,1 Metal ore (including sulphide ore) roasting or sintering Reducing chemical oxygen demand (COD) to water. The BAT-AEL emission level is < 160 mg/l.
valid
2019-04-23
2019-04-23
IS-COD-BAT56-I
Iron and Steel Production - COD - BAT56-I
1, Energy industries undertaking activities related to 2.2: 1,3 Production of coke Reducing chemical oxygen demand (COD) to water. The BAT-AEL emission level is < 220 mg/l.
valid
2019-04-23
2019-04-23
IS-Cr-BAT81-V
Iron and Steel Production - Cr - BAT81-V
2, Production and processing of metals: 2,2 Production of pig iron or steel (primary or secondary fusion) including continuous casting, with a capacity exceeding 2,5 tonnes per hour Reducing total chromium to water. The BAT-AEL emission level is < 0,5 mg/l.
valid
2019-04-23
2019-04-23
IS-Cr-BAT92-V
Iron and Steel Production - Cr - BAT92-V
2, Production and processing of metals: 2,2 Production of pig iron or steel (primary or secondary fusion) including continuous casting, with a capacity exceeding 2,5 tonnes per hour Reducing total chromium to water. The BAT-AEL emission level is < 0,5 mg/l.
valid
2019-04-23
2019-04-23
IS-Dust-BAT20-I
Iron and Steel Production - Dust - BAT20-I
2, Production and processing of metals: 2,1 Metal ore (including sulphide ore) roasting or sintering; Bag filter for new and existing plants; Reducing dust emissions to air. The BAT-AEL emission level is < 1 - 15 mg/Nm3.
valid
2019-04-23
2019-04-23
IS-Dust-BAT20-II
Iron and Steel Production - Dust - BAT20-II
2, Production and processing of metals: 2,1 Metal ore (including sulphide ore) roasting or sintering; Advanced electrostatic precipitators for existing plants, when bag filters are not applicable; Reducing dust emissions to air. The BAT-AEL emission level is < 20 - 40 mg/Nm3.
valid
2019-04-23
2019-04-23
IS-Dust-BAT26-I
Iron and Steel Production - Dust - BAT26-I
2, Production and processing of metals: 2,1 Metal ore (including sulphide ore) roasting or sintering; Bag filter; Reducing dust emissions to air. The BAT-AEL emission level is < 10 mg/Nm3.
valid
2019-04-23
2019-04-23
IS-Dust-BAT26-II
Iron and Steel Production - Dust - BAT26-II
2, Production and processing of metals: 2,1 Metal ore (including sulphide ore) roasting or sintering; Electrostatic precipitator; Reducing dust emissions to air. The BAT-AEL emission level is < 30 mg/Nm3.
valid
2019-04-23
2019-04-23
IS-Dust-BAT33-I
Iron and Steel Production - Dust - BAT33-I
2, Production and processing of metals: 2,1 Metal ore (including sulphide ore) roasting or sintering; Crushing, grinding and drying; Reducing dust emissions to air. The BAT-AEL emission level is < 20 mg/Nm3.
valid
2019-04-23
2019-04-23
IS-Dust-BAT33-II
Iron and Steel Production - Dust - BAT33-II
2, Production and processing of metals: 2,1 Metal ore (including sulphide ore) roasting or sintering; All other process steps or where all waste gases are treated together; Reducing dust emissions to air. The BAT-AEL emission level is < 10 - 15 mg/Nm3.
valid
2019-04-23
2019-04-23
IS-Dust-BAT42
Iron and Steel Production - Dust - BAT42
1, Energy industries undertaking activities related to 2.2: 1,3 Production of coke; Coal grinding plants, techniques (I.)-(II.) (see list); Reducing dust emissions to air. The BAT-AEL emission level is < 10 - 20 mg/Nm3.
valid
2019-04-23
2019-04-23
IS-Dust-BAT43
Iron and Steel Production - Dust - BAT43
1, Energy industries undertaking activities related to 2.2: 1,3 Production of coke; Using efficient extraction and subsequent dedusting (technique (V.); Reducing dust emissions to air. The BAT-AEL emission level is < 10 - 20 mg/Nm3.
valid
2019-04-23
2019-04-23
IS-Dust-BAT44-I
Iron and Steel Production - Dust - BAT44-I
1, Energy industries undertaking activities related to 2.2: 1,3 Production of coke; Coal charging systems with land-based treatment of extracted gases; Reducing dust emissions to air. The BAT-AEL emission level is < 5 g/t.
valid
2019-04-23
2019-04-23
IS-Dust-BAT44-II
Iron and Steel Production - Dust - BAT44-II
1, Energy industries undertaking activities related to 2.2: 1,3 Production of coke; Coal charging systems with land-based treatment of extracted gases; Reducing dust emissions to air. The BAT-AEL emission level is < 50 mg/Nm3.
valid
2019-04-23
2019-04-23
IS-Dust-BAT49-II
Iron and Steel Production - Dust - BAT49-II
1, Energy industries undertaking activities related to 2.2: 1,3 Production of coke; Techniques (I.)-(IV.) (see list); Reducing dust emissions to air. The BAT-AEL emission level is < 1 - 20 mg/Nm3.
valid
2019-04-23
2019-04-23
IS-Dust-BAT50-I
Iron and Steel Production - Dust - BAT50-I
1, Energy industries undertaking activities related to 2.2: 1,3 Production of coke; Bag filters; Reducing dust emissions to air. The BAT-AEL emission level is < 10 mg/Nm3.
valid
2019-04-23
2019-04-23
IS-Dust-BAT50-II
Iron and Steel Production - Dust - BAT50-II
1, Energy industries undertaking activities related to 2.2: 1,3 Production of coke; Other cases; Reducing dust emissions to air. The BAT-AEL emission level is < 20 mg/Nm3.
valid
2019-04-23
2019-04-23
IS-Dust-BAT51-I
Iron and Steel Production - Dust - BAT51-I
1, Energy industries undertaking activities related to 2.2: 1,3 Production of coke; Coke dry quenching (CDQ); Reducing dust emissions to air. The BAT-AEL emission level is < 20 mg/Nm3.
valid
2019-04-23
2019-04-23
IS-Dust-BAT51-II
Iron and Steel Production - Dust - BAT51-II
1, Energy industries undertaking activities related to 2.2: 1,3 Production of coke; Emission-minimised conventional wet quenching; Reducing dust emissions to air. The BAT-AEL emission level is < 25 g/t.
valid
2019-04-23
2019-04-23
IS-Dust-BAT51-III
Iron and Steel Production - Dust - BAT51-III
1, Energy industries undertaking activities related to 2.2: 1,3 Production of coke; Coke stabilisation quenching (CSQ); Reducing dust emissions to air. The BAT-AEL emission level is < 10 g/t.
valid
2019-04-23
2019-04-23
IS-Dust-BAT52
Iron and Steel Production - Dust - BAT52
1, Energy industries undertaking activities related to 2.2: 1,3 Production of coke; Techniques (I.)-(II.) (see list); Reducing dust emissions to air. The BAT-AEL emission level is < 10 mg/Nm3.
valid
2019-04-23
2019-04-23
IS-Dust-BAT59
Iron and Steel Production - Dust - BAT59
2, Production and processing of metals: 2,2 Production of pig iron or steel (primary or secondary fusion) including continuous casting, with a capacity exceeding 2,5 tonnes per hour; Dust capture and dry dedusting; Reducing dust emissions to air. The BAT-AEL emission level is < 20 mg/Nm3.
valid
2019-04-23
2019-04-23
IS-Dust-BAT61
Iron and Steel Production - Dust - BAT61
2, Production and processing of metals: 2,2 Production of pig iron or steel (primary or secondary fusion) including continuous casting, with a capacity exceeding 2,5 tonnes per hour; BAT II (see list); Reducing dust emissions to air. The BAT-AEL emission level is < 1 - 15 mg/Nm3.
valid
2019-04-23
2019-04-23
IS-Dust-BAT64
Iron and Steel Production - Dust - BAT64
2, Production and processing of metals: 2,2 Production of pig iron or steel (primary or secondary fusion) including continuous casting, with a capacity exceeding 2,5 tonnes per hour; Techniques (I)-(II) (see list); Reducing dust emissions to air. The BAT-AEL emission level is < 10 mg/Nm3 .
valid
2019-04-23
2019-04-23
IS-Dust-BAT65-II
Iron and Steel Production - Dust - BAT65-II
2, Production and processing of metals: 2,2 Production of pig iron or steel (primary or secondary fusion) including continuous casting, with a capacity exceeding 2,5 tonnes per hour; Desulphurised and dedusted surplus coke oven gas, dedusted blast furnace gas, dedusted basic oxygen furnace gas and natural gas; Reducing dust emissions to air. The BAT-AEL emission level is < 10 mg/Nm3.
valid
2019-04-23
2019-04-23
IS-Dust-BAT75-I
Iron and Steel Production - Dust - BAT75-I
2, Production and processing of metals: 2,2 Production of pig iron or steel (primary or secondary fusion) including continuous casting, with a capacity exceeding 2,5 tonnes per hour; BAT III.i (see list); Reducing dust emissions to air. The BAT-AEL emission level is 10 – 30 mg/Nm3 .
valid
2019-04-23
2019-04-23
IS-Dust-BAT75-II
Iron and Steel Production - Dust - BAT75-II
2, Production and processing of metals: 2,2 Production of pig iron or steel (primary or secondary fusion) including continuous casting, with a capacity exceeding 2,5 tonnes per hour; BAT III.ii (see list); Reducing dust emissions to air. The BAT-AEL emission level is < 50 mg/Nm3 .
valid
2019-04-23
2019-04-23
IS-Dust-BAT76-I
Iron and Steel Production - Dust - BAT76-I
2, Production and processing of metals: 2,2 Production of pig iron or steel (primary or secondary fusion) including continuous casting, with a capacity exceeding 2,5 tonnes per hour; BAT I (see list) for new and existing plants; Reducing dust emissions to air. The BAT-AEL emission level is 10 - 30 mg/Nm3.
valid
2019-04-23
2019-04-23
IS-Dust-BAT76-II
Iron and Steel Production - Dust - BAT76-II
2, Production and processing of metals: 2,2 Production of pig iron or steel (primary or secondary fusion) including continuous casting, with a capacity exceeding 2,5 tonnes per hour; BAT II (see list) for existing plants; Reducing dust emissions to air. The BAT-AEL emission level is < 50 mg/Nm3.
valid
2019-04-23
2019-04-23
IS-Dust-BAT78-I
Iron and Steel Production - Dust - BAT78-I
2, Production and processing of metals: 2,2 Production of pig iron or steel (primary or secondary fusion) including continuous casting, with a capacity exceeding 2,5 tonnes per hour; Bag filter; Reducing dust emissions to air. The BAT-AEL emission level is < 1 - 15 mg/Nm3.
valid
2019-04-23
2019-04-23
IS-Dust-BAT78-II
Iron and Steel Production - Dust - BAT78-II
2, Production and processing of metals: 2,2 Production of pig iron or steel (primary or secondary fusion) including continuous casting, with a capacity exceeding 2,5 tonnes per hour; ESP; Reducing dust emissions to air. The BAT-AEL emission level is < 20 mg/Nm3.
valid
2019-04-23
2019-04-23
IS-Dust-BAT78-III
Iron and Steel Production - Dust - BAT78-III
2, Production and processing of metals: 2,2 Production of pig iron or steel (primary or secondary fusion) including continuous casting, with a capacity exceeding 2,5 tonnes per hour; Bag filter; Reducing dust emissions to air. The BAT-AEL emission level is < 1 - 10 mg/Nm3.
valid
2019-04-23
2019-04-23
IS-Dust-BAT78-IV
Iron and Steel Production - Dust - BAT78-IV
2, Production and processing of metals: 2,2 Production of pig iron or steel (primary or secondary fusion) including continuous casting, with a capacity exceeding 2,5 tonnes per hour; ESP; Reducing dust emissions to air. The BAT-AEL emission level is < 20 mg/Nm3.
valid
2019-04-23
2019-04-23
IS-Dust-BAT79
Iron and Steel Production - Dust - BAT79
2, Production and processing of metals: 2,2 Production of pig iron or steel (primary or secondary fusion) including continuous casting, with a capacity exceeding 2,5 tonnes per hour; BAT I (see list); Reducing dust emissions to air. The BAT-AEL emission level is < 10 - 20 mg/Nm3.
valid
2019-04-23
2019-04-23
IS-Dust-BAT88-I
Iron and Steel Production - Dust - BAT88-I
2, Production and processing of metals: 2,2 Production of pig iron or steel (primary or secondary fusion) including continuous casting, with a capacity exceeding 2,5 tonnes per hour; Techniques (I.)-(III.) (see list) and dedusting by bag filter; Reducing dust emissions to air. The BAT-AEL emission level is < 5 mg/Nm3.
valid
2019-04-23
2019-04-23
IS-Dust-BAT90
Iron and Steel Production - Dust - BAT90
2, Production and processing of metals: 2,2 Production of pig iron or steel (primary or secondary fusion) including continuous casting, with a capacity exceeding 2,5 tonnes per hour; BAT I; Reducing dust emissions to air. The BAT-AEL emission level is < 10 - 20 mg/Nm3.
valid
2019-04-23
2019-04-23
IS-Fe-BAT67-II
Iron and Steel Production - Fe - BAT67-II
2, Production and processing of metals: 2,2 Production of pig iron or steel (primary or secondary fusion) including continuous casting, with a capacity exceeding 2,5 tonnes per hour Reducing iron to water. The BAT-AEL emission level is < 5 mg/l.
valid
2019-04-23
2019-04-23
IS-Fe-BAT81-II
Iron and Steel Production - Fe - BAT81-II
2, Production and processing of metals: 2,2 Production of pig iron or steel (primary or secondary fusion) including continuous casting, with a capacity exceeding 2,5 tonnes per hour Reducing iron to water. The BAT-AEL emission level is < 5 mg/l.
valid
2019-04-23
2019-04-23
IS-Fe-BAT92-II
Iron and Steel Production - Fe - BAT92-II
2, Production and processing of metals: 2,2 Production of pig iron or steel (primary or secondary fusion) including continuous casting, with a capacity exceeding 2,5 tonnes per hour Reducing iron to water. The BAT-AEL emission level is < 5 mg/l.
valid
2019-04-23
2019-04-23
IS-H2S-BAT48-I
Iron and Steel Production - H2S - BAT48-I
1, Energy industries undertaking activities related to 2.2: 1,3 Production of coke; Technique (I.) (see list); Reducing hydrogen sulphide emissions to air. The BAT-AEL emission level is < 300 – 1 000 mg/Nm3.
valid
2019-04-23
2019-04-23
IS-H2S-BAT48-II
Iron and Steel Production - H2S - BAT48-II
1, Energy industries undertaking activities related to 2.2: 1,3 Production of coke; Technique (II.) (see list); Reducing hydrogen sulphide emissions to air. The BAT-AEL emission level is < 10 mg/Nm3 .
valid
2019-04-23
2019-04-23
IS-HCl-BAT34-III
Iron and Steel Production - HCl - BAT34-III
2, Production and processing of metals: 2,1 Metal ore (including sulphide ore) roasting or sintering; Wet scrubber, semi-dry absorption with a subsequent dedusting system; Reducing hydrogen chloride (HCl) emissions to air. The BAT-AEL emission level is < 1 - 3 mg/Nm3.
valid
2019-04-23
2019-04-23
IS-HF-BAT34-II
Iron and Steel Production - HF - BAT34-II
2, Production and processing of metals: 2,1 Metal ore (including sulphide ore) roasting or sintering; Wet scrubber, semi-dry absorption with a subsequent dedusting system; Reducing hydrogen fluoride (HF) emissions to air. The BAT-AEL emission level is < 1 - 3 mg/Nm3.
valid
2019-04-23
2019-04-23
IS-Hg-BAT21
Iron and Steel Production - Hg - BAT21
2, Production and processing of metals: 2,1 Metal ore (including sulphide ore) roasting or sintering; Waste gas treatment with activated carbon or lignite coke injection; Reducing mercury emissions to air. The BAT-AEL emission level is < 0,03 - 0,05 mg/Nm3.
valid
2019-04-23
2019-04-23
IS-Hg-BAT88-II
Iron and Steel Production - Hg - BAT88-II
2, Production and processing of metals: 2,2 Production of pig iron or steel (primary or secondary fusion) including continuous casting, with a capacity exceeding 2,5 tonnes per hour; Techniques (I.)-(III.) (see list) and dedusting by bag filter; Reducing mercury emissions to air. The BAT-AEL emission level is < 0,05 mg/Nm3.
valid
2019-04-23
2019-04-23
IS-Metals-BAT28-III
Iron and Steel Production - Metals - BAT28-III
2, Production and processing of metals: 2,1 Metal ore (including sulphide ore) roasting or sintering Reducing heavy metals to water. The BAT-AEL emission level is < 0,1 mg/l.
valid
2019-04-23
2019-04-23
IS-Metals-BAT39-IV
Iron and Steel Production - Metals - BAT39-IV
2, Production and processing of metals: 2,1 Metal ore (including sulphide ore) roasting or sintering Reducing heavy metals to water. The BAT-AEL emission level is < 0,55 mg/l.
valid
2019-04-23
2019-04-23
IS-NO2-BAT23-I
Iron and Steel Production - NO2 - BAT23-I
2, Production and processing of metals: 2,1 Metal ore (including sulphide ore) roasting or sintering; Process integrated measures (I.); Reducing nitrogen oxides (NOx) emissions to air. The BAT-AEL emission level is < 500 mg/Nm3.
valid
2019-04-23
2019-04-23
IS-NO2-BAT23-II
Iron and Steel Production - NO2 - BAT23-II
2, Production and processing of metals: 2,1 Metal ore (including sulphide ore) roasting or sintering; RAC (II.i); Reducing nitrogen oxides (NOx) emissions to air. The BAT-AEL emission level is < 250 mg/Nm3.
valid
2019-04-23
2019-04-23
IS-NO2-BAT23-III
Iron and Steel Production - NO2 - BAT23-III
2, Production and processing of metals: 2,1 Metal ore (including sulphide ore) roasting or sintering; SCR (II.ii); Reducing nitrogen oxides (NOx) emissions to air. The BAT-AEL emission level is < 120 mg/Nm3.
valid
2019-04-23
2019-04-23
IS-NO2-BAT49-III
Iron and Steel Production - NO2 - BAT49-III
1, Energy industries undertaking activities related to 2.2: 1,3 Production of coke; Techniques (I.)-(IV.) (see list) for New or substantially revamped plants (< 10 years old); Reducing nitrogen oxides (NOx) emissions to air. The BAT-AEL emission level is < 350 - 500 mg/Nm3.
valid
2019-04-23
2019-04-23
IS-NO2-BAT49-IV
Iron and Steel Production - NO2 - BAT49-IV
1, Energy industries undertaking activities related to 2.2: 1,3 Production of coke; Techniques (I.)-(IV.) (see list) for Older plants (> 10 years old); Reducing nitrogen oxides (NOx) emissions to air. The BAT-AEL emission level is 500 - 650 mg/Nm3.
valid
2019-04-23
2019-04-23
IS-NO2-BAT65-III
Iron and Steel Production - NO2 - BAT65-III
2, Production and processing of metals: 2,2 Production of pig iron or steel (primary or secondary fusion) including continuous casting, with a capacity exceeding 2,5 tonnes per hour; Desulphurised and dedusted surplus coke oven gas, dedusted blast furnace gas, dedusted basic oxygen furnace gas and natural gas; Reducing nitrogen oxides (NOx) emissions to air. The BAT-AEL emission level is < 100 mg/Nm3.
valid
2019-04-23
2019-04-23
IS-Ni-BAT81-IV
Iron and Steel Production - Ni - BAT81-IV
2, Production and processing of metals: 2,2 Production of pig iron or steel (primary or secondary fusion) including continuous casting, with a capacity exceeding 2,5 tonnes per hour Reducing nickel to water. The BAT-AEL emission level is < 0,5 mg/l.
valid
2019-04-23
2019-04-23
IS-Ni-BAT92-IV
Iron and Steel Production - Ni - BAT92-IV
2, Production and processing of metals: 2,2 Production of pig iron or steel (primary or secondary fusion) including continuous casting, with a capacity exceeding 2,5 tonnes per hour Reducing nickel to water. The BAT-AEL emission level is < 0,5 mg/l.
valid
2019-04-23
2019-04-23
IS-PAH-BAT56-VI
Iron and Steel Production - PAH - BAT56-VI
1, Energy industries undertaking activities related to 2.2: 1,3 Production of coke Reducing polycyclic aromatic hydrocarbons (PAH) to water. The BAT-AEL emission level is < 0,05 mg/l.
valid
2019-04-23
2019-04-23
IS-PCDD.F-BAT25-I
Iron and Steel Production - PCDD.F - BAT25-I
2, Production and processing of metals: 2,1 Metal ore (including sulphide ore) roasting or sintering; Bag filter; Reducing polychlorinated dibenzodioxins/ furans (PCDD/F) emissions to air. The BAT-AEL emission level is < 0,05 - 0,2 ng/Nm3.
valid
2019-04-23
2019-04-23
IS-PCDD.F-BAT25-II
Iron and Steel Production - PCDD.F - BAT25-II
2, Production and processing of metals: 2,1 Metal ore (including sulphide ore) roasting or sintering; Advanced electrostatic precipitator; Reducing polychlorinated dibenzodioxins/ furans (PCDD/F) emissions to air. The BAT-AEL emission level is < 0,2 - 0,4 ng/Nm3.
valid
2019-04-23
2019-04-23
IS-PCDD.F-BAT89
Iron and Steel Production - PCDD.F - BAT89
2, Production and processing of metals: 2,2 Production of pig iron or steel (primary or secondary fusion) including continuous casting, with a capacity exceeding 2,5 tonnes per hour; Techniques (I.)-(III.) (see list); Reducing polychlorinated dibenzodioxins/ furans (PCDD/F) emissions to air. The BAT-AEL emission level is < 0,1 ng/Nm3.
valid
2019-04-23
2019-04-23
IS-Pb-BAT67-III
Iron and Steel Production - Pb - BAT67-III
2, Production and processing of metals: 2,2 Production of pig iron or steel (primary or secondary fusion) including continuous casting, with a capacity exceeding 2,5 tonnes per hour Reducing lead to water. The BAT-AEL emission level is < 0,5 mg/l.
valid
2019-04-23
2019-04-23
IS-Phenols-BAT56-VII
Iron and Steel Production - Phenols - BAT56-VII
1, Energy industries undertaking activities related to 2.2: 1,3 Production of coke Reducing phenols to water. The BAT-AEL emission level is < 0,5 mg/l.
valid
2019-04-23
2019-04-23
IS-S-BAT56-III
Iron and Steel Production - S - BAT56-III
1, Energy industries undertaking activities related to 2.2: 1,3 Production of coke Reducing sulphides to water. The BAT-AEL emission level is < 0,1 mg/l.
valid
2019-04-23
2019-04-23
IS-SCN-BAT56-IV
Iron and Steel Production - SCN - BAT56-IV
1, Energy industries undertaking activities related to 2.2: 1,3 Production of coke Reducing thiocyanate (SCN-) to water. The BAT-AEL emission level is < 4 mg/l.
valid
2019-04-23
2019-04-23
IS-SO2-BAT22-I
Iron and Steel Production - SO2 - BAT22-I
2, Production and processing of metals: 2,1 Metal ore (including sulphide ore) roasting or sintering; BAT I - IV (see list); Reducing sulphur oxides (SOx) emissions to air. The BAT-AEL emission level is < 350 - 500 mg/Nm3.
valid
2019-04-23
2019-04-23
IS-SO2-BAT22-II
Iron and Steel Production - SO2 - BAT22-II
2, Production and processing of metals: 2,1 Metal ore (including sulphide ore) roasting or sintering; BAT V (see list); Reducing sulphur oxides (SOx) emissions to air. The BAT-AEL emission level is < 100 mg/Nm3.
valid
2019-04-23
2019-04-23
IS-SO2-BAT34-I
Iron and Steel Production - SO2 - BAT34-I
2, Production and processing of metals: 2,1 Metal ore (including sulphide ore) roasting or sintering; Wet scrubber, semi-dry absorption with a subsequent dedusting system; Reducing sulphur oxides (SOx) emissions to air. The BAT-AEL emission level is < 30 - 50 mg/Nm3.
valid
2019-04-23
2019-04-23
IS-SO2-BAT49-I
Iron and Steel Production - SO2 - BAT49-I
1, Energy industries undertaking activities related to 2.2: 1,3 Production of coke; Techniques (I.)-(IV.) (see list); Reducing sulphur oxides (SOx) emissions to air. The BAT-AEL emission level is < 200 - 500 mg/Nm3.
valid
2019-04-23
2019-04-23
IS-SO2-BAT65-I
Iron and Steel Production - SO2 - BAT65-I
2, Production and processing of metals: 2,2 Production of pig iron or steel (primary or secondary fusion) including continuous casting, with a capacity exceeding 2,5 tonnes per hour; Desulphurised and dedusted surplus coke oven gas, dedusted blast furnace gas, dedusted basic oxygen furnace gas and natural gas; Reducing sulphur oxides (SOx) emissions to air. The BAT-AEL emission level is < 200 mg/Nm3.
valid
2019-04-23
2019-04-23
IS-SS-BAT28-I
Iron and Steel Production - SS - BAT28-I
2, Production and processing of metals: 2,1 Metal ore (including sulphide ore) roasting or sintering Reducing suspended solids to water. The BAT-AEL emission level is < 30 mg/l.
valid
2019-04-23
2019-04-23
IS-SS-BAT39-I
Iron and Steel Production - SS - BAT39-I
2, Production and processing of metals: 2,1 Metal ore (including sulphide ore) roasting or sintering Reducing suspended solids to water. The BAT-AEL emission level is < 50 mg/l.
valid
2019-04-23
2019-04-23
IS-SS-BAT67-I
Iron and Steel Production - SS - BAT67-I
2, Production and processing of metals: 2,2 Production of pig iron or steel (primary or secondary fusion) including continuous casting, with a capacity exceeding 2,5 tonnes per hour Reducing suspended solids to water. The BAT-AEL emission level is < 30 mg/l.
valid
2019-04-23
2019-04-23
IS-SS-BAT81-I
Iron and Steel Production - SS - BAT81-I
2, Production and processing of metals: 2,2 Production of pig iron or steel (primary or secondary fusion) including continuous casting, with a capacity exceeding 2,5 tonnes per hour Reducing suspended solids to water. The BAT-AEL emission level is < 20 mg/l.
valid
2019-04-23
2019-04-23
IS-SS-BAT92-I
Iron and Steel Production - SS - BAT92-I
2, Production and processing of metals: 2,2 Production of pig iron or steel (primary or secondary fusion) including continuous casting, with a capacity exceeding 2,5 tonnes per hour Reducing suspended solids to water. The BAT-AEL emission level is < 20 mg/l.
valid
2019-04-23
2019-04-23
IS-THC-BAT81-VI
Iron and Steel Production - THC - BAT81-VI
2, Production and processing of metals: 2,2 Production of pig iron or steel (primary or secondary fusion) including continuous casting, with a capacity exceeding 2,5 tonnes per hour Reducing total hydrocarbons to water. The BAT-AEL emission level is < 5 mg/l.
valid
2019-04-23
2019-04-23
IS-THC-BAT92-VI
Iron and Steel Production - THC - BAT92-VI
2, Production and processing of metals: 2,2 Production of pig iron or steel (primary or secondary fusion) including continuous casting, with a capacity exceeding 2,5 tonnes per hour Reducing total hydrocarbons to water. The BAT-AEL emission level is < 5 mg/l.
valid
2019-04-23
2019-04-23
IS-TKN-BAT39-III
Iron and Steel Production - TKN - BAT39-III
2, Production and processing of metals: 2,1 Metal ore (including sulphide ore) roasting or sintering Reducing kjeldahl nitrogen to water. The BAT-AEL emission level is < 45 mg/l.
valid
2019-04-23
2019-04-23
IS-TN-BAT56-VIII
Iron and Steel Production - TN - BAT56-VIII
1, Energy industries undertaking activities related to 2.2: 1,3 Production of coke Reducing sum of ammonia-nitrogen (NH4+ - N), nitrate-nitrogen (NO3- - N) and nitrite-nitrogen (NO2- - N) to water. The BAT-AEL emission level is < 15 - 50 mg/l.
valid
2019-04-23
2019-04-23
IS-Zn-BAT67-IV
Iron and Steel Production - Zn - BAT67-IV
2, Production and processing of metals: 2,2 Production of pig iron or steel (primary or secondary fusion) including continuous casting, with a capacity exceeding 2,5 tonnes per hour Reducing zinc to water. The BAT-AEL emission level is < 2 mg/l.
valid
2019-04-23
2019-04-23
IS-Zn-BAT81-III
Iron and Steel Production - Zn - BAT81-III
2, Production and processing of metals: 2,2 Production of pig iron or steel (primary or secondary fusion) including continuous casting, with a capacity exceeding 2,5 tonnes per hour Reducing zinc to water. The BAT-AEL emission level is < 2 mg/l.
valid
2019-04-23
2019-04-23
IS-Zn-BAT92-III
Iron and Steel Production - Zn - BAT92-III
2, Production and processing of metals: 2,2 Production of pig iron or steel (primary or secondary fusion) including continuous casting, with a capacity exceeding 2,5 tonnes per hour Reducing zinc to water. The BAT-AEL emission level is < 2 mg/l.
valid
2019-04-23
2019-04-23
LCP-As-BAT15-VIII
Large combustion plants - As - BAT15-VIII
1. Energy industries; 5. Waste management: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; 1.4, Gasification of coal or other fuels in installations with a total rated thermal input of 20 MW or more, only when this activity is directly associated to a combustion plant; 5.2, Disposal or recovery of waste in waste co-incineration plants for non-hazardous waste with a capacity exceeding 3 tonnes per hour or for hazardous waste with a capacity exceeding 10 tonnes per day, only when this activity takes place in combustion plants covered under 1.1 above. Reducing arsenic to water. The BAT-AEL emission level is 10–50 µg/l .
valid
2019-04-23
2019-04-23
LCP-CH4-BAT45-II
Large combustion plants - CH4 - BAT45-II
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Ensure optimised combustion and/or to use oxidation catalysts for Existing plant; Reducing methane emissions to air. The BAT-AEL emission level is 215–560 mg/Nm3.
valid
2019-04-23
2019-04-23
LCP-CH4-BAT45-III
Large combustion plants - CH4 - BAT45-III
#N/A
valid
2019-04-23
2019-04-23
LCP-COD-BAT15-II
Large combustion plants - COD - BAT15-II
1. Energy industries; 5. Waste management: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; 1.4, Gasification of coal or other fuels in installations with a total rated thermal input of 20 MW or more, only when this activity is directly associated to a combustion plant; 5.2, Disposal or recovery of waste in waste co-incineration plants for non-hazardous waste with a capacity exceeding 3 tonnes per hour or for hazardous waste with a capacity exceeding 10 tonnes per day, only when this activity takes place in combustion plants covered under 1.1 above. Reducing chemical oxygen demand (COD) to water. The BAT-AEL emission level is 60–150 mg/l .
valid
2019-04-23
2019-04-23
LCP-Dust-BAT22-I
Large combustion plants - Dust - BAT22-I
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Techniques (a)-(e) (see table) for New plant; Reducing dust emissions to air. The BAT-AEL emission level is 2–5 mg/Nm3.
valid
2019-04-23
2019-04-23
LCP-Dust-BAT22-II
Large combustion plants - Dust - BAT22-II
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Techniques (a)-(e) (see table) for Existing plant; Reducing dust emissions to air. The BAT-AEL emission level is 2–18 mg/Nm3.
valid
2019-04-23
2019-04-23
LCP-Dust-BAT22-III
Large combustion plants - Dust - BAT22-III
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Techniques (a)-(e) (see table) for New plant; Reducing dust emissions to air. The BAT-AEL emission level is 4–16 mg/Nm3.
valid
2019-04-23
2019-04-23
LCP-Dust-BAT22-IV
Large combustion plants - Dust - BAT22-IV
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Techniques (a)-(e) (see table) for Existing plant; Reducing dust emissions to air. The BAT-AEL emission level is 4–22 mg/Nm3.
valid
2019-04-23
2019-04-23
LCP-Cd-BAT15-IX
Large combustion plants - Cd - BAT15-IX
1. Energy industries; 5. Waste management: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; 1.4, Gasification of coal or other fuels in installations with a total rated thermal input of 20 MW or more, only when this activity is directly associated to a combustion plant; 5.2, Disposal or recovery of waste in waste co-incineration plants for non-hazardous waste with a capacity exceeding 3 tonnes per hour or for hazardous waste with a capacity exceeding 10 tonnes per day, only when this activity takes place in combustion plants covered under 1.1 above. Reducing cadmium to water. The BAT-AEL emission level is 2–5 µg/l .
valid
2019-04-23
2019-04-23
LCP-Cr-BAT15-X
Large combustion plants - Cr - BAT15-X
1. Energy industries; 5. Waste management: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; 1.4, Gasification of coal or other fuels in installations with a total rated thermal input of 20 MW or more, only when this activity is directly associated to a combustion plant; 5.2, Disposal or recovery of waste in waste co-incineration plants for non-hazardous waste with a capacity exceeding 3 tonnes per hour or for hazardous waste with a capacity exceeding 10 tonnes per day, only when this activity takes place in combustion plants covered under 1.1 above. Reducing chromium to water. The BAT-AEL emission level is 10–50 µg/l .
valid
2019-04-23
2019-04-23
LCP-Cu-BAT15-XI
Large combustion plants - Cu - BAT15-XI
1. Energy industries; 5. Waste management: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; 1.4, Gasification of coal or other fuels in installations with a total rated thermal input of 20 MW or more, only when this activity is directly associated to a combustion plant; 5.2, Disposal or recovery of waste in waste co-incineration plants for non-hazardous waste with a capacity exceeding 3 tonnes per hour or for hazardous waste with a capacity exceeding 10 tonnes per day, only when this activity takes place in combustion plants covered under 1.1 above. Reducing copper to water. The BAT-AEL emission level is 10–50 µg/l .
valid
2019-04-23
2019-04-23
LCP-Dust-BAT22-IX
Large combustion plants - Dust - BAT22-IX
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Techniques (a)-(e) (see table) for New plant; Reducing dust emissions to air. The BAT-AEL emission level is 2–5 mg/Nm3.
valid
2019-04-23
2019-04-23
LCP-Dust-BAT22-V
Large combustion plants - Dust - BAT22-V
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Techniques (a)-(e) (see table) for New plant; Reducing dust emissions to air. The BAT-AEL emission level is 2–5 mg/Nm3.
valid
2019-04-23
2019-04-23
LCP-Dust-BAT22-VI
Large combustion plants - Dust - BAT22-VI
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Techniques (a)-(e) (see table) for Existing plant; Reducing dust emissions to air. The BAT-AEL emission level is 2–14 mg/Nm3.
valid
2019-04-23
2019-04-23
LCP-Dust-BAT22-VII
Large combustion plants - Dust - BAT22-VII
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Techniques (a)-(e) (see table) for New plant; Reducing dust emissions to air. The BAT-AEL emission level is 3–15 mg/Nm3.
valid
2019-04-23
2019-04-23
LCP-Dust-BAT22-VIII
Large combustion plants - Dust - BAT22-VIII
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Techniques (a)-(e) (see table) for Existing plant; Reducing dust emissions to air. The BAT-AEL emission level is 4–22 mg/Nm3.
valid
2019-04-23
2019-04-23
LCP-Dust-BAT22-X
Large combustion plants - Dust - BAT22-X
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Techniques (a)-(e) (see table) for Existing plant; Reducing dust emissions to air. The BAT-AEL emission level is 2–10 mg/Nm3.
valid
2019-04-23
2019-04-23
LCP-Dust-BAT22-XI
Large combustion plants - Dust - BAT22-XI
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Techniques (a)-(e) (see table) for New plant; Reducing dust emissions to air. The BAT-AEL emission level is 3–15 mg/Nm3.
valid
2019-04-23
2019-04-23
LCP-Dust-BAT22-XII
Large combustion plants - Dust - BAT22-XII
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Techniques (a)-(e) (see table) for Existing plant; Reducing dust emissions to air. The BAT-AEL emission level is 4–22 mg/Nm3.
valid
2019-04-23
2019-04-23
LCP-Dust-BAT22-XIII
Large combustion plants - Dust - BAT22-XIII
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Techniques (a)-(e) (see table) for New plant; Reducing dust emissions to air. The BAT-AEL emission level is 2–5 mg/Nm3.
valid
2019-04-23
2019-04-23
LCP-Dust-BAT22-XIV
Large combustion plants - Dust - BAT22-XIV
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Techniques (a)-(e) (see table) for Existing plant; Reducing dust emissions to air. The BAT-AEL emission level is 2–8 mg/Nm3.
valid
2019-04-23
2019-04-23
LCP-Dust-BAT22-XV
Large combustion plants - Dust - BAT22-XV
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Techniques (a)-(e) (see table) for New plant; Reducing dust emissions to air. The BAT-AEL emission level is 3–10 mg/Nm3.
valid
2019-04-23
2019-04-23
LCP-Dust-BAT22-XVI
Large combustion plants - Dust - BAT22-XVI
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Techniques (a)-(e) (see table) for Existing plant; Reducing dust emissions to air. The BAT-AEL emission level is 3–11 mg/Nm3.
valid
2019-04-23
2019-04-23
LCP-Dust-BAT26-I
Large combustion plants - Dust - BAT26-I
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Techniques (a)-(e) (see table) for New plant; Reducing dust emissions to air. The BAT-AEL emission level is 2–5 mg/Nm3.
valid
2019-04-23
2019-04-23
LCP-Dust-BAT26-II
Large combustion plants - Dust - BAT26-II
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Techniques (a)-(e) (see table) for Existing plant; Reducing dust emissions to air. The BAT-AEL emission level is 2–15 mg/Nm3.
valid
2019-04-23
2019-04-23
LCP-Dust-BAT26-III
Large combustion plants - Dust - BAT26-III
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Techniques (a)-(e) (see table) for New plant; Reducing dust emissions to air. The BAT-AEL emission level is 2–10 mg/Nm3.
valid
2019-04-23
2019-04-23
LCP-Dust-BAT26-IV
Large combustion plants - Dust - BAT26-IV
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Techniques (a)-(e) (see table) for Existing plant; Reducing dust emissions to air. The BAT-AEL emission level is 2–22 mg/Nm3.
valid
2019-04-23
2019-04-23
LCP-Dust-BAT26-IX
Large combustion plants - Dust - BAT26-IX
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Techniques (a)-(e) (see table) for New plant; Reducing dust emissions to air. The BAT-AEL emission level is 2–5 mg/Nm3.
valid
2019-04-23
2019-04-23
LCP-Dust-BAT26-V
Large combustion plants - Dust - BAT26-V
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Techniques (a)-(e) (see table) for New plant; Reducing dust emissions to air. The BAT-AEL emission level is 2–5 mg/Nm3.
valid
2019-04-23
2019-04-23
LCP-Dust-BAT26-VI
Large combustion plants - Dust - BAT26-VI
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Techniques (a)-(e) (see table) for Existing plant; Reducing dust emissions to air. The BAT-AEL emission level is 2–12 mg/Nm3.
valid
2019-04-23
2019-04-23
LCP-Dust-BAT26-VII
Large combustion plants - Dust - BAT26-VII
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Techniques (a)-(e) (see table) for New plant; Reducing dust emissions to air. The BAT-AEL emission level is 2–10 mg/Nm3.
valid
2019-04-23
2019-04-23
LCP-Dust-BAT26-VIII
Large combustion plants - Dust - BAT26-VIII
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Techniques (a)-(e) (see table) for Existing plant; Reducing dust emissions to air. The BAT-AEL emission level is 2–18 mg/Nm3.
valid
2019-04-23
2019-04-23
LCP-Dust-BAT26-X
Large combustion plants - Dust - BAT26-X
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Techniques (a)-(e) (see table) for Existing plant; Reducing dust emissions to air. The BAT-AEL emission level is 2–10 mg/Nm3.
valid
2019-04-23
2019-04-23
LCP-Dust-BAT26-XI
Large combustion plants - Dust - BAT26-XI
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Techniques (a)-(e) (see table) for New plant; Reducing dust emissions to air. The BAT-AEL emission level is 2–10 mg/Nm3.
valid
2019-04-23
2019-04-23
LCP-Dust-BAT26-XII
Large combustion plants - Dust - BAT26-XII
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Techniques (a)-(e) (see table) for Existing plant; Reducing dust emissions to air. The BAT-AEL emission level is 2–16 mg/Nm3.
valid
2019-04-23
2019-04-23
LCP-Dust-BAT30-I
Large combustion plants - Dust - BAT30-I
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Techniques (a)-(f) (see table) for New plant; Reducing dust emissions to air. The BAT-AEL emission level is 2–10 mg/Nm3.
valid
2019-04-23
2019-04-23
LCP-Dust-BAT30-II
Large combustion plants - Dust - BAT30-II
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Techniques (a)-(f) (see table) for Existing plant; Reducing dust emissions to air. The BAT-AEL emission level is 2–20 mg/Nm3.
valid
2019-04-23
2019-04-23
LCP-Dust-BAT30-III
Large combustion plants - Dust - BAT30-III
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Techniques (a)-(f) (see table) for New plant; Reducing dust emissions to air. The BAT-AEL emission level is 7–18 mg/Nm3.
valid
2019-04-23
2019-04-23
LCP-Dust-BAT30-IV
Large combustion plants - Dust - BAT30-IV
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Techniques (a)-(f) (see table) for Existing plant; Reducing dust emissions to air. The BAT-AEL emission level is 7–22 mg/Nm3.
valid
2019-04-23
2019-04-23
LCP-Dust-BAT30-V
Large combustion plants - Dust - BAT30-V
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Techniques (a)-(f) (see table) for New plant; Reducing dust emissions to air. The BAT-AEL emission level is 2–5 mg/Nm3.
valid
2019-04-23
2019-04-23
LCP-Dust-BAT30-VI
Large combustion plants - Dust - BAT30-VI
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Techniques (a)-(f) (see table) for Existing plant; Reducing dust emissions to air. The BAT-AEL emission level is 2–10 mg/Nm3.
valid
2019-04-23
2019-04-23
LCP-Dust-BAT30-VII
Large combustion plants - Dust - BAT30-VII
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Techniques (a)-(f) (see table) for New plant; Reducing dust emissions to air. The BAT-AEL emission level is 7–10 mg/Nm3.
valid
2019-04-23
2019-04-23
LCP-Dust-BAT30-VIII
Large combustion plants - Dust - BAT30-VIII
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Techniques (a)-(f) (see table) for Existing plant; Reducing dust emissions to air. The BAT-AEL emission level is 7–11 mg/Nm3.
valid
2019-04-23
2019-04-23
LCP-Dust-BAT35-I
Large combustion plants - Dust - BAT35-I
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Techniques (a)-(c) (see table) for New plant; Reducing dust emissions to air. The BAT-AEL emission level is 5–10 mg/Nm3.
valid
2019-04-23
2019-04-23
LCP-Dust-BAT35-II
Large combustion plants - Dust - BAT35-II
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Techniques (a)-(c) (see table) for Existing plant; Reducing dust emissions to air. The BAT-AEL emission level is 5–35 mg/Nm3.
valid
2019-04-23
2019-04-23
LCP-Dust-BAT35-III
Large combustion plants - Dust - BAT35-III
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Techniques (a)-(c) (see table) for New plant; Reducing dust emissions to air. The BAT-AEL emission level is 10–20 mg/Nm3.
valid
2019-04-23
2019-04-23
LCP-Dust-BAT35-IV
Large combustion plants - Dust - BAT35-IV
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Techniques (a)-(c) (see table) for Existing plant; Reducing dust emissions to air. The BAT-AEL emission level is 10–45 mg/Nm3.
valid
2019-04-23
2019-04-23
LCP-Dust-BAT39-III
Large combustion plants - Dust - BAT39-III
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Technique (a) (see table) for new and existing plants; Reducing dust emissions to air. The BAT-AEL emission level is 2–5 mg/Nm3.
valid
2019-04-23
2019-04-23
LCP-Dust-BAT39-IV
Large combustion plants - Dust - BAT39-IV
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Technique (a) (see table) for new and existing plants; Reducing dust emissions to air. The BAT-AEL emission level is 2–10 mg/Nm3.
valid
2019-04-23
2019-04-23
LCP-Dust-BAT51-I
Large combustion plants - Dust - BAT51-I
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Techniques (a)-(e) (see table) in boilers; Reducing dust emissions to air. The BAT-AEL emission level is 2–7 mg/Nm3.
valid
2019-04-23
2019-04-23
LCP-Dust-BAT51-II
Large combustion plants - Dust - BAT51-II
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Techniques (a)-(e) (see table) in boilers; Reducing dust emissions to air. The BAT-AEL emission level is 2–10 mg/Nm3.
valid
2019-04-23
2019-04-23
LCP-Dust-BAT51-III
Large combustion plants - Dust - BAT51-III
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Techniques (a)-(e) (see table) in combined-cycle gas turbines (CCGTs); Reducing dust emissions to air. The BAT-AEL emission level is 2–5 mg/Nm3.
valid
2019-04-23
2019-04-23
LCP-Dust-BAT51-IV
Large combustion plants - Dust - BAT51-IV
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Techniques (a)-(e) (see table) in combined-cycle gas turbines (CCGTs); Reducing dust emissions to air. The BAT-AEL emission level is 2–5 mg/Nm3.
valid
2019-04-23
2019-04-23
LCP-Dust-BAT58-I
Large combustion plants - Dust - BAT58-I
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Techniques (a)-(e) (see table). for New plant; Reducing dust emissions to air. The BAT-AEL emission level is 2–5 mg/Nm3.
valid
2019-04-23
2019-04-23
LCP-Dust-BAT58-II
Large combustion plants - Dust - BAT58-II
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Techniques (a)-(e) (see table). for Existing plant; Reducing dust emissions to air. The BAT-AEL emission level is 2–15 mg/Nm3.
valid
2019-04-23
2019-04-23
LCP-Dust-BAT58-III
Large combustion plants - Dust - BAT58-III
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Techniques (a)-(e) (see table). for New plant; Reducing dust emissions to air. The BAT-AEL emission level is 2–10 mg/Nm3.
valid
2019-04-23
2019-04-23
LCP-Dust-BAT58-IV
Large combustion plants - Dust - BAT58-IV
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Techniques (a)-(e) (see table). for Existing plant; Reducing dust emissions to air. The BAT-AEL emission level is 2–22 mg/Nm3.
valid
2019-04-23
2019-04-23
LCP-Dust-BAT58-V
Large combustion plants - Dust - BAT58-V
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Techniques (a)-(e) (see table). for New plant; Reducing dust emissions to air. The BAT-AEL emission level is 2–5 mg/Nm3.
valid
2019-04-23
2019-04-23
LCP-Dust-BAT58-VI
Large combustion plants - Dust - BAT58-VI
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Techniques (a)-(e) (see table). for Existing plant; Reducing dust emissions to air. The BAT-AEL emission level is 2–10 mg/Nm3.
valid
2019-04-23
2019-04-23
LCP-Dust-BAT58-VII
Large combustion plants - Dust - BAT58-VII
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Techniques (a)-(e) (see table). for New plant; Reducing dust emissions to air. The BAT-AEL emission level is 2–10 mg/Nm3.
valid
2019-04-23
2019-04-23
LCP-Dust-BAT58-VIII
Large combustion plants - Dust - BAT58-VIII
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Techniques (a)-(e) (see table). for Existing plant; Reducing dust emissions to air. The BAT-AEL emission level is 2–11 mg/Nm3.
valid
2019-04-23
2019-04-23
LCP-Dust-BAT75-III
Large combustion plants - Dust - BAT75-III
1. Energy industries: 1.4, Gasification of coal or other fuels in installations with a total rated thermal input of 20 MW or more, only when this activity is directly associated to a combustion plant; Techniques (a)-(c) (see table); Reducing dust emissions to air. The BAT-AEL emission level is < 2,5 mg/Nm3.
valid
2019-04-23
2019-04-23
LCP-F-BAT15-IV
Large combustion plants - F - BAT15-IV
1. Energy industries; 5. Waste management: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; 1.4, Gasification of coal or other fuels in installations with a total rated thermal input of 20 MW or more, only when this activity is directly associated to a combustion plant; 5.2, Disposal or recovery of waste in waste co-incineration plants for non-hazardous waste with a capacity exceeding 3 tonnes per hour or for hazardous waste with a capacity exceeding 10 tonnes per day, only when this activity takes place in combustion plants covered under 1.1 above. Reducing fluorides to water. The BAT-AEL emission level is 10–25 mg/l.
valid
2019-04-23
2019-04-23
LCP-Formaldehyde-BAT45-I
Large combustion plants - Formaldehyde - BAT45-I
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Ensure optimised combustion and/or to use oxidation catalysts for New or existing plan; Reducing formaldehyde emissions to air. The BAT-AEL emission level is 5–15 mg/Nm3.
valid
2019-04-23
2019-04-23
LCP-HCl-BAT21-XIX
Large combustion plants - HCl - BAT21-XIX
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Techniques (a)-(j) (see table) for New plant; Reducing hydrogen chloride emissions to air. The BAT-AEL emission level is 1–3 mg/Nm3.
valid
2019-04-23
2019-04-23
LCP-HCl-BAT21-XVII
Large combustion plants - HCl - BAT21-XVII
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Techniques (a)-(j) (see table) for New plant; Reducing hydrogen chloride emissions to air. The BAT-AEL emission level is 1–6 mg/Nm3.
valid
2019-04-23
2019-04-23
LCP-HCl-BAT21-XVIII
Large combustion plants - HCl - BAT21-XVIII
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Techniques (a)-(j) (see table) for Existing plant; Reducing hydrogen chloride emissions to air. The BAT-AEL emission level is 2–10 mg/Nm3.
valid
2019-04-23
2019-04-23
LCP-HCl-BAT21-XX
Large combustion plants - HCl - BAT21-XX
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Techniques (a)-(j) (see table) for Existing plant; Reducing hydrogen chloride emissions to air. The BAT-AEL emission level is 1–5 mg/Nm3.
valid
2019-04-23
2019-04-23
LCP-HCl-BAT25-XIII
Large combustion plants - HCl - BAT25-XIII
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Techniques (a)-(h) (see table) for New plant; Reducing hydrogen chloride emissions to air. The BAT-AEL emission level is 1–7 mg/Nm3.
valid
2019-04-23
2019-04-23
LCP-HCl-BAT25-XIV
Large combustion plants - HCl - BAT25-XIV
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Techniques (a)-(h) (see table) for Existing plant; Reducing hydrogen chloride emissions to air. The BAT-AEL emission level is 1–15 mg/Nm3.
valid
2019-04-23
2019-04-23
LCP-HCl-BAT25-XIX
Large combustion plants - HCl - BAT25-XIX
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Techniques (a)-(h) (see table) for New plant; Reducing hydrogen chloride emissions to air. The BAT-AEL emission level is 1–12 mg/Nm3.
valid
2019-04-23
2019-04-23
LCP-HCl-BAT25-XV
Large combustion plants - HCl - BAT25-XV
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Techniques (a)-(h) (see table) for New plant; Reducing hydrogen chloride emissions to air. The BAT-AEL emission level is 1–12 mg/Nm3.
valid
2019-04-23
2019-04-23
LCP-HCl-BAT25-XVI
Large combustion plants - HCl - BAT25-XVI
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Techniques (a)-(h) (see table) for Existing plant; Reducing hydrogen chloride emissions to air. The BAT-AEL emission level is 1–35 mg/Nm3.
valid
2019-04-23
2019-04-23
LCP-HCl-BAT25-XVII
Large combustion plants - HCl - BAT25-XVII
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Techniques (a)-(h) (see table) for New plant; Reducing hydrogen chloride emissions to air. The BAT-AEL emission level is 1–5 mg/Nm3.
valid
2019-04-23
2019-04-23
LCP-HCl-BAT25-XVIII
Large combustion plants - HCl - BAT25-XVIII
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Techniques (a)-(h) (see table) for Existing plant; Reducing hydrogen chloride emissions to air. The BAT-AEL emission level is 1–9 mg/Nm3.
valid
2019-04-23
2019-04-23
LCP-HCl-BAT25-XX
Large combustion plants - HCl - BAT25-XX
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Techniques (a)-(h) (see table) for Existing plant; Reducing hydrogen chloride emissions to air. The BAT-AEL emission level is 1–12 mg/Nm3.
valid
2019-04-23
2019-04-23
LCP-HCl-BAT25-XXI
Large combustion plants - HCl - BAT25-XXI
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Techniques (a)-(h) (see table) for New plant; Reducing hydrogen chloride emissions to air. The BAT-AEL emission level is 1–5 mg/Nm3.
valid
2019-04-23
2019-04-23
LCP-HCl-BAT25-XXII
Large combustion plants - HCl - BAT25-XXII
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Techniques (a)-(h) (see table) for Existing plant; Reducing hydrogen chloride emissions to air. The BAT-AEL emission level is 1–5 mg/Nm3.
valid
2019-04-23
2019-04-23
LCP-HCl-BAT25-XXIII
Large combustion plants - HCl - BAT25-XXIII
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Techniques (a)-(h) (see table) for New plant; Reducing hydrogen chloride emissions to air. The BAT-AEL emission level is 1–12 mg/Nm3.
valid
2019-04-23
2019-04-23
LCP-HCl-BAT25-XXIV
Large combustion plants - HCl - BAT25-XXIV
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Techniques (a)-(h) (see table) for Existing plant; Reducing hydrogen chloride emissions to air. The BAT-AEL emission level is 1–12 mg/Nm3.
valid
2019-04-23
2019-04-23
LCP-HCl-BAT57-III
Large combustion plants - HCl - BAT57-III
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Techniques (a)-(g) (see table). for New plant; Reducing hydrogen chloride emissions to air. The BAT-AEL emission level is 1–7 mg/Nm3.
valid
2019-04-23
2019-04-23
LCP-HCl-BAT57-IV
Large combustion plants - HCl - BAT57-IV
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Techniques (a)-(g) (see table). for Existing plant; Reducing hydrogen chloride emissions to air. The BAT-AEL emission level is 2–15 mg/Nm3.
valid
2019-04-23
2019-04-23
LCP-HCl-BAT57-VII
Large combustion plants - HCl - BAT57-VII
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Techniques (a)-(g) (see table). for New plant; Reducing hydrogen chloride emissions to air. The BAT-AEL emission level is 1–5 mg/Nm3.
valid
2019-04-23
2019-04-23
LCP-HCl-BAT57-VIII
Large combustion plants - HCl - BAT57-VIII
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Techniques (a)-(g) (see table). for Existing plant; Reducing hydrogen chloride emissions to air. The BAT-AEL emission level is 1–9 mg/Nm3.
valid
2019-04-23
2019-04-23
LCP-HF-BAT21-XXI
Large combustion plants - HF - BAT21-XXI
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Techniques (a)-(j) (see table) for New plant; Reducing hydrogen fluoride emissions to air. The BAT-AEL emission level is < 1–3 mg/Nm3.
valid
2019-04-23
2019-04-23
LCP-HF-BAT21-XXII
Large combustion plants - HF - BAT21-XXII
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Techniques (a)-(j) (see table) for Existing plant; Reducing hydrogen fluoride emissions to air. The BAT-AEL emission level is < 1–6 mg/Nm3.
valid
2019-04-23
2019-04-23
LCP-HF-BAT21-XXIII
Large combustion plants - HF - BAT21-XXIII
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Techniques (a)-(j) (see table) for New plant; Reducing hydrogen fluoride emissions to air. The BAT-AEL emission level is < 1–2 mg/Nm3.
valid
2019-04-23
2019-04-23
LCP-HF-BAT21-XXIV
Large combustion plants - HF - BAT21-XXIV
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Techniques (a)-(j) (see table) for Existing plant; Reducing hydrogen fluoride emissions to air. The BAT-AEL emission level is < 1–3 mg/Nm3.
valid
2019-04-23
2019-04-23
LCP-HF-BAT25-XXIX
Large combustion plants - HF - BAT25-XXIX
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Techniques (a)-(h) (see table) for New plant; Reducing hydrogen fluoride emissions to air. The BAT-AEL emission level is < 1 mg/Nm3.
valid
2019-04-23
2019-04-23
LCP-HF-BAT25-XXV
Large combustion plants - HF - BAT25-XXV
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Techniques (a)-(h) (see table) for New plant; Reducing hydrogen fluoride emissions to air. The BAT-AEL emission level is < 1 mg/Nm3.
valid
2019-04-23
2019-04-23
LCP-HF-BAT25-XXVI
Large combustion plants - HF - BAT25-XXVI
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Techniques (a)-(h) (see table) for Existing plant; Reducing hydrogen fluoride emissions to air. The BAT-AEL emission level is < 1,5 mg/Nm3.
valid
2019-04-23
2019-04-23
LCP-HF-BAT25-XXVII
Large combustion plants - HF - BAT25-XXVII
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Techniques (a)-(h) (see table) for New plant; Reducing hydrogen fluoride emissions to air. The BAT-AEL emission level is < 1 mg/Nm3.
valid
2019-04-23
2019-04-23
LCP-HF-BAT25-XXVIII
Large combustion plants - HF - BAT25-XXVIII
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Techniques (a)-(h) (see table) for Existing plant; Reducing hydrogen fluoride emissions to air. The BAT-AEL emission level is < 1 mg/Nm3.
valid
2019-04-23
2019-04-23
LCP-HF-BAT25-XXX
Large combustion plants - HF - BAT25-XXX
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Techniques (a)-(h) (see table) for Existing plant; Reducing hydrogen fluoride emissions to air. The BAT-AEL emission level is < 1 mg/Nm3.
valid
2019-04-23
2019-04-23
LCP-HF-BAT57-IX
Large combustion plants - HF - BAT57-IX
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Techniques (a)-(g) (see table). for New plant; Reducing hydrogen fluoride emissions to air. The BAT-AEL emission level is < 1–2 mg/Nm3.
valid
2019-04-23
2019-04-23
LCP-HF-BAT57-V
Large combustion plants - HF - BAT57-V
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Techniques (a)-(g) (see table). for New plant; Reducing hydrogen fluoride emissions to air. The BAT-AEL emission level is < 1–3 mg/Nm3.
valid
2019-04-23
2019-04-23
LCP-HF-BAT57-VI
Large combustion plants - HF - BAT57-VI
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Techniques (a)-(g) (see table). for Existing plant; Reducing hydrogen fluoride emissions to air. The BAT-AEL emission level is < 1–6 mg/Nm3.
valid
2019-04-23
2019-04-23
LCP-HF-BAT57-X
Large combustion plants - HF - BAT57-X
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Techniques (a)-(g) (see table). for Existing plant; Reducing hydrogen fluoride emissions to air. The BAT-AEL emission level is < 1–3 mg/Nm3.
valid
2019-04-23
2019-04-23
LCP-Hg-BAT23-I
Large combustion plants - Hg - BAT23-I
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Techniques (a)-(i) (see table) for New plant; Reducing mercury emissions to air. The BAT-AEL emission level is < 1–3 µg/Nm3.
valid
2019-04-23
2019-04-23
LCP-Hg-BAT23-II
Large combustion plants - Hg - BAT23-II
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Techniques (a)-(i) (see table) for New plant; Reducing mercury emissions to air. The BAT-AEL emission level is < 1–5 µg/Nm3.
valid
2019-04-23
2019-04-23
LCP-Hg-BAT23-III
Large combustion plants - Hg - BAT23-III
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Techniques (a)-(i) (see table) for Existing plant; Reducing mercury emissions to air. The BAT-AEL emission level is < 1–9 µg/Nm3.
valid
2019-04-23
2019-04-23
LCP-Hg-BAT15-XII
Large combustion plants - Hg - BAT15-XII
1. Energy industries; 5. Waste management: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; 1.4, Gasification of coal or other fuels in installations with a total rated thermal input of 20 MW or more, only when this activity is directly associated to a combustion plant; 5.2, Disposal or recovery of waste in waste co-incineration plants for non-hazardous waste with a capacity exceeding 3 tonnes per hour or for hazardous waste with a capacity exceeding 10 tonnes per day, only when this activity takes place in combustion plants covered under 1.1 above. Reducing mercury to water. The BAT-AEL emission level is 0,2–3 µg/l .
valid
2019-04-23
2019-04-23
LCP-Hg-BAT23-IV
Large combustion plants - Hg - BAT23-IV
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Techniques (a)-(i) (see table) for Existing plant; Reducing mercury emissions to air. The BAT-AEL emission level is < 1–10 µg/Nm3.
valid
2019-04-23
2019-04-23
LCP-Hg-BAT23-V
Large combustion plants - Hg - BAT23-V
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Techniques (a)-(i) (see table) for New plant; Reducing mercury emissions to air. The BAT-AEL emission level is < 1–2 µg/Nm3.
valid
2019-04-23
2019-04-23
LCP-Hg-BAT23-VI
Large combustion plants - Hg - BAT23-VI
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Techniques (a)-(i) (see table) for New plant; Reducing mercury emissions to air. The BAT-AEL emission level is < 1–4 µg/Nm3.
valid
2019-04-23
2019-04-23
LCP-Hg-BAT23-VII
Large combustion plants - Hg - BAT23-VII
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Techniques (a)-(i) (see table) for Existing plant; Reducing mercury emissions to air. The BAT-AEL emission level is < 1–4 µg/Nm3.
valid
2019-04-23
2019-04-23
LCP-Hg-BAT23-VIII
Large combustion plants - Hg - BAT23-VIII
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Techniques (a)-(i) (see table) for Existing plant; Reducing mercury emissions to air. The BAT-AEL emission level is < 1–7 µg/Nm3.
valid
2019-04-23
2019-04-23
LCP-Hg-BAT27
Large combustion plants - Hg - BAT27
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Techniques (a)-(g) (see table); Reducing mercury emissions to air. The BAT-AEL emission level is < 1–5 µg/Nm3 .
valid
2019-04-23
2019-04-23
LCP-Hg-BAT75-II
Large combustion plants - Hg - BAT75-II
1. Energy industries: 1.4, Gasification of coal or other fuels in installations with a total rated thermal input of 20 MW or more, only when this activity is directly associated to a combustion plant; Techniques (a)-(c) (see table); Reducing particulate-bound mercury emissions to air. The BAT-AEL emission level is < 1 µg/Nm3.
valid
2019-04-23
2019-04-23
LCP-Metals-BAT68-I
Large combustion plants - Metals - BAT68-I
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Use one or a combination of the techniques given in BAT 22; Reducing metals emissions to air. The BAT-AEL emission level is 0,005–0,5 mg/Nm3 .
valid
2019-04-23
2019-04-23
LCP-Metals-BAT68-II
Large combustion plants - Metals - BAT68-II
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Use one or a combination of the techniques given in BAT 22; Reducing metals emissions to air. The BAT-AEL emission level is 5–12 µg/Nm3.
valid
2019-04-23
2019-04-23
LCP-Metals-BAT68-III
Large combustion plants - Metals - BAT68-III
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Use one or a combination of the techniques given in BAT 22; Reducing metals emissions to air. The BAT-AEL emission level is 0,005–0,2 mg/Nm3 .
valid
2019-04-23
2019-04-23
LCP-Metals-BAT68-IV
Large combustion plants - Metals - BAT68-IV
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Use one or a combination of the techniques given in BAT 22; Reducing metals emissions to air. The BAT-AEL emission level is 5–6 µg/Nm3.
valid
2019-04-23
2019-04-23
LCP-Metals-BAT69-I
Large combustion plants - Metals - BAT69-I
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Use one or a combination of the techniques given in BAT 26; Reducing metals emissions to air. The BAT-AEL emission level is 0,075–0,3 mg/Nm3.
valid
2019-04-23
2019-04-23
LCP-Metals-BAT69-II
Large combustion plants - Metals - BAT69-II
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Use one or a combination of the techniques given in BAT 26; Reducing metals emissions to air. The BAT-AEL emission level is < 5 µg/Nm3.
valid
2019-04-23
2019-04-23
LCP-Metals-BAT75-I
Large combustion plants - Metals - BAT75-I
1. Energy industries: 1.4, Gasification of coal or other fuels in installations with a total rated thermal input of 20 MW or more, only when this activity is directly associated to a combustion plant; Techniques (a)-(c) (see table); Reducing particulate-bound metals emissions to air. The BAT-AEL emission level is < 0,025 mg/Nm3.
valid
2019-04-23
2019-04-23
LCP-NH3-BAT7
Large combustion plants - NH3 - BAT7
1. Energy industries; 5. Waste management: 1.1Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; 1.4, Gasification of coal or other fuels in installations with a total rated thermal input of 20 MW or more, only when this activity is directly associated to a combustion plant; 5.2, Disposal or recovery of waste in waste co-incineration plants for non-hazardous waste with a capacity exceeding 3 tonnes per hour or for hazardous waste with a capacity exceeding 10 tonnes per day, only when this activity takes place in combustion plants covered under 1.1 above; Optimise the design and/or operation of SCR and/or SNCR; Reducing ammonia emissions to air. The BAT-AEL emission level is < 3–10 mg/Nm3 .
valid
2019-04-23
2019-04-23
LCP-NOx-BAT20-I
Large combustion plants - NOx - BAT20-I
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Techniques (a)-(e) (see table incl. footnote) for New plant; Reducing nitrogen oxides (NOx) emissions to air. The BAT-AEL emission level is 100–150 mg/Nm3.
valid
2019-04-23
2019-04-23
LCP-NOx-BAT20-II
Large combustion plants - NOx - BAT20-II
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Techniques (a)-(e) (see table incl. footnote) for Existing plant; Reducing nitrogen oxides (NOx) emissions to air. The BAT-AEL emission level is 100–270 mg/Nm3.
valid
2019-04-23
2019-04-23
LCP-NOx-BAT20-III
Large combustion plants - NOx - BAT20-III
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Techniques (a)-(e) (see table incl. footnote) for New plant; Reducing nitrogen oxides (NOx) emissions to air. The BAT-AEL emission level is 155–200 mg/Nm3.
valid
2019-04-23
2019-04-23
LCP-NOx-BAT20-IV
Large combustion plants - NOx - BAT20-IV
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Techniques (a)-(e) (see table incl. footnote) for Existing plant; Reducing nitrogen oxides (NOx) emissions to air. The BAT-AEL emission level is 165–330 mg/Nm3 .
valid
2019-04-23
2019-04-23
LCP-NOx-BAT20-IX
Large combustion plants - NOx - BAT20-IX
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Techniques (a)-(e) (see table incl. footnote) in FBC boiler combusting coal and/or lignite and lignite-fired PC boiler. for New plant; Reducing nitrogen oxides (NOx) emissions to air. The BAT-AEL emission level is 50-85 mg/Nm3.
valid
2019-04-23
2019-04-23
LCP-NOx-BAT20-V
Large combustion plants - NOx - BAT20-V
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Techniques (a)-(e) (see table incl. footnote) for New plant; Reducing nitrogen oxides (NOx) emissions to air. The BAT-AEL emission level is 50–100 mg/Nm3.
valid
2019-04-23
2019-04-23
LCP-NOx-BAT20-VI
Large combustion plants - NOx - BAT20-VI
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Techniques (a)-(e) (see table incl. footnote) for Existing plant; Reducing nitrogen oxides (NOx) emissions to air. The BAT-AEL emission level is 100–180 mg/Nm3 .
valid
2019-04-23
2019-04-23
LCP-NOx-BAT20-VII
Large combustion plants - NOx - BAT20-VII
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Techniques (a)-(e) (see table incl. footnote) for New plant; Reducing nitrogen oxides (NOx) emissions to air. The BAT-AEL emission level is 80–130 mg/Nm3 .
valid
2019-04-23
2019-04-23
LCP-NOx-BAT20-VIII
Large combustion plants - NOx - BAT20-VIII
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Techniques (a)-(e) (see table incl. footnote) for Existing plant; Reducing nitrogen oxides (NOx) emissions to air. The BAT-AEL emission level is 155–210 mg/Nm3 .
valid
2019-04-23
2019-04-23
LCP-NOx-BAT20-X
Large combustion plants - NOx - BAT20-X
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Techniques (a)-(e) (see table incl. footnote) in FBC boiler combusting coal and/or lignite and lignite-fired PC boiler. for Existing plant; Reducing nitrogen oxides (NOx) emissions to air. The BAT-AEL emission level is < 85 - 150 mg/Nm3 .
valid
2019-04-23
2019-04-23
LCP-NOx-BAT20-XI
Large combustion plants - NOx - BAT20-XI
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Techniques (a)-(e) (see table incl. footnote) in FBC boiler combusting coal and/or lignite and lignite-fired PC boiler. for New plant; Reducing nitrogen oxides (NOx) emissions to air. The BAT-AEL emission level is 80-125 mg/Nm3.
valid
2019-04-23
2019-04-23
LCP-NOx-BAT20-XII
Large combustion plants - NOx - BAT20-XII
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Techniques (a)-(e) (see table incl. footnote) in FBC boiler combusting coal and/or lignite and lignite-fired PC boiler. for Existing plant; Reducing nitrogen oxides (NOx) emissions to air. The BAT-AEL emission level is 140-165 mg/Nm3 .
valid
2019-04-23
2019-04-23
LCP-NOx-BAT20-XIII
Large combustion plants - NOx - BAT20-XIII
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Techniques (a)-(e) (see table incl. footnote) in coal-fired PC boiler. for New plant; Reducing nitrogen oxides (NOx) emissions to air. The BAT-AEL emission level is 65 – 85 mg/Nm3.
valid
2019-04-23
2019-04-23
LCP-NOx-BAT20-XIV
Large combustion plants - NOx - BAT20-XIV
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Techniques (a)-(e) (see table incl. footnote) in coal-fired PC boiler. for Existing plant; Reducing nitrogen oxides (NOx) emissions to air. The BAT-AEL emission level is 65 – 150 mg/Nm3 .
valid
2019-04-23
2019-04-23
LCP-NOx-BAT20-XV
Large combustion plants - NOx - BAT20-XV
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Techniques (a)-(e) (see table incl. footnote) in coal-fired PC boiler. for New plant; Reducing nitrogen oxides (NOx) emissions to air. The BAT-AEL emission level is 80 – 125 mg/Nm3 .
valid
2019-04-23
2019-04-23
LCP-NOx-BAT20-XVI
Large combustion plants - NOx - BAT20-XVI
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Techniques (a)-(e) (see table incl. footnote) in coal-fired PC boiler. for Existing plant; Reducing nitrogen oxides (NOx) emissions to air. The BAT-AEL emission level is < 85 – 165 mg/Nm3 .
valid
2019-04-23
2019-04-23
LCP-NOx-BAT24-I
Large combustion plants - NOx - BAT24-I
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Techniques (a)-(g) (see table) for New plant; Reducing nitrogen oxides (NOx) emissions to air. The BAT-AEL emission level is 70-150 mg/Nm3.
valid
2019-04-23
2019-04-23
LCP-NOx-BAT24-II
Large combustion plants - NOx - BAT24-II
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Techniques (a)-(g) (see table) for Existing plant; Reducing nitrogen oxides (NOx) emissions to air. The BAT-AEL emission level is 70-225 mg/Nm3.
valid
2019-04-23
2019-04-23
LCP-NOx-BAT24-III
Large combustion plants - NOx - BAT24-III
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Techniques (a)-(g) (see table) for New plant; Reducing nitrogen oxides (NOx) emissions to air. The BAT-AEL emission level is 120–200 mg/Nm3.
valid
2019-04-23
2019-04-23
LCP-NOx-BAT24-IV
Large combustion plants - NOx - BAT24-IV
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Techniques (a)-(g) (see table) for Existing plant; Reducing nitrogen oxides (NOx) emissions to air. The BAT-AEL emission level is 120–275 mg/Nm3.
valid
2019-04-23
2019-04-23
LCP-NOx-BAT24-IX
Large combustion plants - NOx - BAT24-IX
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Techniques (a)-(g) (see table) for New plant; Reducing nitrogen oxides (NOx) emissions to air. The BAT-AEL emission level is 40–140 mg/Nm3.
valid
2019-04-23
2019-04-23
LCP-NOx-BAT24-V
Large combustion plants - NOx - BAT24-V
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Techniques (a)-(g) (see table) for New plant; Reducing nitrogen oxides (NOx) emissions to air. The BAT-AEL emission level is 50–140 mg/Nm3.
valid
2019-04-23
2019-04-23
LCP-NOx-BAT24-VI
Large combustion plants - NOx - BAT24-VI
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Techniques (a)-(g) (see table) for Existing plant; Reducing nitrogen oxides (NOx) emissions to air. The BAT-AEL emission level is 50–180 mg/Nm3.
valid
2019-04-23
2019-04-23
LCP-NOx-BAT24-VII
Large combustion plants - NOx - BAT24-VII
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Techniques (a)-(g) (see table) for New plant; Reducing nitrogen oxides (NOx) emissions to air. The BAT-AEL emission level is 100–200 mg/Nm3.
valid
2019-04-23
2019-04-23
LCP-NOx-BAT24-VIII
Large combustion plants - NOx - BAT24-VIII
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Techniques (a)-(g) (see table) for Existing plant; Reducing nitrogen oxides (NOx) emissions to air. The BAT-AEL emission level is 100–220 mg/Nm3.
valid
2019-04-23
2019-04-23
LCP-NOx-BAT24-X
Large combustion plants - NOx - BAT24-X
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Techniques (a)-(g) (see table) for Existing plant; Reducing nitrogen oxides (NOx) emissions to air. The BAT-AEL emission level is 40–150 mg/Nm3.
valid
2019-04-23
2019-04-23
LCP-NOx-BAT24-XI
Large combustion plants - NOx - BAT24-XI
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Techniques (a)-(g) (see table) for New plant; Reducing nitrogen oxides (NOx) emissions to air. The BAT-AEL emission level is 65–150 mg/Nm3.
valid
2019-04-23
2019-04-23
LCP-NOx-BAT24-XII
Large combustion plants - NOx - BAT24-XII
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Techniques (a)-(g) (see table) for Existing plant; Reducing nitrogen oxides (NOx) emissions to air. The BAT-AEL emission level is 95–165 mg/Nm3.
valid
2019-04-23
2019-04-23
LCP-NOx-BAT28-I
Large combustion plants - NOx - BAT28-I
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Techniques (a)-(i) (see table) for New plant; Reducing nitrogen oxides (NOx) emissions to air. The BAT-AEL emission level is 75–200 mg/Nm3.
valid
2019-04-23
2019-04-23
LCP-NOx-BAT28-II
Large combustion plants - NOx - BAT28-II
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Techniques (a)-(i) (see table) for Existing plant; Reducing nitrogen oxides (NOx) emissions to air. The BAT-AEL emission level is 150–270 mg/Nm3.
valid
2019-04-23
2019-04-23
LCP-NOx-BAT28-III
Large combustion plants - NOx - BAT28-III
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Techniques (a)-(i) (see table) for New plant; Reducing nitrogen oxides (NOx) emissions to air. The BAT-AEL emission level is 100–215 mg/Nm3.
valid
2019-04-23
2019-04-23
LCP-NOx-BAT28-IV
Large combustion plants - NOx - BAT28-IV
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Techniques (a)-(i) (see table) for Existing plant; Reducing nitrogen oxides (NOx) emissions to air. The BAT-AEL emission level is 210–330 mg/Nm3.
valid
2019-04-23
2019-04-23
LCP-NOx-BAT28-V
Large combustion plants - NOx - BAT28-V
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Techniques (a)-(i) (see table) for New plant; Reducing nitrogen oxides (NOx) emissions to air. The BAT-AEL emission level is 45–75 mg/Nm3.
valid
2019-04-23
2019-04-23
LCP-NOx-BAT28-VI
Large combustion plants - NOx - BAT28-VI
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Techniques (a)-(i) (see table) for Existing plant; Reducing nitrogen oxides (NOx) emissions to air. The BAT-AEL emission level is 45–100 mg/Nm3.
valid
2019-04-23
2019-04-23
LCP-NOx-BAT28-VII
Large combustion plants - NOx - BAT28-VII
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Techniques (a)-(i) (see table) for New plant; Reducing nitrogen oxides (NOx) emissions to air. The BAT-AEL emission level is 85–100 mg/Nm3.
valid
2019-04-23
2019-04-23
LCP-NOx-BAT28-VIII
Large combustion plants - NOx - BAT28-VIII
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Techniques (a)-(i) (see table) for Existing plant; Reducing nitrogen oxides (NOx) emissions to air. The BAT-AEL emission level is 85–110 mg/Nm3.
valid
2019-04-23
2019-04-23
LCP-NOx-BAT33-I
Large combustion plants - NOx - BAT33-I
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Techniques (a)-(b) (see table) for New plant; Reducing nitrogen oxides (NOx) emissions to air. The BAT-AEL emission level is 115–190 mg/Nm3.
valid
2019-04-23
2019-04-23
LCP-NOx-BAT33-II
Large combustion plants - NOx - BAT33-II
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Techniques (a)-(b) (see table) for Existing plant; Reducing nitrogen oxides (NOx) emissions to air. The BAT-AEL emission level is 125–625 mg/Nm3.
valid
2019-04-23
2019-04-23
LCP-NOx-BAT33-III
Large combustion plants - NOx - BAT33-III
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Techniques (a)-(b) (see table) for New plant; Reducing nitrogen oxides (NOx) emissions to air. The BAT-AEL emission level is 145–300 mg/Nm3.
valid
2019-04-23
2019-04-23
LCP-NOx-BAT33-IV
Large combustion plants - NOx - BAT33-IV
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Techniques (a)-(b) (see table) for Existing plant; Reducing nitrogen oxides (NOx) emissions to air. The BAT-AEL emission level is 150–750 mg/Nm3.
valid
2019-04-23
2019-04-23
LCP-NOx-BAT44-I
Large combustion plants - NOx - BAT44-I
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Ensure optimised combustion and/or to use oxidation catalysts for new open-cycle gas turbines (OCGTs); Reducing nitrogen oxides (NOx) emissions to air. The BAT-AEL emission level is 15–35 mg/Nm3.
valid
2019-04-23
2019-04-23
LCP-NOx-BAT44-II
Large combustion plants - NOx - BAT44-II
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Ensure optimised combustion and/or to use oxidation catalysts for new open-cycle gas turbines (OCGTs); Reducing nitrogen oxides (NOx) emissions to air. The BAT-AEL emission level is 25–50 mg/Nm3.
valid
2019-04-23
2019-04-23
LCP-NOx-BAT44-III
Large combustion plants - NOx - BAT44-III
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Ensure optimised combustion and/or to use oxidation catalysts for Existing OCGT (excluding turbines for mechanical drive applications); Reducing nitrogen oxides (NOx) emissions to air. The BAT-AEL emission level is 15–50 mg/Nm3.
valid
2019-04-23
2019-04-23
LCP-NOx-BAT44-IV
Large combustion plants - NOx - BAT44-IV
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Ensure optimised combustion and/or to use oxidation catalysts for Existing OCGT (excluding turbines for mechanical drive applications); Reducing nitrogen oxides (NOx) emissions to air. The BAT-AEL emission level is 25–55 mg/Nm3.
valid
2019-04-23
2019-04-23
LCP-NOx-BAT44-IX
Large combustion plants - NOx - BAT44-IX
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Ensure optimised combustion and/or to use oxidation catalysts for existing combined-cycle gas turbines (CCGTs); Reducing nitrogen oxides (NOx) emissions to air. The BAT-AEL emission level is 10–50 mg/Nm3.
valid
2019-04-23
2019-04-23
LCP-NOx-BAT44-V
Large combustion plants - NOx - BAT44-V
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Ensure optimised combustion and/or to use oxidation catalysts for new combined-cycle gas turbines (CCGTs); Reducing nitrogen oxides (NOx) emissions to air. The BAT-AEL emission level is 10–30 mg/Nm3.
valid
2019-04-23
2019-04-23
LCP-NOx-BAT44-VI
Large combustion plants - NOx - BAT44-VI
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Ensure optimised combustion and/or to use oxidation catalysts for new combined-cycle gas turbines (CCGTs); Reducing nitrogen oxides (NOx) emissions to air. The BAT-AEL emission level is 15–40 mg/Nm3.
valid
2019-04-23
2019-04-23
LCP-NOx-BAT44-VII
Large combustion plants - NOx - BAT44-VII
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Ensure optimised combustion and/or to use oxidation catalysts for existing combined-cycle gas turbines (CCGTs); Reducing nitrogen oxides (NOx) emissions to air. The BAT-AEL emission level is 10–40 mg/Nm3.
valid
2019-04-23
2019-04-23
LCP-NOx-BAT44-VIII
Large combustion plants - NOx - BAT44-VIII
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Ensure optimised combustion and/or to use oxidation catalysts for existing combined-cycle gas turbines (CCGTs); Reducing nitrogen oxides (NOx) emissions to air. The BAT-AEL emission level is 18-50 mg/Nm3.
valid
2019-04-23
2019-04-23
LCP-NOx-BAT44-X
Large combustion plants - NOx - BAT44-X
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Ensure optimised combustion and/or to use oxidation catalysts for existing combined-cycle gas turbines (CCGTs); Reducing nitrogen oxides (NOx) emissions to air. The BAT-AEL emission level is 18-55 mg/Nm3.
valid
2019-04-23
2019-04-23
LCP-NOx-BAT44-XI
Large combustion plants - NOx - BAT44-XI
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Ensure optimised combustion and/or to use oxidation catalysts for existing combined-cycle gas turbines (CCGTs); Reducing nitrogen oxides (NOx) emissions to air. The BAT-AEL emission level is 10-45 mg/Nm3.
valid
2019-04-23
2019-04-23
LCP-NOx-BAT44-XII
Large combustion plants - NOx - BAT44-XII
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Ensure optimised combustion and/or to use oxidation catalysts for existing combined-cycle gas turbines (CCGTs); Reducing nitrogen oxides (NOx) emissions to air. The BAT-AEL emission level is 35-55 mg/Nm3.
valid
2019-04-23
2019-04-23
LCP-NOx-BAT44-XIII
Large combustion plants - NOx - BAT44-XIII
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Ensure optimised combustion and/or to use oxidation catalysts for existing combined-cycle gas turbines (CCGTs); Reducing nitrogen oxides (NOx) emissions to air. The BAT-AEL emission level is 25-50 mg/Nm3.
valid
2019-04-23
2019-04-23
LCP-NOx-BAT44-XIV
Large combustion plants - NOx - BAT44-XIV
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Ensure optimised combustion and/or to use oxidation catalysts for existing combined-cycle gas turbines (CCGTs); Reducing nitrogen oxides (NOx) emissions to air. The BAT-AEL emission level is 35-55 mg/Nm3.
valid
2019-04-23
2019-04-23
LCP-NOx-BAT44-XIX
Large combustion plants - NOx - BAT44-XIX
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Ensure optimised combustion and/or to use oxidation catalysts for Existing plant; Reducing nitrogen oxides (NOx) emissions to air. The BAT-AEL emission level is 50–100 mg/Nm3.
valid
2019-04-23
2019-04-23
LCP-NOx-BAT44-XV
Large combustion plants - NOx - BAT44-XV
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Ensure optimised combustion and/or to use oxidation catalysts for open- and combined-cycle gas turbines put into operation no later than 27 November 2003, or existing gas turbine for emergency use and operated < 500 h/yr; Reducing nitrogen oxides (NOx) emissions to air. The BAT-AEL emission level is 60–140 mg/Nm3.
valid
2019-04-23
2019-04-23
LCP-NOx-BAT44-XVI
Large combustion plants - NOx - BAT44-XVI
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Ensure optimised combustion and/or to use oxidation catalysts for Existing plant; Reducing nitrogen oxides (NOx) emissions to air. The BAT-AEL emission level is 15–50 mg/Nm3.
valid
2019-04-23
2019-04-23
LCP-NOx-BAT44-XVII
Large combustion plants - NOx - BAT44-XVII
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Ensure optimised combustion and/or to use oxidation catalysts for New plant; Reducing nitrogen oxides (NOx) emissions to air. The BAT-AEL emission level is 25-55 mg/Nm3.
valid
2019-04-23
2019-04-23
LCP-NOx-BAT44-XVIII
Large combustion plants - NOx - BAT44-XVIII
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Ensure optimised combustion and/or to use oxidation catalysts for New plant; Reducing nitrogen oxides (NOx) emissions to air. The BAT-AEL emission level is 10–60 mg/Nm3.
valid
2019-04-23
2019-04-23
LCP-NOx-BAT44-XX
Large combustion plants - NOx - BAT44-XX
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Ensure optimised combustion and/or to use oxidation catalysts for New plant; Reducing nitrogen oxides (NOx) emissions to air. The BAT-AEL emission level is 30–85 mg/Nm3.
valid
2019-04-23
2019-04-23
LCP-NOx-BAT44-XXI
Large combustion plants - NOx - BAT44-XXI
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Ensure optimised combustion and/or to use oxidation catalysts for Existing plant; Reducing nitrogen oxides (NOx) emissions to air. The BAT-AEL emission level is 85–110 mg/Nm3.
valid
2019-04-23
2019-04-23
LCP-NOx-BAT44-XXII
Large combustion plants - NOx - BAT44-XXII
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Ensure optimised combustion and/or to use oxidation catalysts for New plant; Reducing nitrogen oxides (NOx) emissions to air. The BAT-AEL emission level is 20–75 mg/Nm3.
valid
2019-04-23
2019-04-23
LCP-NOx-BAT44-XXIII
Large combustion plants - NOx - BAT44-XXIII
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Ensure optimised combustion and/or to use oxidation catalysts for Existing plant; Reducing nitrogen oxides (NOx) emissions to air. The BAT-AEL emission level is 20–100 mg/Nm3.
valid
2019-04-23
2019-04-23
LCP-NOx-BAT44-XXIV
Large combustion plants - NOx - BAT44-XXIV
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Ensure optimised combustion and/or to use oxidation catalysts for New plant; Reducing nitrogen oxides (NOx) emissions to air. The BAT-AEL emission level is 55–85 mg/Nm3.
valid
2019-04-23
2019-04-23
LCP-NOx-BAT44-XXV
Large combustion plants - NOx - BAT44-XXV
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Ensure optimised combustion and/or to use oxidation catalysts for Existing plant; Reducing nitrogen oxides (NOx) emissions to air. The BAT-AEL emission level is 55–110 mg/Nm3.
valid
2019-04-23
2019-04-23
LCP-NOx-BAT49-I
Large combustion plants - NOx - BAT49-I
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Techniques (a)-(b) (see table) for New boilers; Reducing nitrogen oxides (NOx) emissions to air. The BAT-AEL emission level is 15–65 mg/Nm3.
valid
2019-04-23
2019-04-23
LCP-NOx-BAT49-II
Large combustion plants - NOx - BAT49-II
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Techniques (a)-(b) (see table) for New boilers; Reducing nitrogen oxides (NOx) emissions to air. The BAT-AEL emission level is 22–100 mg/Nm3.
valid
2019-04-23
2019-04-23
LCP-NOx-BAT49-III
Large combustion plants - NOx - BAT49-III
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Techniques (a)-(b) (see table) for Existing boilers; Reducing nitrogen oxides (NOx) emissions to air. The BAT-AEL emission level is 20–100 mg/Nm3.
valid
2019-04-23
2019-04-23
LCP-NOx-BAT49-IV
Large combustion plants - NOx - BAT49-IV
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Techniques (a)-(b) (see table) for Existing boilers; Reducing nitrogen oxides (NOx) emissions to air. The BAT-AEL emission level is 22–110 mg/Nm3.
valid
2019-04-23
2019-04-23
LCP-NOx-BAT49-V
Large combustion plants - NOx - BAT49-V
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Techniques (a)-(b) (see table) for new combined-cycle gas turbines (CCGTs); Reducing nitrogen oxides (NOx) emissions to air. The BAT-AEL emission level is 20–35 mg/Nm3.
valid
2019-04-23
2019-04-23
LCP-NOx-BAT49-VI
Large combustion plants - NOx - BAT49-VI
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Techniques (a)-(b) (see table) for new combined-cycle gas turbines (CCGTs); Reducing nitrogen oxides (NOx) emissions to air. The BAT-AEL emission level is 30–50 mg/Nm3.
valid
2019-04-23
2019-04-23
LCP-NOx-BAT49-VII
Large combustion plants - NOx - BAT49-VII
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Techniques (a)-(b) (see table) for existing combined-cycle gas turbines (CCGTs); Reducing nitrogen oxides (NOx) emissions to air. The BAT-AEL emission level is 20–50 mg/Nm3.
valid
2019-04-23
2019-04-23
LCP-NOx-BAT49-VIII
Large combustion plants - NOx - BAT49-VIII
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Techniques (a)-(b) (see table) for existing combined-cycle gas turbines (CCGTs); Reducing nitrogen oxides (NOx) emissions to air. The BAT-AEL emission level is 30–55 mg/Nm3.
valid
2019-04-23
2019-04-23
LCP-NOx-BAT53-I
Large combustion plants - NOx - BAT53-I
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Techniques (a)-(d) (see table). for new open-cycle gas turbines on offshore platforms; Reducing nitrogen oxides (NOx) emissions to air. The BAT-AEL emission level is 15–50 mg/Nm3.
valid
2019-04-23
2019-04-23
LCP-NOx-BAT53-II
Large combustion plants - NOx - BAT53-II
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Techniques (a)-(d) (see table). for existing open-cycle gas turbines on offshore platforms; Reducing nitrogen oxides (NOx) emissions to air. The BAT-AEL emission level is < 50–350 mg/Nm3.
valid
2019-04-23
2019-04-23
LCP-NOx-BAT56-I
Large combustion plants - NOx - BAT56-I
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Techniques (a)-(i) (see table). for New plant; Reducing nitrogen oxides (NOx) emissions to air. The BAT-AEL emission level is 30–85 mg/Nm3.
valid
2019-04-23
2019-04-23
LCP-NOx-BAT56-II
Large combustion plants - NOx - BAT56-II
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Techniques (a)-(i) (see table). for Existing plant; Reducing nitrogen oxides (NOx) emissions to air. The BAT-AEL emission level is 80–290 mg/Nm3.
valid
2019-04-23
2019-04-23
LCP-NOx-BAT56-III
Large combustion plants - NOx - BAT56-III
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Techniques (a)-(i) (see table). for New plant; Reducing nitrogen oxides (NOx) emissions to air. The BAT-AEL emission level is 50–110 mg/Nm3.
valid
2019-04-23
2019-04-23
LCP-NOx-BAT56-IV
Large combustion plants - NOx - BAT56-IV
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Techniques (a)-(i) (see table). for Existing plant; Reducing nitrogen oxides (NOx) emissions to air. The BAT-AEL emission level is 100–330 mg/Nm3.
valid
2019-04-23
2019-04-23
LCP-NOx-BAT56-V
Large combustion plants - NOx - BAT56-V
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Techniques (a)-(i) (see table). for New plant; Reducing nitrogen oxides (NOx) emissions to air. The BAT-AEL emission level is 20–80 mg/Nm3.
valid
2019-04-23
2019-04-23
LCP-NOx-BAT56-VI
Large combustion plants - NOx - BAT56-VI
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Techniques (a)-(i) (see table). for Existing plant; Reducing nitrogen oxides (NOx) emissions to air. The BAT-AEL emission level is 70–100 mg/Nm3.
valid
2019-04-23
2019-04-23
LCP-NOx-BAT56-VII
Large combustion plants - NOx - BAT56-VII
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Techniques (a)-(i) (see table). for New plant; Reducing nitrogen oxides (NOx) emissions to air. The BAT-AEL emission level is 30–100 mg/Nm3.
valid
2019-04-23
2019-04-23
LCP-NOx-BAT56-VIII
Large combustion plants - NOx - BAT56-VIII
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Techniques (a)-(i) (see table). for Existing plant; Reducing nitrogen oxides (NOx) emissions to air. The BAT-AEL emission level is 85–110 mg/Nm3.
valid
2019-04-23
2019-04-23
LCP-NOx-BAT73-I
Large combustion plants - NOx - BAT73-I
1. Energy industries: 1.4, Gasification of coal or other fuels in installations with a total rated thermal input of 20 MW or more, only when this activity is directly associated to a combustion plant; Use one or a combination of the techniques given below: (a)-(e) (see table) for New plant; Reducing nitrogen oxides (NOx) emissions to air. The BAT-AEL emission level is 10–25 mg/Nm3 .
valid
2019-04-23
2019-04-23
LCP-NOx-BAT73-II
Large combustion plants - NOx - BAT73-II
1. Energy industries: 1.4, Gasification of coal or other fuels in installations with a total rated thermal input of 20 MW or more, only when this activity is directly associated to a combustion plant; Use one or a combination of the techniques given below: (a)-(e) (see table) for Existing plant; Reducing nitrogen oxides (NOx) emissions to air. The BAT-AEL emission level is 12–45 mg/Nm3 .
valid
2019-04-23
2019-04-23
LCP-NOx-BAT73-III
Large combustion plants - NOx - BAT73-III
1. Energy industries: 1.4, Gasification of coal or other fuels in installations with a total rated thermal input of 20 MW or more, only when this activity is directly associated to a combustion plant; Use one or a combination of the techniques given below: (a)-(e) (see table) for New plant; Reducing nitrogen oxides (NOx) emissions to air. The BAT-AEL emission level is 1–35 mg/Nm3 .
valid
2019-04-23
2019-04-23
LCP-NOx-BAT73-IV
Large combustion plants - NOx - BAT73-IV
1. Energy industries: 1.4, Gasification of coal or other fuels in installations with a total rated thermal input of 20 MW or more, only when this activity is directly associated to a combustion plant; Use one or a combination of the techniques given below: (a)-(e) (see table) for Existing plant; Reducing nitrogen oxides (NOx) emissions to air. The BAT-AEL emission level is 1–60 mg/Nm3 .
valid
2019-04-23
2019-04-23
LCP-PCDD.F-BAT59
Large combustion plants - PCDD.F - BAT59
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Techniques (a)-(c) (see table); Reducing PCDD/F emissions to air. The BAT-AEL emission level is < 0,012–0,036 ng I-TEQ/Nm3 .
valid
2019-04-23
2019-04-23
LCP-PCDD.F-BAT71-I
Large combustion plants - PCDD.F - BAT71-I
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Use a combination of the techniques given in BAT 6, BAT 26 and techniques (a)-(c) (see table); Reducing PCDD/F emissions to air. The BAT-AEL emission level is ≤ 0,01-0,03 ng I-TEQ/Nm3 .
valid
2019-04-23
2019-04-23
LCP-Ni-BAT15-XIII
Large combustion plants - Ni - BAT15-XIII
1. Energy industries; 5. Waste management: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; 1.4, Gasification of coal or other fuels in installations with a total rated thermal input of 20 MW or more, only when this activity is directly associated to a combustion plant; 5.2, Disposal or recovery of waste in waste co-incineration plants for non-hazardous waste with a capacity exceeding 3 tonnes per hour or for hazardous waste with a capacity exceeding 10 tonnes per day, only when this activity takes place in combustion plants covered under 1.1 above. Reducing nickel to water. The BAT-AEL emission level is 10–50 µg/l .
valid
2019-04-23
2019-04-23
LCP-Pb-BAT15-XIV
Large combustion plants - Pb - BAT15-XIV
1. Energy industries; 5. Waste management: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; 1.4, Gasification of coal or other fuels in installations with a total rated thermal input of 20 MW or more, only when this activity is directly associated to a combustion plant; 5.2, Disposal or recovery of waste in waste co-incineration plants for non-hazardous waste with a capacity exceeding 3 tonnes per hour or for hazardous waste with a capacity exceeding 10 tonnes per day, only when this activity takes place in combustion plants covered under 1.1 above. Reducing lead to water. The BAT-AEL emission level is 10–20 µg/l .
valid
2019-04-23
2019-04-23
LCP-S-BAT15-VI
Large combustion plants - S - BAT15-VI
1. Energy industries; 5. Waste management: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; 1.4, Gasification of coal or other fuels in installations with a total rated thermal input of 20 MW or more, only when this activity is directly associated to a combustion plant; 5.2, Disposal or recovery of waste in waste co-incineration plants for non-hazardous waste with a capacity exceeding 3 tonnes per hour or for hazardous waste with a capacity exceeding 10 tonnes per day, only when this activity takes place in combustion plants covered under 1.1 above. Reducing sulphide to water. The BAT-AEL emission level is 0,1–0,2 mg/l.
valid
2019-04-23
2019-04-23
LCP-SO2-BAT21-I
Large combustion plants - SO2 - BAT21-I
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Techniques (a)-(j) (see table) for New plant; Reducing sulphur dioxide (SO2) emissions to air. The BAT-AEL emission level is 150–200 mg/Nm3.
valid
2019-04-23
2019-04-23
LCP-SO2-BAT21-II
Large combustion plants - SO2 - BAT21-II
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Techniques (a)-(j) (see table) for Existing plant; Reducing sulphur dioxide (SO2) emissions to air. The BAT-AEL emission level is 150–360 mg/Nm3 .
valid
2019-04-23
2019-04-23
LCP-SO2-BAT21-III
Large combustion plants - SO2 - BAT21-III
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Techniques (a)-(j) (see table) for New plant; Reducing sulphur dioxide (SO2) emissions to air. The BAT-AEL emission level is 170–220 mg/Nm3 .
valid
2019-04-23
2019-04-23
LCP-SO2-BAT21-IV
Large combustion plants - SO2 - BAT21-IV
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Techniques (a)-(j) (see table) for Existing plant; Reducing sulphur dioxide (SO2) emissions to air. The BAT-AEL emission level is 170–400 mg/Nm3.
valid
2019-04-23
2019-04-23
LCP-SO2-BAT21-IX
Large combustion plants - SO2 - BAT21-IX
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Techniques (a)-(j) (see table) in PC boilers for New plant; Reducing sulphur dioxide (SO2) emissions to air. The BAT-AEL emission level is 10–75 mg/Nm3 .
valid
2019-04-23
2019-04-23
LCP-SO2-BAT21-V
Large combustion plants - SO2 - BAT21-V
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Techniques (a)-(j) (see table) for New plant; Reducing sulphur dioxide (SO2) emissions to air. The BAT-AEL emission level is 80–150 mg/Nm3 .
valid
2019-04-23
2019-04-23
LCP-SO2-BAT21-VI
Large combustion plants - SO2 - BAT21-VI
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Techniques (a)-(j) (see table) for Existing plant; Reducing sulphur dioxide (SO2) emissions to air. The BAT-AEL emission level is 95–200 mg/Nm3 .
valid
2019-04-23
2019-04-23
LCP-SO2-BAT21-VII
Large combustion plants - SO2 - BAT21-VII
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Techniques (a)-(j) (see table) for New plant; Reducing sulphur dioxide (SO2) emissions to air. The BAT-AEL emission level is 135–200 mg/Nm3 .
valid
2019-04-23
2019-04-23
LCP-SO2-BAT21-VIII
Large combustion plants - SO2 - BAT21-VIII
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Techniques (a)-(j) (see table) for Existing plant; Reducing sulphur dioxide (SO2) emissions to air. The BAT-AEL emission level is 135–220 mg/Nm3 .
valid
2019-04-23
2019-04-23
LCP-SO2-BAT21-X
Large combustion plants - SO2 - BAT21-X
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Techniques (a)-(j) (see table) in PC boilers for Existing plant; Reducing sulphur dioxide (SO2) emissions to air. The BAT-AEL emission level is 10–130 mg/Nm3.
valid
2019-04-23
2019-04-23
LCP-SO2-BAT21-XI
Large combustion plants - SO2 - BAT21-XI
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Techniques (a)-(j) (see table) in PC boilers for New plant; Reducing sulphur dioxide (SO2) emissions to air. The BAT-AEL emission level is 25–110 mg/Nm3.
valid
2019-04-23
2019-04-23
LCP-SO2-BAT21-XII
Large combustion plants - SO2 - BAT21-XII
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Techniques (a)-(j) (see table) in PC boilers for Existing plant; Reducing sulphur dioxide (SO2) emissions to air. The BAT-AEL emission level is 25–165 mg/Nm3 .
valid
2019-04-23
2019-04-23
LCP-SO2-BAT21-XIII
Large combustion plants - SO2 - BAT21-XIII
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Techniques (a)-(j) (see table) in fluidised bed boilers for New plant; Reducing sulphur dioxide (SO2) emissions to air. The BAT-AEL emission level is 20–75 mg/Nm3 .
valid
2019-04-23
2019-04-23
LCP-SO2-BAT21-XIV
Large combustion plants - SO2 - BAT21-XIV
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Techniques (a)-(j) (see table) in fluidised bed boilers for Existing plant; Reducing sulphur dioxide (SO2) emissions to air. The BAT-AEL emission level is 20–180 mg/Nm3 .
valid
2019-04-23
2019-04-23
LCP-SO2-BAT21-XV
Large combustion plants - SO2 - BAT21-XV
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Techniques (a)-(j) (see table) in fluidised bed boilers for New plant; Reducing sulphur dioxide (SO2) emissions to air. The BAT-AEL emission level is 25–110 mg/Nm3.
valid
2019-04-23
2019-04-23
LCP-SO2-BAT21-XVI
Large combustion plants - SO2 - BAT21-XVI
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Techniques (a)-(j) (see table) in fluidised bed boilers for Existing plant; Reducing sulphur dioxide (SO2) emissions to air. The BAT-AEL emission level is 50–220 mg/Nm3.
valid
2019-04-23
2019-04-23
LCP-SO2-BAT25-I
Large combustion plants - SO2 - BAT25-I
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Techniques (a)-(h) (see table) for New plant; Reducing sulphur dioxide (SO2) emissions to air. The BAT-AEL emission level is 15–70 mg/Nm3.
valid
2019-04-23
2019-04-23
LCP-SO2-BAT25-II
Large combustion plants - SO2 - BAT25-II
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Techniques (a)-(h) (see table) for Existing plant; Reducing sulphur dioxide (SO2) emissions to air. The BAT-AEL emission level is 15–100 mg/Nm3.
valid
2019-04-23
2019-04-23
LCP-SO2-BAT25-III
Large combustion plants - SO2 - BAT25-III
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Techniques (a)-(h) (see table) for New plant; Reducing sulphur dioxide (SO2) emissions to air. The BAT-AEL emission level is 30–175 mg/Nm3.
valid
2019-04-23
2019-04-23
LCP-SO2-BAT25-IV
Large combustion plants - SO2 - BAT25-IV
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Techniques (a)-(h) (see table) for Existing plant; Reducing sulphur dioxide (SO2) emissions to air. The BAT-AEL emission level is 30–215 mg/Nm3.
valid
2019-04-23
2019-04-23
LCP-SO2-BAT25-IX
Large combustion plants - SO2 - BAT25-IX
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Techniques (a)-(h) (see table) for New plant; Reducing sulphur dioxide (SO2) emissions to air. The BAT-AEL emission level is < 10–35 mg/Nm3.
valid
2019-04-23
2019-04-23
LCP-SO2-BAT25-V
Large combustion plants - SO2 - BAT25-V
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Techniques (a)-(h) (see table) for New plant; Reducing sulphur dioxide (SO2) emissions to air. The BAT-AEL emission level is < 10–50 mg/Nm3.
valid
2019-04-23
2019-04-23
LCP-SO2-BAT25-VI
Large combustion plants - SO2 - BAT25-VI
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Techniques (a)-(h) (see table) for Existing plant; Reducing sulphur dioxide (SO2) emissions to air. The BAT-AEL emission level is < 10–70 mg/Nm3.
valid
2019-04-23
2019-04-23
LCP-SO2-BAT25-VII
Large combustion plants - SO2 - BAT25-VII
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Techniques (a)-(h) (see table) for New plant; Reducing sulphur dioxide (SO2) emissions to air. The BAT-AEL emission level is < 20–85 mg/Nm3.
valid
2019-04-23
2019-04-23
LCP-SO2-BAT25-VIII
Large combustion plants - SO2 - BAT25-VIII
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Techniques (a)-(h) (see table) for Existing plant; Reducing sulphur dioxide (SO2) emissions to air. The BAT-AEL emission level is < 20–175 mg/Nm3.
valid
2019-04-23
2019-04-23
LCP-SO2-BAT25-X
Large combustion plants - SO2 - BAT25-X
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Techniques (a)-(h) (see table) for Existing plant; Reducing sulphur dioxide (SO2) emissions to air. The BAT-AEL emission level is < 10–50 mg/Nm3.
valid
2019-04-23
2019-04-23
LCP-SO2-BAT25-XI
Large combustion plants - SO2 - BAT25-XI
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Techniques (a)-(h) (see table); Reducing sulphur dioxide (SO2) emissions to air. The BAT-AEL emission level is < 20–70 mg/Nm3.
valid
2019-04-23
2019-04-23
LCP-SO2-BAT25-XII
Large combustion plants - SO2 - BAT25-XII
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Techniques (a)-(h) (see table) for Existing plant; Reducing sulphur dioxide (SO2) emissions to air. The BAT-AEL emission level is < 20–85 mg/Nm3.
valid
2019-04-23
2019-04-23
LCP-SO2-BAT29-I
Large combustion plants - SO2 - BAT29-I
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Techniques (a)-(f) (see table) for New plant; Reducing sulphur dioxide (SO2) emissions to air. The BAT-AEL emission level is 50–175 mg/Nm3.
valid
2019-04-23
2019-04-23
LCP-SO2-BAT29-II
Large combustion plants - SO2 - BAT29-II
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Techniques (a)-(f) (see table) for Existing plant; Reducing sulphur dioxide (SO2) emissions to air. The BAT-AEL emission level is 50–175 mg/Nm3.
valid
2019-04-23
2019-04-23
LCP-SO2-BAT29-III
Large combustion plants - SO2 - BAT29-III
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Techniques (a)-(f) (see table) for New plant; Reducing sulphur dioxide (SO2) emissions to air. The BAT-AEL emission level is 150–200 mg/Nm3.
valid
2019-04-23
2019-04-23
LCP-SO2-BAT29-IV
Large combustion plants - SO2 - BAT29-IV
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Techniques (a)-(f) (see table) for Existing plant; Reducing sulphur dioxide (SO2) emissions to air. The BAT-AEL emission level is 150–200 mg/Nm3.
valid
2019-04-23
2019-04-23
LCP-SO2-BAT29-V
Large combustion plants - SO2 - BAT29-V
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Techniques (a)-(f) (see table) for New plant; Reducing sulphur dioxide (SO2) emissions to air. The BAT-AEL emission level is 35–50 mg/Nm3.
valid
2019-04-23
2019-04-23
LCP-SO2-BAT29-VI
Large combustion plants - SO2 - BAT29-VI
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Techniques (a)-(f) (see table) for Existing plant; Reducing sulphur dioxide (SO2) emissions to air. The BAT-AEL emission level is 50–110 mg/Nm3.
valid
2019-04-23
2019-04-23
LCP-SO2-BAT29-VII
Large combustion plants - SO2 - BAT29-VII
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Techniques (a)-(f) (see table) for New plant; Reducing sulphur dioxide (SO2) emissions to air. The BAT-AEL emission level is 50–120 mg/Nm3.
valid
2019-04-23
2019-04-23
LCP-SO2-BAT29-VIII
Large combustion plants - SO2 - BAT29-VIII
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Techniques (a)-(f) (see table) for Existing plant; Reducing sulphur dioxide (SO2) emissions to air. The BAT-AEL emission level is 150–165 mg/Nm3.
valid
2019-04-23
2019-04-23
LCP-SO2-BAT34-I
Large combustion plants - SO2 - BAT34-I
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Techniques (a)-(c) (see table) for New combustion plant (all sizes); Reducing sulphur dioxide (SO2) emissions to air. The BAT-AEL emission level is 45–100 mg/Nm3.
valid
2019-04-23
2019-04-23
LCP-SO2-BAT34-II
Large combustion plants - SO2 - BAT34-II
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Techniques (a)-(c) (see table) for Existing combustion plant (all sizes); Reducing sulphur dioxide (SO2) emissions to air. The BAT-AEL emission level is 100–200 mg/Nm3.
valid
2019-04-23
2019-04-23
LCP-SO2-BAT34-III
Large combustion plants - SO2 - BAT34-III
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Techniques (a)-(c) (see table) for New combustion plant (all sizes); Reducing sulphur dioxide (SO2) emissions to air. The BAT-AEL emission level is 60–110 mg/Nm3.
valid
2019-04-23
2019-04-23
LCP-SO2-BAT34-IV
Large combustion plants - SO2 - BAT34-IV
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Techniques (a)-(c) (see table) for Existing combustion plant (all sizes); Reducing sulphur dioxide (SO2) emissions to air. The BAT-AEL emission level is 105–235 mg/Nm3.
valid
2019-04-23
2019-04-23
LCP-SO2-BAT39-I
Large combustion plants - SO2 - BAT39-I
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Technique (a) (see table) for new and existing plants; Reducing sulphur dioxide (SO2) emissions to air. The BAT-AEL emission level is 35–60 mg/Nm3.
valid
2019-04-23
2019-04-23
LCP-SO2-BAT39-II
Large combustion plants - SO2 - BAT39-II
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Technique (a) (see table) for new and existing plants; Reducing sulphur dioxide (SO2) emissions to air. The BAT-AEL emission level is 50–66 mg/Nm3.
valid
2019-04-23
2019-04-23
LCP-SO2-BAT50-I
Large combustion plants - SO2 - BAT50-I
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Techniques (a)-(b) (see table) in boilers; Reducing sulphur dioxide (SO2) emissions to air. The BAT-AEL emission level is 25–150 mg/Nm3.
valid
2019-04-23
2019-04-23
LCP-SO2-BAT50-II
Large combustion plants - SO2 - BAT50-II
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Techniques (a)-(b) (see table) in boilers; Reducing sulphur dioxide (SO2) emissions to air. The BAT-AEL emission level is 50–200 mg/Nm3.
valid
2019-04-23
2019-04-23
LCP-SO2-BAT50-III
Large combustion plants - SO2 - BAT50-III
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Techniques (a)-(b) (see table) in combined-cycle gas turbines (CCGTs); Reducing sulphur dioxide (SO2) emissions to air. The BAT-AEL emission level is 10–45 mg/Nm3.
valid
2019-04-23
2019-04-23
LCP-SO2-BAT50-IV
Large combustion plants - SO2 - BAT50-IV
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Techniques (a)-(b) (see table) in combined-cycle gas turbines (CCGTs); Reducing sulphur dioxide (SO2) emissions to air. The BAT-AEL emission level is 20–70 mg/Nm3.
valid
2019-04-23
2019-04-23
LCP-SO2-BAT57-I
Large combustion plants - SO2 - BAT57-I
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Techniques (a)-(g) (see table). for New and existing boilers; Reducing sulphur dioxide (SO2) emissions to air. The BAT-AEL emission level is 10–110 mg/Nm3.
valid
2019-04-23
2019-04-23
LCP-SO2-BAT57-II
Large combustion plants - SO2 - BAT57-II
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Techniques (a)-(g) (see table). for New and existing boilers; Reducing sulphur dioxide (SO2) emissions to air. The BAT-AEL emission level is 90–200 mg/Nm3.
valid
2019-04-23
2019-04-23
LCP-SO2-BAT74
Large combustion plants - SO2 - BAT74
1. Energy industries: 1.4, Gasification of coal or other fuels in installations with a total rated thermal input of 20 MW or more, only when this activity is directly associated to a combustion plant; Acid gas removal (see table); Reducing sulphur dioxide (SO2) emissions to air. The BAT-AEL emission level is 3–16 mg/Nm3.
valid
2019-04-23
2019-04-23
LCP-SO3-BAT15-VII
Large combustion plants - SO3 - BAT15-VII
1. Energy industries; 5. Waste management: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; 1.4, Gasification of coal or other fuels in installations with a total rated thermal input of 20 MW or more, only when this activity is directly associated to a combustion plant; 5.2, Disposal or recovery of waste in waste co-incineration plants for non-hazardous waste with a capacity exceeding 3 tonnes per hour or for hazardous waste with a capacity exceeding 10 tonnes per day, only when this activity takes place in combustion plants covered under 1.1 above. Reducing sulphite to water. The BAT-AEL emission level is 1–20 mg/l .
valid
2019-04-23
2019-04-23
LCP-SO4-BAT15-V
Large combustion plants - SO4 - BAT15-V
1. Energy industries; 5. Waste management: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; 1.4, Gasification of coal or other fuels in installations with a total rated thermal input of 20 MW or more, only when this activity is directly associated to a combustion plant; 5.2, Disposal or recovery of waste in waste co-incineration plants for non-hazardous waste with a capacity exceeding 3 tonnes per hour or for hazardous waste with a capacity exceeding 10 tonnes per day, only when this activity takes place in combustion plants covered under 1.1 above. Reducing sulphates to water. The BAT-AEL emission level is 1,3–2,0 g/l .
valid
2019-04-23
2019-04-23
LCP-TVOC-BAT15-XVI
Large combustion plants - TVOC - BAT15-XVI
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Techniques (a)-(c) (see table); Reducing TVOC emissions to air. The BAT-AEL emission level is 0,6–12 mg/Nm3 .
valid
2019-04-23
2019-04-23
LCP-TVOC-BAT71-II
Large combustion plants - TVOC - BAT71-II
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Use a combination of the techniques given in BAT 6, BAT 26 and techniques (a)-(c) (see table); Reducing TVOC emissions to air. The BAT-AEL emission level is <0,1-5 mg/Nm3.
valid
2019-04-23
2019-04-23
LCP-TVOC-BAT71-III
Large combustion plants - TVOC - BAT71-III
1. Energy industries: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; Use a combination of the techniques given in BAT 6, BAT 26 and techniques (a)-(c) (see table); Reducing TVOC emissions to air. The BAT-AEL emission level is 0,5-10 mg/Nm3.
valid
2019-04-23
2019-04-23
LVOC-Benzene-BAT57-I
Production of Large Volume Organic Chemicals - Benzene - BAT57-I
4. Chemical industry: 4.1, Production of organic chemicals, such as: (b) oxygen-containing hydrocarbons such as alcohols, aldehydes, ketones, carboxylic acids, esters and mixtures of esters, acetates, ethers, peroxides and epoxy resins; Techniques (a)-(d) (see table); Reducing benzene emissions to air. The BAT-AEL emission level is < 1 mg/Nm3.
valid
2019-04-23
2019-04-23
LVOC-Cl2-BAT66-IV
Production of Large Volume Organic Chemicals - Cl2 - BAT66-IV
4. Chemical industry: 4.1, Production of organic chemicals, such as: (d) nitrogenous hydrocarbons such as amines, amides, nitrous compounds, nitro compounds or nitrate compounds, nitriles, cyanates, isocyanates; Treat combined waste gas streams using a thermal oxidiser followed by caustic scrubbing; Reducing chlorides emissions to air. The BAT-AEL emission level is < 1 mg/Nm3.
valid
2019-04-23
2019-04-23
LCP-TOC-BAT15-I
Large combustion plants - TOC - BAT15-I
1. Energy industries; 5. Waste management: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; 1.4, Gasification of coal or other fuels in installations with a total rated thermal input of 20 MW or more, only when this activity is directly associated to a combustion plant; 5.2, Disposal or recovery of waste in waste co-incineration plants for non-hazardous waste with a capacity exceeding 3 tonnes per hour or for hazardous waste with a capacity exceeding 10 tonnes per day, only when this activity takes place in combustion plants covered under 1.1 above. Reducing total organic carbon (TOC) to water. The BAT-AEL emission level is 20–50 mg/l .
valid
2019-04-23
2019-04-23
LCP-TSS-BAT15-III
Large combustion plants - TSS - BAT15-III
1. Energy industries; 5. Waste management: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; 1.4, Gasification of coal or other fuels in installations with a total rated thermal input of 20 MW or more, only when this activity is directly associated to a combustion plant; 5.2, Disposal or recovery of waste in waste co-incineration plants for non-hazardous waste with a capacity exceeding 3 tonnes per hour or for hazardous waste with a capacity exceeding 10 tonnes per day, only when this activity takes place in combustion plants covered under 1.1 above. Reducing total suspended solids to water. The BAT-AEL emission level is 10–30 mg/l .
valid
2019-04-23
2019-04-23
LCP-Zn-BAT15-XV
Large combustion plants - Zn - BAT15-XV
1. Energy industries; 5. Waste management: 1.1, Combustion of fuels in installations with a total rated thermal input of 50 MW or more, only when this activity takes place in combustion plants with a total rated thermal input of 50 MW or more; 1.4, Gasification of coal or other fuels in installations with a total rated thermal input of 20 MW or more, only when this activity is directly associated to a combustion plant; 5.2, Disposal or recovery of waste in waste co-incineration plants for non-hazardous waste with a capacity exceeding 3 tonnes per hour or for hazardous waste with a capacity exceeding 10 tonnes per day, only when this activity takes place in combustion plants covered under 1.1 above. Reducing zinc to water. The BAT-AEL emission level is 50–200 µg/l .
valid
2019-04-23
2019-04-23
LVOC-Cl2-BAT67-IV
Production of Large Volume Organic Chemicals - Cl2 - BAT67-IV
4. Chemical industry: 4.1, Production of organic chemicals, such as: (d) nitrogenous hydrocarbons such as amines, amides, nitrous compounds, nitro compounds or nitrate compounds, nitriles, cyanates, isocyanates; Treat combined waste gas streams using a thermal oxidiser followed by caustic scrubbing; Reducing chlorides emissions to air. The BAT-AEL emission level is < 1 mg/Nm3.
valid
2019-04-23
2019-04-23
LVOC-Cl2-BAT76-III
Production of Large Volume Organic Chemicals - Cl2 - BAT76-III
4. Chemical industry: 4.1, Production of organic chemicals, such as: (f) halogenic hydrocarbons; treat the combined waste gas streams from EDC and/or VCM production by using a thermal oxidiser followed by two-stage wet scrubbing; Reducing chlorides emissions to air. The BAT-AEL emission level is < 1–4 mg/Nm3, at 11 vol-% O2.
valid
2019-04-23
2019-04-23
LVOC-Cl2-BAT77-III
Production of Large Volume Organic Chemicals - Cl2 - BAT77-III
4. Chemical industry: 4.1, Production of organic chemicals, such as: (f) halogenic hydrocarbons; treat the combined waste gas streams from EDC and/or VCM production by using a thermal oxidiser followed by two-stage wet scrubbing; Reducing chlorides emissions to air. The BAT-AEL emission level is < 1–4 mg/Nm3, at 11 vol-% O2.
valid
2019-04-23
2019-04-23
LVOC-Cu-BAT80-I
Production of Large Volume Organic Chemicals - Cu - BAT80-I
4. Chemical industry: 4.1, Production of organic chemicals, such as: (f) halogenic hydrocarbons Reducing copper to water. The BAT-AEL emission level is 0,04–0,2 g/t EDC produced by oxychlorination .
valid
2019-04-23
2019-04-23
LVOC-EDC-BAT80-II
Production of Large Volume Organic Chemicals - EDC - BAT80-II
4. Chemical industry: 4.1, Production of organic chemicals, such as: (f) halogenic hydrocarbons Reducing EDC to water. The BAT-AEL emission level is 0,01–0,05 g/t EDC purified .
valid
2019-04-23
2019-04-23
LVOC-EDCVCM-BAT76-II
Production of Large Volume Organic Chemicals - EDCVCM - BAT76-II
4. Chemical industry: 4.1, Production of organic chemicals, such as: (f) halogenic hydrocarbons; treat the combined waste gas streams from EDC and/or VCM production by using a thermal oxidiser followed by two-stage wet scrubbing; Reducing EDC and VCM emissions to air. The BAT-AEL emission level is < 1 mg/Nm3, at 11 vol-% O2.
valid
2019-04-23
2019-04-23
LVOC-EDCVCM-BAT77-II
Production of Large Volume Organic Chemicals - EDCVCM - BAT77-II
4. Chemical industry: 4.1, Production of organic chemicals, such as: (f) halogenic hydrocarbons; treat the combined waste gas streams from EDC and/or VCM production by using a thermal oxidiser followed by two-stage wet scrubbing; Reducing EDC and VCM emissions to air. The BAT-AEL emission level is < 1 mg/Nm3, at 11 vol-% O2.
valid
2019-04-23
2019-04-23
LVOC-Formaldehyde-BAT45-II
Production of Large Volume Organic Chemicals - Formaldehyde - BAT45-II
4. Chemical industry: 4.1, Production of organic chemicals, such as: (b) oxygen-containing hydrocarbons such as alcohols, aldehydes, ketones, carboxylic acids, esters and mixtures of esters, acetates, ethers, peroxides and epoxy resins; Techniques (a)-(c) (see table); Reducing formaldehyde emissions to air. The BAT-AEL emission level is 2–5 mg/Nm3.
valid
2019-04-23
2019-04-23
LVOC-HCl-BAT66-V
Production of Large Volume Organic Chemicals - HCl - BAT66-V
4. Chemical industry: 4.1, Production of organic chemicals, such as: (d) nitrogenous hydrocarbons such as amines, amides, nitrous compounds, nitro compounds or nitrate compounds, nitriles, cyanates, isocyanates; Treat combined waste gas streams using a thermal oxidiser followed by caustic scrubbing; Reducing hydrogen chloride emissions to air. The BAT-AEL emission level is 2–10 mg/Nm3.
valid
2019-04-23
2019-04-23
LVOC-HCl-BAT67-V
Production of Large Volume Organic Chemicals - HCl - BAT67-V
4. Chemical industry: 4.1, Production of organic chemicals, such as: (d) nitrogenous hydrocarbons such as amines, amides, nitrous compounds, nitro compounds or nitrate compounds, nitriles, cyanates, isocyanates; Treat combined waste gas streams using a thermal oxidiser followed by caustic scrubbing; Reducing hydrogen chloride emissions to air. The BAT-AEL emission level is 2–10 mg/Nm3.
valid
2019-04-23
2019-04-23
LVOC-HCl-BAT76-IV
Production of Large Volume Organic Chemicals - HCl - BAT76-IV
4. Chemical industry: 4.1, Production of organic chemicals, such as: (f) halogenic hydrocarbons; treat the combined waste gas streams from EDC and/or VCM production by using a thermal oxidiser followed by two-stage wet scrubbing; Reducing hydrogen chloride emissions to air. The BAT-AEL emission level is 2–10 mg/Nm3, at 11 vol-% O2.
valid
2019-04-23
2019-04-23
LVOC-HCl-BAT77-IV
Production of Large Volume Organic Chemicals - HCl - BAT77-IV
4. Chemical industry: 4.1, Production of organic chemicals, such as: (f) halogenic hydrocarbons; treat the combined waste gas streams from EDC and/or VCM production by using a thermal oxidiser followed by two-stage wet scrubbing; Reducing hydrogen chloride emissions to air. The BAT-AEL emission level is 2–10 mg/Nm3, at 11 vol-% O2.
valid
2019-04-23
2019-04-23
LVOC-NH3-BAT4-III
Production of Large Volume Organic Chemicals - NH3 - BAT4-III
4. Chemical industry: 4.1, Production of organic chemicals, such as: (a) simple hydrocarbons (linear or cyclic, saturated or unsaturated, aliphatic or aromatic); Techniques (a)-(h) (see table) and optimise the design and/or operation of SCR or SNCR; Reducing ammonia (NH3) emissions to air. The BAT-AEL emission level is < 5–15 mg/Nm³, at 3 vol-% O2.
valid
2019-04-23
2019-04-23
LVOC-NOx-BAT4-I
Production of Large Volume Organic Chemicals - NOx - BAT4-I
4. Chemical industry: 4.1, Production of organic chemicals, such as: (a) simple hydrocarbons (linear or cyclic, saturated or unsaturated, aliphatic or aromatic); Techniques (a)-(h) (see table) and optimise the design and/or operation of SCR or SNCR for New furnace; Reducing nitrogen oxides (NOx) emissions to air. The BAT-AEL emission level is 60–100 mg/Nm³, at 3 vol-% O2.
valid
2019-04-23
2019-04-23
LVOC-NOx-BAT4-II
Production of Large Volume Organic Chemicals - NOx - BAT4-II
4. Chemical industry: 4.1, Production of organic chemicals, such as: (a) simple hydrocarbons (linear or cyclic, saturated or unsaturated, aliphatic or aromatic); Techniques (a)-(h) (see table) and optimise the design and/or operation of SCR or SNCR for Existing furnace; Reducing nitrogen oxides (NOx) emissions to air. The BAT-AEL emission level is 70–200 mg/Nm³, at 3 vol-% O2.
valid
2019-04-23
2019-04-23
LVOC-PCDD.F-BAT66-VI
Production of Large Volume Organic Chemicals - PCDD.F - BAT66-VI
4. Chemical industry: 4.1, Production of organic chemicals, such as: (d) nitrogenous hydrocarbons such as amines, amides, nitrous compounds, nitro compounds or nitrate compounds, nitriles, cyanates, isocyanates; Treat combined waste gas streams using a thermal oxidiser followed by caustic scrubbing; Reducing PCDD/F emissions to air. The BAT-AEL emission level is 0,025–0,08 ng I-TEQ/Nm3 .
valid
2019-04-23
2019-04-23
LVOC-PCDD.F-BAT67-VI
Production of Large Volume Organic Chemicals - PCDD.F - BAT67-VI
4. Chemical industry: 4.1, Production of organic chemicals, such as: (d) nitrogenous hydrocarbons such as amines, amides, nitrous compounds, nitro compounds or nitrate compounds, nitriles, cyanates, isocyanates; Treat combined waste gas streams using a thermal oxidiser followed by caustic scrubbing; Reducing PCDD/F emissions to air. The BAT-AEL emission level is 0,025–0,08 ng I-TEQ/Nm3 .
valid
2019-04-23
2019-04-23
LVOC-PCDD.F-BAT76-V
Production of Large Volume Organic Chemicals - PCDD.F - BAT76-V
4. Chemical industry: 4.1, Production of organic chemicals, such as: (f) halogenic hydrocarbons; treat the combined waste gas streams from EDC and/or VCM production by using a thermal oxidiser followed by two-stage wet scrubbing; Reducing PCDD/F emissions to air. The BAT-AEL emission level is 0,025–0,08 ng I-TEQ/Nm3.
valid
2019-04-23
2019-04-23
LVOC-PCDD.F-BAT77-V
Production of Large Volume Organic Chemicals - PCDD.F - BAT77-V
4. Chemical industry: 4.1, Production of organic chemicals, such as: (f) halogenic hydrocarbons; treat the combined waste gas streams from EDC and/or VCM production by using a thermal oxidiser followed by two-stage wet scrubbing; Reducing PCDD/F emissions to air. The BAT-AEL emission level is 0,025–0,08 ng I-TEQ/Nm3.
valid
2019-04-23
2019-04-23
LVOC-PCDD.F-BAT80-III
Production of Large Volume Organic Chemicals - PCDD.F - BAT80-III
4. Chemical industry: 4.1, Production of organic chemicals, such as: (f) halogenic hydrocarbons Reducing PCDD/F to water. The BAT-AEL emission level is 0,1– 0,3 µg I-TEQ/t EDC produced by oxychlorination .
valid
2019-04-23
2019-04-23
LVOC-TVOC-BAT45-I
Production of Large Volume Organic Chemicals - TVOC - BAT45-I
4. Chemical industry: 4.1, Production of organic chemicals, such as: (b) oxygen-containing hydrocarbons such as alcohols, aldehydes, ketones, carboxylic acids, esters and mixtures of esters, acetates, ethers, peroxides and epoxy resins; Techniques (a)-(c) (see table); Reducing TVOC emissions to air. The BAT-AEL emission level is < 5–30 mg/Nm3.
valid
2019-04-23
2019-04-23
LVOC-TVOC-BAT51
Production of Large Volume Organic Chemicals - TVOC - BAT51
4. Chemical industry: 4.1, Production of organic chemicals, such as: (b) oxygen-containing hydrocarbons such as alcohols, aldehydes, ketones, carboxylic acids, esters and mixtures of esters, acetates, ethers, peroxides and epoxy resins; Techniques (a)-(c) (see table); Reducing TVOC emissions to air. The BAT-AEL emission level is 1–10 g/t of EO produced .
valid
2019-04-23
2019-04-23
LVOC-TVOC-BAT57-II
Production of Large Volume Organic Chemicals - TVOC - BAT57-II
4. Chemical industry: 4.1, Production of organic chemicals, such as: (b) oxygen-containing hydrocarbons such as alcohols, aldehydes, ketones, carboxylic acids, esters and mixtures of esters, acetates, ethers, peroxides and epoxy resins; Techniques (a)-(d) (see table); Reducing TVOC emissions to air. The BAT-AEL emission level is 5–30 mg/Nm3.
valid
2019-04-23
2019-04-23
LVOC-TVOC-BAT66-I
Production of Large Volume Organic Chemicals - TVOC - BAT66-I
4. Chemical industry: 4.1, Production of organic chemicals, such as: (d) nitrogenous hydrocarbons such as amines, amides, nitrous compounds, nitro compounds or nitrate compounds, nitriles, cyanates, isocyanates; Treat combined waste gas streams using a thermal oxidiser followed by caustic scrubbing; Reducing TVOC emissions to air. The BAT-AEL emission level is 1–5 mg/Nm3.
valid
2019-04-23
2019-04-23
LVOC-TVOC-BAT67-I
Production of Large Volume Organic Chemicals - TVOC - BAT67-I
4. Chemical industry: 4.1, Production of organic chemicals, such as: (d) nitrogenous hydrocarbons such as amines, amides, nitrous compounds, nitro compounds or nitrate compounds, nitriles, cyanates, isocyanates; Treat combined waste gas streams using a thermal oxidiser followed by caustic scrubbing; Reducing TVOC emissions to air. The BAT-AEL emission level is 1–5 mg/Nm3.
valid
2019-04-23
2019-04-23
LVOC-TVOC-BAT76-I
Production of Large Volume Organic Chemicals - TVOC - BAT76-I
4. Chemical industry: 4.1, Production of organic chemicals, such as: (f) halogenic hydrocarbons; treat the combined waste gas streams from EDC and/or VCM production by using a thermal oxidiser followed by two-stage wet scrubbing; Reducing TVOC emissions to air. The BAT-AEL emission level is 0,5–5 mg/Nm3, at 11 vol-% O2.
valid
2019-04-23
2019-04-23
LVOC-TVOC-BAT77-I
Production of Large Volume Organic Chemicals - TVOC - BAT77-I
4. Chemical industry: 4.1, Production of organic chemicals, such as: (f) halogenic hydrocarbons; treat the combined waste gas streams from EDC and/or VCM production by using a thermal oxidiser followed by two-stage wet scrubbing; Reducing TVOC emissions to air. The BAT-AEL emission level is 0,5–5 mg/Nm3, at 11 vol-% O2.
valid
2019-04-23
2019-04-23
LVOC-TVOC-BAT86
Production of Large Volume Organic Chemicals - TVOC - BAT86
4. Chemical industry: 4.2. Production of inorganic chemicals, such as: (e) non-metals, metal oxides or other inorganic compounds such as calcium carbide, silicon, silicon carbide; Techniques (a)-(d) (see table); Reducing TVOC emissions to air. The BAT-AEL emission level is 5–25 mg/Nm3 .
valid
2019-04-23
2019-04-23
LVOC-Tetrachloromethane-BAT66-II
Production of Large Volume Organic Chemicals - Tetrachloromethane - BAT66-II
4. Chemical industry: 4.1, Production of organic chemicals, such as: (d) nitrogenous hydrocarbons such as amines, amides, nitrous compounds, nitro compounds or nitrate compounds, nitriles, cyanates, isocyanates; Treat combined waste gas streams using a thermal oxidiser followed by caustic scrubbing; Reducing tertachloromethane emissions to air. The BAT-AEL emission level is ≤ 0,5 g/t MDI produced .
valid
2019-04-23
2019-04-23
LVOC-Tetrachloromethane-BAT66-III
Production of Large Volume Organic Chemicals - Tetrachloromethane - BAT66-III
4. Chemical industry: 4.1, Production of organic chemicals, such as: (d) nitrogenous hydrocarbons such as amines, amides, nitrous compounds, nitro compounds or nitrate compounds, nitriles, cyanates, isocyanates; Treat combined waste gas streams using a thermal oxidiser followed by caustic scrubbing; Reducing tertachloromethane emissions to air. The BAT-AEL emission level is ≤ 0,7 g/t TDI produced .
valid
2019-04-23
2019-04-23
LVOC-Tetrachloromethane-BAT67-II
Production of Large Volume Organic Chemicals - Tetrachloromethane - BAT67-II
4. Chemical industry: 4.1, Production of organic chemicals, such as: (d) nitrogenous hydrocarbons such as amines, amides, nitrous compounds, nitro compounds or nitrate compounds, nitriles, cyanates, isocyanates; Treat combined waste gas streams using a thermal oxidiser followed by caustic scrubbing; Reducing tertachloromethane emissions to air. The BAT-AEL emission level is ≤ 0,5 g/t MDI produced .
valid
2019-04-23
2019-04-23
LVOC-Tetrachloromethane-BAT67-III
Production of Large Volume Organic Chemicals - Tetrachloromethane - BAT67-III
4. Chemical industry: 4.1, Production of organic chemicals, such as: (d) nitrogenous hydrocarbons such as amines, amides, nitrous compounds, nitro compounds or nitrate compounds, nitriles, cyanates, isocyanates; Treat combined waste gas streams using a thermal oxidiser followed by caustic scrubbing; Reducing tertachloromethane emissions to air. The BAT-AEL emission level is ≤ 0,7 g/t TDI produced .
valid
2019-04-23
2019-04-23
NFM-Ag-BAT17-I
Non-Ferrous Metals industries - Ag - BAT17-I
2, Production and processing of metals: 2.5, Processing of non-ferrous metals Reducing mercury to water. The BAT-AEL emission level is ≤ 0,6 mg/l.
valid
2019-04-23
2019-04-23
NFM-As-BAT17-II
Non-Ferrous Metals industries - As - BAT17-II
2, Production and processing of metals: 2.5, Processing of non-ferrous metals Reducing arsenic to water. The BAT-AEL emission level is ≤ 0,1 mg/l.
valid
2019-04-23
2019-04-23
NFM-As-BAT17-III
Non-Ferrous Metals industries - As - BAT17-III
2, Production and processing of metals: 2.5, Processing of non-ferrous metals Reducing arsenic to water. The BAT-AEL emission level is ≤ 0,3 mg/l.
valid
2019-04-23
2019-04-23
NFM-AsH3SbH3-BAT114-III
Non-Ferrous Metals industries - AsH3SbH3 - BAT114-III
2, Production and processing of metals: 2.5: Processing of non-ferrous metals: (a) production of non-ferrous crude metals from ore, concentrates or secondary raw materials by metallurgical, chemical or electrolytic processes; Techniques (a)-(c) (see table incl. footnote); Reducing arsenic and antimony emissions to air. The BAT-AEL emission level is ≤ 0,5 mg/Nm3.
valid
2019-04-23
2019-04-23
NFM-BaP-BAT178-II
Non-Ferrous Metals industries - BaP - BAT178-II
6. Other activities: 6.8: Production of carbon (hard-burnt coal) or electrographite by means of incineration or graphitisation; Bag filter; Reducing benzo[a]pyrene emissions to air. The BAT-AEL emission level is ≤ 0,01 mg/Nm3.
valid
2019-04-23
2019-04-23
NFM-BaP-BAT179-II
Non-Ferrous Metals industries - BaP - BAT179-II
6. Other activities: 6.8: Production of carbon (hard-burnt coal) or electrographite by means of incineration or graphitisation; Techniques (a)-(d) (see table incl. footnote); Reducing benzo[a]pyrene emissions to air. The BAT-AEL emission level is 0,001-0,01 mg/Nm3.
valid
2019-04-23
2019-04-23
NFM-BaP-BAT180-II
Non-Ferrous Metals industries - BaP - BAT180-II
6. Other activities: 6.8: Production of carbon (hard-burnt coal) or electrographite by means of incineration or graphitisation; Techniques (a)-(c) (see table incl. footnote); Reducing benzo[a]pyrene emissions to air. The BAT-AEL emission level is 0,005-0,015 mg/Nm3.
valid
2019-04-23
2019-04-23
NFM-BaP-BAT181-II
Non-Ferrous Metals industries - BaP - BAT181-II
6. Other activities: 6.8: Production of carbon (hard-burnt coal) or electrographite by means of incineration or graphitisation; Techniques (a)-(c) (see table incl. footnote); Reducing benzo[a]pyrene emissions to air. The BAT-AEL emission level is 0,001-0,01 mg/Nm3.
valid
2019-04-23
2019-04-23
NFM-BaP-BAT59-II
Non-Ferrous Metals industries - BaP - BAT59-II
2, Production and processing of metals: 2.5, Processing of non-ferrous metals: (a) production of non-ferrous crude metals from ore, concentrates or secondary raw materials by metallurgical, chemical or electrolytic processes; Techniques (a)-(c) (see table incl. footnote) in a paste plant (hot pitch storage, paste mixing, cooling and forming); Reducing benzo[a]pyrene emissions to air. The BAT-AEL emission level is 0,001 - 0,01 mg/Nm3.
valid
2019-04-23
2019-04-23
NFM-BaP-BAT60-II
Non-Ferrous Metals industries - BaP - BAT60-II
2, Production and processing of metals: 2.5, Processing of non-ferrous metals: (a) production of non-ferrous crude metals from ore, concentrates or secondary raw materials by metallurgical, chemical or electrolytic processes; Techniques (a)-(d) (see table incl. footnote); Reducing benzo[a]pyrene emissions to air. The BAT-AEL emission level is 0,001-0,01 mg/Nm3.
valid
2019-04-23
2019-04-23
NFM-BaP-BAT61-II
Non-Ferrous Metals industries - BaP - BAT61-II
2, Production and processing of metals: 2.5, Processing of non-ferrous metals: (a) production of non-ferrous crude metals from ore, concentrates or secondary raw materials by metallurgical, chemical or electrolytic processes; Use a pre-filtration unit and a regenerative thermal oxidiser followed by a dry scrubber (e.g. lime bed); Reducing benzo[a]pyrene emissions to air. The BAT-AEL emission level is 0,001-0,01 mg/Nm3.
valid
2019-04-23
2019-04-23
NFM-CO-BAT17-VII
Non-Ferrous Metals industries - CO - BAT17-VII
2, Production and processing of metals: 2.5, Processing of non-ferrous metals Reducing silver to water. The BAT-AEL emission level is ≤ 0,1 mg/l.
valid
2019-04-23
2019-04-23
NFM-CO-BAT17-VIII
Non-Ferrous Metals industries - CO - BAT17-VIII
2, Production and processing of metals: 2.5, Processing of non-ferrous metals Reducing silver to water. The BAT-AEL emission level is 0,1-0,5 mg/l.
valid
2019-04-23
2019-04-23
NFM-Cd-BAT132-II
Non-Ferrous Metals industries - Cd - BAT132-II
2, Production and processing of metals: 2.5, Processing of non-ferrous metals: (b) melting, including the alloyage, of non-ferrous metals, including recovered products and operation of non-ferrous metal foundries, with a melting capacity exceeding 4 tonnes per day for lead and cadmium or 20 tonnes per day for all other metals; Techniques (a)-(c) (see table incl. footnote); Reducing cadmium emissions to air. The BAT-AEL emission level is ≤ 0,1 mg/Nm3.
valid
2019-04-23
2019-04-23
NFM-Cd-BAT17-IV
Non-Ferrous Metals industries - Cd - BAT17-IV
2, Production and processing of metals: 2.5, Processing of non-ferrous metals Reducing cadmium to water. The BAT-AEL emission level is 0,02–0,1 mg/l.
valid
2019-04-23
2019-04-23
NFM-Cd-BAT17-V
Non-Ferrous Metals industries - Cd - BAT17-V
2, Production and processing of metals: 2.5, Processing of non-ferrous metals Reducing cadmium to water. The BAT-AEL emission level is ≤ 0,1 mg/l.
valid
2019-04-23
2019-04-23
NFM-Cd-BAT17-VI
Non-Ferrous Metals industries - Cd - BAT17-VI
2, Production and processing of metals: 2.5, Processing of non-ferrous metals Reducing cadmium to water. The BAT-AEL emission level is ≤ 0,05 mg/l.
valid
2019-04-23
2019-04-23
NFM-Cl2-BAT144-II
Non-Ferrous Metals industries - Cl2 - BAT144-II
2, Production and processing of metals: 2.5, Processing of non-ferrous metals: (a) production of non-ferrous crude metals from ore, concentrates or secondary raw materials by metallurgical, chemical or electrolytic processes; Alkaline scrubber; Reducing chlorides emissions to air. The BAT-AEL emission level is 0,5-2 mg/Nm3.
valid
2019-04-23
2019-04-23
NFM-Cl2-BAT172-II
Non-Ferrous Metals industries - Cl2 - BAT172-II
2, Production and processing of metals: 2.5, Processing of non-ferrous metals: (a) production of non-ferrous crude metals from ore, concentrates or secondary raw materials by metallurgical, chemical or electrolytic processes; Wet scrubber; Reducing chlorides emissions to air. The BAT-AEL emission level is ≤ 1 mg/Nm3.
valid
2019-04-23
2019-04-23
NFM-Cl2-BAT84-II
Non-Ferrous Metals industries - Cl2 - BAT84-II
2, Production and processing of metals: 2.5, Processing of non-ferrous metals: (b) melting, including the alloyage, of non-ferrous metals, including recovered products and operation of non-ferrous metal foundries, with a melting capacity exceeding 4 tonnes per day for lead and cadmium or 20 tonnes per day for all other metals; Techniques (a)-(d) (see table); Reducing chlorides emissions to air. The BAT-AEL emission level is ≤ 1 mg/Nm3.
valid
2019-04-23
2019-04-23
NFM-Cr-BAT17-IX
Non-Ferrous Metals industries - Cr - BAT17-IX
2, Production and processing of metals: 2.5, Processing of non-ferrous metals Reducing cobalt to water. The BAT-AEL emission level is ≤ 0,2 mg/l.
valid
2019-04-23
2019-04-23
NFM-Cr-BAT17-X
Non-Ferrous Metals industries - Cr - BAT17-X
2, Production and processing of metals: 2.5, Processing of non-ferrous metals Reducing chromium to water. The BAT-AEL emission level is ≤ 0,05 mg/l.
valid
2019-04-23
2019-04-23
NFM-Cu-BAT17-XI
Non-Ferrous Metals industries - Cu - BAT17-XI
2, Production and processing of metals: 2.5, Processing of non-ferrous metals Reducing copper to water. The BAT-AEL emission level is 0,05-0,5 mg/l.
valid
2019-04-23
2019-04-23
NFM-Cu-BAT17-XII
Non-Ferrous Metals industries - Cu - BAT17-XII
2, Production and processing of metals: 2.5, Processing of non-ferrous metals Reducing copper to water. The BAT-AEL emission level is ≤ 0,2 mg/l.
valid
2019-04-23
2019-04-23
NFM-Cu-BAT17-XIII
Non-Ferrous Metals industries - Cu - BAT17-XIII
2, Production and processing of metals: 2.5, Processing of non-ferrous metals Reducing copper to water. The BAT-AEL emission level is ≤ 0,1 mg/l.
valid
2019-04-23
2019-04-23
NFM-Cu-BAT17-XIV
Non-Ferrous Metals industries - Cu - BAT17-XIV
2, Production and processing of metals: 2.5, Processing of non-ferrous metals Reducing copper to water. The BAT-AEL emission level is ≤ 0,3 mg/l.
valid
2019-04-23
2019-04-23
NFM-Cu-BAT17-XV
Non-Ferrous Metals industries - Cu - BAT17-XV
2, Production and processing of metals: 2.5, Processing of non-ferrous metals Reducing copper to water. The BAT-AEL emission level is ≤ 0,5 mg/l.
valid
2019-04-23
2019-04-23
NFM-Dust-BAT113
Non-Ferrous Metals industries - Dust - BAT113
2, Production and processing of metals: 2.5: Processing of non-ferrous metals; Bag filter; Reducing dust emissions to air. The BAT-AEL emission level is ≤ 5 mg/Nm3.
valid
2019-04-23
2019-04-23
NFM-Dust-BAT119
Non-Ferrous Metals industries - Dust - BAT119
2, Production and processing of metals: 2.5, Processing of non-ferrous metals: (a) production of non-ferrous crude metals from ore, concentrates or secondary raw materials by metallurgical, chemical or electrolytic processes; Bag filter; Reducing dust emissions to air. The BAT-AEL emission level is 2 - 5 mg/Nm3.
valid
2019-04-23
2019-04-23
NFM-Dust-BAT121
Non-Ferrous Metals industries - Dust - BAT121
2, Production and processing of metals: 2.5, Processing of non-ferrous metals; Bag filter; Reducing dust emissions to air. The BAT-AEL emission level is ≤ 5 mg/Nm3.
valid
2019-04-23
2019-04-23
NFM-Dust-BAT122
Non-Ferrous Metals industries - Dust - BAT122
2, Production and processing of metals: 2.5, Processing of non-ferrous metals: (b) melting, including the alloyage, of non-ferrous metals, including recovered products and operation of non-ferrous metal foundries, with a melting capacity exceeding 4 tonnes per day for lead and cadmium or 20 tonnes per day for all other metals; Bag filter; Reducing dust emissions to air. The BAT-AEL emission level is 2 - 5 mg/Nm3.
valid
2019-04-23
2019-04-23
NFM-Dust-BAT128
Non-Ferrous Metals industries - Dust - BAT128
2, Production and processing of metals: 2.5, Processing of non-ferrous metals: (b) melting, including the alloyage, of non-ferrous metals, including recovered products and operation of non-ferrous metal foundries, with a melting capacity exceeding 4 tonnes per day for lead and cadmium or 20 tonnes per day for all other metals; Bag filter; Reducing dust emissions to air. The BAT-AEL emission level is ≤ 5 mg/Nm3.
valid
2019-04-23
2019-04-23
NFM-Dust-BAT132-I
Non-Ferrous Metals industries - Dust - BAT132-I
2, Production and processing of metals: 2.5, Processing of non-ferrous metals: (b) melting, including the alloyage, of non-ferrous metals, including recovered products and operation of non-ferrous metal foundries, with a melting capacity exceeding 4 tonnes per day for lead and cadmium or 20 tonnes per day for all other metals; Techniques (a)-(c) (see table incl. footnote); Reducing dust emissions to air. The BAT-AEL emission level is 2 - 3 mg/Nm3.
valid
2019-04-23
2019-04-23
NFM-Dust-BAT140
Non-Ferrous Metals industries - Dust - BAT140
2, Production and processing of metals: 2.5, Processing of non-ferrous metals: (a) production of non-ferrous crude metals from ore, concentrates or secondary raw materials by metallurgical, chemical or electrolytic processes; Techniques (a)-(b) (see table incl. footnote); Reducing dust emissions to air. The BAT-AEL emission level is 2 - 5 mg/Nm3.
valid
2019-04-23
2019-04-23
NFM-Dust-BAT158-I
Non-Ferrous Metals industries - Dust - BAT158-I
2, Production and processing of metals: 2.5, Processing of non-ferrous metals: (a) production of non-ferrous crude metals from ore, concentrates or secondary raw materials by metallurgical, chemical or electrolytic processes; Bag filter; Reducing dust emissions to air. The BAT-AEL emission level is 2 - 5 mg/Nm3.
valid
2019-04-23
2019-04-23
NFM-Dust-BAT158-II
Non-Ferrous Metals industries - Dust - BAT158-II
2, Production and processing of metals: 2.5, Processing of non-ferrous metals: (a) production of non-ferrous crude metals from ore, concentrates or secondary raw materials by metallurgical, chemical or electrolytic processes; Bag filter; Reducing dust emissions to air. The BAT-AEL emission level is 2 - 5 mg/Nm3.
valid
2019-04-23
2019-04-23
NFM-Dust-BAT158-III
Non-Ferrous Metals industries - Dust - BAT158-III
2, Production and processing of metals: 2.5, Processing of non-ferrous metals: (a) production of non-ferrous crude metals from ore, concentrates or secondary raw materials by metallurgical, chemical or electrolytic processes; Bag filter; Reducing dust emissions to air. The BAT-AEL emission level is 2 - 5 mg/Nm3.
valid
2019-04-23
2019-04-23
NFM-Dust-BAT158-IV
Non-Ferrous Metals industries - Dust - BAT158-IV
2, Production and processing of metals: 2.5, Processing of non-ferrous metals: (a) production of non-ferrous crude metals from ore, concentrates or secondary raw materials by metallurgical, chemical or electrolytic processes; Bag filter; Reducing dust emissions to air. The BAT-AEL emission level is 2 - 5 mg/Nm3.
valid
2019-04-23
2019-04-23
NFM-Dust-BAT171
Non-Ferrous Metals industries - Dust - BAT171
2, Production and processing of metals: 2.5, Processing of non-ferrous metals: (a) production of non-ferrous crude metals from ore, concentrates or secondary raw materials by metallurgical, chemical or electrolytic processes; Bag filter or a combination of an ESP and a bag filter; Reducing dust emissions to air. The BAT-AEL emission level is 2 - 5 mg/Nm3.
valid
2019-04-23
2019-04-23
NFM-Dust-BAT178-I
Non-Ferrous Metals industries - Dust - BAT178-I
6. Other activities: 6.8: Production of carbon (hard-burnt coal) or electrographite by means of incineration or graphitisation; Bag filter; Reducing dust emissions to air. The BAT-AEL emission level is 2 - 5 mg/Nm3.
valid
2019-04-23
2019-04-23
NFM-Dust-BAT179-I
Non-Ferrous Metals industries - Dust - BAT179-I
6. Other activities: 6.8: Production of carbon (hard-burnt coal) or electrographite by means of incineration or graphitisation; Techniques (a)-(d) (see table incl. footnote); Reducing dust emissions to air. The BAT-AEL emission level is 2 - 10 mg/Nm3.
valid
2019-04-23
2019-04-23
NFM-Dust-BAT180-I
Non-Ferrous Metals industries - Dust - BAT180-I
6. Other activities: 6.8: Production of carbon (hard-burnt coal) or electrographite by means of incineration or graphitisation; Techniques (a)-(c) (see table incl. footnote); Reducing dust emissions to air. The BAT-AEL emission level is 2 - 10 mg/Nm3.
valid
2019-04-23
2019-04-23
NFM-Dust-BAT181-I
Non-Ferrous Metals industries - Dust - BAT181-I
6. Other activities: 6.8: Production of carbon (hard-burnt coal) or electrographite by means of incineration or graphitisation; Techniques (a)-(c) (see table incl. footnote); Reducing dust emissions to air. The BAT-AEL emission level is 2 - 10 mg/Nm3.
valid
2019-04-23
2019-04-23
NFM-Dust-BAT37
Non-Ferrous Metals industries - Dust - BAT37
2, Production and processing of metals: 2.5, Processing of non-ferrous metals: (b) melting, including the alloyage, of non-ferrous metals, including recovered products and operation of non-ferrous metal foundries, with a melting capacity exceeding 4 tonnes per day for lead and cadmium or 20 tonnes per day for all other metals; Bag filter for reception, storage, handling, transport, metering, mixing, blending, crushing, drying, cutting and screening of raw materials, and the pyrolytic treatment of copper turnings in primary and secondary copper production; Reducing dust emissions to air. The BAT-AEL emission level is 2 - 5 mg/Nm3.
valid
2019-04-23
2019-04-23
NFM-Dust-BAT38
Non-Ferrous Metals industries - Dust - BAT38
2, Production and processing of metals: 2.5, Processing of non-ferrous metals: (b) melting, including the alloyage, of non-ferrous metals, including recovered products and operation of non-ferrous metal foundries, with a melting capacity exceeding 4 tonnes per day for lead and cadmium or 20 tonnes per day for all other metals; Bag filter for concentrate drying in primary copper production; Reducing dust emissions to air. The BAT-AEL emission level is 3 - 5 mg/Nm3.
valid
2019-04-23
2019-04-23
NFM-Dust-BAT39
Non-Ferrous Metals industries - Dust - BAT39
2, Production and processing of metals: 2.5, Processing of non-ferrous metals: (b) melting, including the alloyage, of non-ferrous metals, including recovered products and operation of non-ferrous metal foundries, with a melting capacity exceeding 4 tonnes per day for lead and cadmium or 20 tonnes per day for all other metals; Bag filter and/or a wet scrubber for primary copper smelter and converter (emissions other than those that are routed to the sulphuric acid or liquid SO 2 plant or power plant); Reducing dust emissions to air. The BAT-AEL emission level is 2 - 5 mg/Nm3.
valid
2019-04-23
2019-04-23
NFM-Dust-BAT40
Non-Ferrous Metals industries - Dust - BAT40
2, Production and processing of metals: 2.5, Processing of non-ferrous metals: (b) melting, including the alloyage, of non-ferrous metals, including recovered products and operation of non-ferrous metal foundries, with a melting capacity exceeding 4 tonnes per day for lead and cadmium or 20 tonnes per day for all other metals; Bag filter for secondary copper smelter and converter and processing of secondary copper intermediates (emissions other than those that are routed to the sulphuric acid plant); Reducing dust emissions to air. The BAT-AEL emission level is 2 - 4 mg/Nm3.
valid
2019-04-23
2019-04-23
NFM-Dust-BAT41
Non-Ferrous Metals industries - Dust - BAT41
2, Production and processing of metals: 2.5, Processing of non-ferrous metals: (b) melting, including the alloyage, of non-ferrous metals, including recovered products and operation of non-ferrous metal foundries, with a melting capacity exceeding 4 tonnes per day for lead and cadmium or 20 tonnes per day for all other metals; Bag filter for secondary copper holding furnace; Reducing dust emissions to air. The BAT-AEL emission level is ≤ 5 mg/Nm3.
valid
2019-04-23
2019-04-23
NFM-Dust-BAT42
Non-Ferrous Metals industries - Dust - BAT42
2, Production and processing of metals: 2.5, Processing of non-ferrous metals: (b) melting, including the alloyage, of non-ferrous metals, including recovered products and operation of non-ferrous metal foundries, with a melting capacity exceeding 4 tonnes per day for lead and cadmium or 20 tonnes per day for all other metals; Bag filter or a scrubber in combination with an ESP for copper-rich slag furnace processing; Reducing dust emissions to air. The BAT-AEL emission level is 2 - 5 mg/Nm3.
valid
2019-04-23
2019-04-23
NFM-Dust-BAT43
Non-Ferrous Metals industries - Dust - BAT43
2, Production and processing of metals: 2.5, Processing of non-ferrous metals: (b) melting, including the alloyage, of non-ferrous metals, including recovered products and operation of non-ferrous metal foundries, with a melting capacity exceeding 4 tonnes per day for lead and cadmium or 20 tonnes per day for all other metals; Bag filter or a scrubber in combination with an ESP for anode furnace (in primary and secondary copper production); Reducing dust emissions to air. The BAT-AEL emission level is 2 - 5 mg/Nm3.
valid
2019-04-23
2019-04-23
NFM-Dust-BAT44
Non-Ferrous Metals industries - Dust - BAT44
2, Production and processing of metals: 2.5, Processing of non-ferrous metals: (b) melting, including the alloyage, of non-ferrous metals, including recovered products and operation of non-ferrous metal foundries, with a melting capacity exceeding 4 tonnes per day for lead and cadmium or 20 tonnes per day for all other metals; Bag filter or, in the case of off-gases with a water content close to the dew point, a wet scrubber or a demister for anode casting (in primary and secondary copper production); Reducing dust emissions to air. The BAT-AEL emission level is ≤ 5-15 mg/Nm3.
valid
2019-04-23
2019-04-23
NFM-Dust-BAT45
Non-Ferrous Metals industries - Dust - BAT45
2, Production and processing of metals: 2.5, Processing of non-ferrous metals: (b) melting, including the alloyage, of non-ferrous metals, including recovered products and operation of non-ferrous metal foundries, with a melting capacity exceeding 4 tonnes per day for lead and cadmium or 20 tonnes per day for all other metals; Bag filter for copper melting furnace; Reducing dust emissions to air. The BAT-AEL emission level is 2 - 5 mg/Nm3.
valid
2019-04-23
2019-04-23
NFM-Dust-BAT59-I
Non-Ferrous Metals industries - Dust - BAT59-I
2, Production and processing of metals: 2.5, Processing of non-ferrous metals: (a) production of non-ferrous crude metals from ore, concentrates or secondary raw materials by metallurgical, chemical or electrolytic processes; Techniques (a)-(c) (see table incl. footnote) in a a paste plant (hot pitch storage, paste mixing, cooling and forming, removing coke dust from operations such as coke storage and grindin); Reducing dust emissions to air. The BAT-AEL emission level is 2 - 5 mg/Nm3.
valid
2019-04-23
2019-04-23
NFM-Dust-BAT60-I
Non-Ferrous Metals industries - Dust - BAT60-I
2, Production and processing of metals: 2.5, Processing of non-ferrous metals: (a) production of non-ferrous crude metals from ore, concentrates or secondary raw materials by metallurgical, chemical or electrolytic processes; Techniques (a)-(d) (see table incl. footnote); Reducing dust emissions to air. The BAT-AEL emission level is 2 - 5 mg/Nm3.
valid
2019-04-23
2019-04-23
NFM-Dust-BAT61-I
Non-Ferrous Metals industries - Dust - BAT61-I
2, Production and processing of metals: 2.5, Processing of non-ferrous metals: (a) production of non-ferrous crude metals from ore, concentrates or secondary raw materials by metallurgical, chemical or electrolytic processes; Use a pre-filtration unit and a regenerative thermal oxidiser followed by a dry scrubber (e.g. lime bed); Reducing dust emissions to air. The BAT-AEL emission level is 2 - 5 mg/Nm3.
valid
2019-04-23
2019-04-23
NFM-Dust-BAT64-I
Non-Ferrous Metals industries - Dust - BAT64-I
2, Production and processing of metals: 2.5, Processing of non-ferrous metals: (a) production of non-ferrous crude metals from ore, concentrates or secondary raw materials by metallurgical, chemical or electrolytic processes; See three tables; Reducing dust emissions to air. The BAT-AEL emission level is ≤ 1,2 kg/t Al.
valid
2019-04-23
2019-04-23
NFM-Dust-BAT64-II
Non-Ferrous Metals industries - Dust - BAT64-II
2, Production and processing of metals: 2.5, Processing of non-ferrous metals: (a) production of non-ferrous crude metals from ore, concentrates or secondary raw materials by metallurgical, chemical or electrolytic processes; See three tables; Reducing dust emissions to air. The BAT-AEL emission level is ≤ 0,6 kg/t Al.
valid
2019-04-23
2019-04-23
NFM-Dust-BAT66
Non-Ferrous Metals industries - Dust - BAT66
2, Production and processing of metals: 2.5, Processing of non-ferrous metals: (a) production of non-ferrous crude metals from ore, concentrates or secondary raw materials by metallurgical, chemical or electrolytic processes; Bag filter; Reducing dust emissions to air. The BAT-AEL emission level is ≤ 5-10 mg/Nm3.
valid
2019-04-23
2019-04-23
NFM-Dust-BAT67-I
Non-Ferrous Metals industries - Dust - BAT67-I
2, Production and processing of metals: 2.5, Processing of non-ferrous metals: (a) production of non-ferrous crude metals from ore, concentrates or secondary raw materials by metallurgical, chemical or electrolytic processes; Techniques (a)-(b) (see table incl. footnote); Reducing dust emissions to air. The BAT-AEL emission level is 2 - 5 mg/Nm3.
valid
2019-04-23
2019-04-23
NFM-Dust-BAT68
Non-Ferrous Metals industries - Dust - BAT68
2, Production and processing of metals: 2.5, Processing of non-ferrous metals: (a) production of non-ferrous crude metals from ore, concentrates or secondary raw materials by metallurgical, chemical or electrolytic processes; Techniques (a)-(b) (see table incl. footnote); Reducing dust emissions to air. The BAT-AEL emission level is 2 - 25 mg/Nm3.
valid
2019-04-23
2019-04-23
NFM-Dust-BAT80
Non-Ferrous Metals industries - Dust - BAT80
2, Production and processing of metals: 2.5, Processing of non-ferrous metals: (a) production of non-ferrous crude metals from ore, concentrates or secondary raw materials by metallurgical, chemical or electrolytic processes; Bag filter; Reducing dust emissions to air. The BAT-AEL emission level is ≤ 5 mg/Nm3.
valid
2019-04-23
2019-04-23
NFM-Dust-BAT81
Non-Ferrous Metals industries - Dust - BAT81
2, Production and processing of metals: 2.5, Processing of non-ferrous metals: (b) melting, including the alloyage, of non-ferrous metals, including recovered products and operation of non-ferrous metal foundries, with a melting capacity exceeding 4 tonnes per day for lead and cadmium or 20 tonnes per day for all other metals; Bag filter; Reducing dust emissions to air. The BAT-AEL emission level is 2 - 5 mg/Nm3.
valid
2019-04-23
2019-04-23
NFM-Dust-BAT82
Non-Ferrous Metals industries - Dust - BAT82
2, Production and processing of metals: 2.5, Processing of non-ferrous metals: (b) melting, including the alloyage, of non-ferrous metals, including recovered products and operation of non-ferrous metal foundries, with a melting capacity exceeding 4 tonnes per day for lead and cadmium or 20 tonnes per day for all other metals; Techniques (a)-(c) (see table); Reducing dust emissions to air. The BAT-AEL emission level is 2 - 5 mg/Nm3.
valid
2019-04-23
2019-04-23
NFM-Dust-BAT88
Non-Ferrous Metals industries - Dust - BAT88
2, Production and processing of metals: 2.5, Processing of non-ferrous metals; Bag filter; Reducing dust emissions to air. The BAT-AEL emission level is 2 - 5 mg/Nm3.
valid
2019-04-23
2019-04-23
NFM-Dust-BAT94
Non-Ferrous Metals industries - Dust - BAT94
2, Production and processing of metals: 2.5, Processing of non-ferrous metals: (a) production of non-ferrous crude metals from ore, concentrates or secondary raw materials by metallurgical, chemical or electrolytic processes; Bag filter; Reducing dust emissions to air. The BAT-AEL emission level is ≤ 5 mg/Nm3.
valid
2019-04-23
2019-04-23
NFM-Dust-BAT95
Non-Ferrous Metals industries - Dust - BAT95
2, Production and processing of metals: 2.5, Processing of non-ferrous metals: (a) production of non-ferrous crude metals from ore, concentrates or secondary raw materials by metallurgical, chemical or electrolytic processes; Bag filter or a wet scrubber; Reducing dust emissions to air. The BAT-AEL emission level is ≤ 5 mg/Nm3.
valid
2019-04-23
2019-04-23
NFM-Dust-BAT96-I
Non-Ferrous Metals industries - Dust - BAT96-I
2, Production and processing of metals: 2.5: Processing of non-ferrous metals; Bag filter; Reducing dust emissions to air. The BAT-AEL emission level is 2 - 4 mg/Nm3.
valid
2019-04-23
2019-04-23
NFM-Dust-BAT97-I
Non-Ferrous Metals industries - Dust - BAT97-I
2, Production and processing of metals: 2.5, Processing of non-ferrous metals: (b) melting, including the alloyage, of non-ferrous metals, including recovered products and operation of non-ferrous metal foundries, with a melting capacity exceeding 4 tonnes per day for lead and cadmium or 20 tonnes per day for all other metals; Techniques (a)-(b) (see table); Reducing dust emissions to air. The BAT-AEL emission level is 2 - 4 mg/Nm3.
valid
2019-04-23
2019-04-23
NFM-F-BAT60-IV
Non-Ferrous Metals industries - F - BAT60-IV
2, Production and processing of metals: 2.5, Processing of non-ferrous metals: (a) production of non-ferrous crude metals from ore, concentrates or secondary raw materials by metallurgical, chemical or electrolytic processes; Techniques (a)-(d) (see table incl. footnote); Reducing total fluorides emissions to air. The BAT-AEL emission level is ≤ 0,8 mg/Nm3.
valid
2019-04-23
2019-04-23
NFM-F-BAT64-III
Non-Ferrous Metals industries - F - BAT64-III
2, Production and processing of metals: 2.5, Processing of non-ferrous metals: (a) production of non-ferrous crude metals from ore, concentrates or secondary raw materials by metallurgical, chemical or electrolytic processes; See three tables; Reducing total fluorides emissions to air. The BAT-AEL emission level is ≤ 0,6 kg/t Al.
valid
2019-04-23
2019-04-23
NFM-F-BAT64-IV
Non-Ferrous Metals industries - F - BAT64-IV
2, Production and processing of metals: 2.5, Processing of non-ferrous metals: (a) production of non-ferrous crude metals from ore, concentrates or secondary raw materials by metallurgical, chemical or electrolytic processes; See three tables; Reducing total fluorides emissions to air. The BAT-AEL emission level is ≤ 0,35 kg/t Al.
valid
2019-04-23
2019-04-23
NFM-F-BAT67-III
Non-Ferrous Metals industries - F - BAT67-III
2, Production and processing of metals: 2.5, Processing of non-ferrous metals: (a) production of non-ferrous crude metals from ore, concentrates or secondary raw materials by metallurgical, chemical or electrolytic processes; Techniques (a)-(b) (see table incl. footnote); Reducing total fluorides emissions to air. The BAT-AEL emission level is ≤ 1,5 mg/Nm3.
valid
2019-04-23
2019-04-23
NFM-H2S-BAT89-III
Non-Ferrous Metals industries - H2S - BAT89-III
2, Production and processing of metals: 2.5, Processing of non-ferrous metals; Techniques (a)-(c) (see table incl. footnote); Reducing hydrogen sulphide emissions to air. The BAT-AEL emission level is ≤ 2 mg/Nm3.
valid
2019-04-23
2019-04-23
NFM-H2SO4-BAT114-II
Non-Ferrous Metals industries - H2SO4 - BAT114-II
2, Production and processing of metals: 2.5: Processing of non-ferrous metals: (a) production of non-ferrous crude metals from ore, concentrates or secondary raw materials by metallurgical, chemical or electrolytic processes; Techniques (a)-(c) (see table incl. footnote); Reducing sulphuric acid emissions to air. The BAT-AEL emission level is < 10 mg/Nm3.
valid
2019-04-23
2019-04-23
NFM-HCl-BAT124-I
Non-Ferrous Metals industries - HCl - BAT124-I
2, Production and processing of metals: 2.5, Processing of non-ferrous metals: (b) melting, including the alloyage, of non-ferrous metals, including recovered products and operation of non-ferrous metal foundries, with a melting capacity exceeding 4 tonnes per day for lead and cadmium or 20 tonnes per day for all other metals; Techniques (a)-(b) (see table incl. footnote); Reducing hydrogen chloride emissions to air. The BAT-AEL emission level is ≤ 1,5 mg/Nm3.
valid
2019-04-23
2019-04-23
NFM-HCl-BAT144-I
Non-Ferrous Metals industries - HCl - BAT144-I
2, Production and processing of metals: 2.5, Processing of non-ferrous metals: (a) production of non-ferrous crude metals from ore, concentrates or secondary raw materials by metallurgical, chemical or electrolytic processes; Alkaline scrubber; Reducing hydrogen chloride emissions to air. The BAT-AEL emission level is ≤ 5-10 mg/Nm3.
valid
2019-04-23
2019-04-23
NFM-HCl-BAT84-I
Non-Ferrous Metals industries - HCl - BAT84-I
2, Production and processing of metals: 2.5, Processing of non-ferrous metals: (b) melting, including the alloyage, of non-ferrous metals, including recovered products and operation of non-ferrous metal foundries, with a melting capacity exceeding 4 tonnes per day for lead and cadmium or 20 tonnes per day for all other metals; Techniques (a)-(d) (see table); Reducing hydrogen chloride emissions to air. The BAT-AEL emission level is ≤ 5-10 mg/Nm3.
valid
2019-04-23
2019-04-23
NFM-HF-BAT124-II
Non-Ferrous Metals industries - HF - BAT124-II
2, Production and processing of metals: 2.5, Processing of non-ferrous metals: (b) melting, including the alloyage, of non-ferrous metals, including recovered products and operation of non-ferrous metal foundries, with a melting capacity exceeding 4 tonnes per day for lead and cadmium or 20 tonnes per day for all other metals; Techniques (a)-(b) (see table incl. footnote); Reducing hydrogen fluoride emissions to air. The BAT-AEL emission level is ≤ 0,3 mg/Nm3.
valid
2019-04-23
2019-04-23
NFM-HF-BAT60-III
Non-Ferrous Metals industries - HF - BAT60-III
2, Production and processing of metals: 2.5, Processing of non-ferrous metals: (a) production of non-ferrous crude metals from ore, concentrates or secondary raw materials by metallurgical, chemical or electrolytic processes; Techniques (a)-(d) (see table incl. footnote); Reducing hydrogen fluoride emissions to air. The BAT-AEL emission level is 0,3-0,5 mg/Nm3.
valid
2019-04-23
2019-04-23
NFM-HF-BAT61-III
Non-Ferrous Metals industries - HF - BAT61-III
2, Production and processing of metals: 2.5, Processing of non-ferrous metals: (a) production of non-ferrous crude metals from ore, concentrates or secondary raw materials by metallurgical, chemical or electrolytic processes; Use a pre-filtration unit and a regenerative thermal oxidiser followed by a dry scrubber (e.g. lime bed); Reducing hydrogen fluoride emissions to air. The BAT-AEL emission level is ≤ 3 mg/Nm3.
valid
2019-04-23
2019-04-23
NFM-HF-BAT67-II
Non-Ferrous Metals industries - HF - BAT67-II
2, Production and processing of metals: 2.5, Processing of non-ferrous metals: (a) production of non-ferrous crude metals from ore, concentrates or secondary raw materials by metallurgical, chemical or electrolytic processes; Techniques (a)-(b) (see table incl. footnote); Reducing hydrogen fluoride emissions to air. The BAT-AEL emission level is ≤ 1,0 mg/Nm3.
valid
2019-04-23
2019-04-23
NFM-HF-BAT84-III
Non-Ferrous Metals industries - HF - BAT84-III
2, Production and processing of metals: 2.5, Processing of non-ferrous metals: (b) melting, including the alloyage, of non-ferrous metals, including recovered products and operation of non-ferrous metal foundries, with a melting capacity exceeding 4 tonnes per day for lead and cadmium or 20 tonnes per day for all other metals; Techniques (a)-(d) (see table incl. footnote); Reducing hydrogen fluoride emissions to air. The BAT-AEL emission level is ≤ 1 mg/Nm3.
valid
2019-04-23
2019-04-23
NFM-Hg-BAT11
Non-Ferrous Metals industries - Hg - BAT11
2, Production and processing of metals: 2.1, Metal ore (including sulphide ore) roasting or sintering; 2.5, Processing of non-ferrous metals; Techniques: (a)-(b) (see table); Reducing sulphur dioxide (SO2) emissions to air. The BAT-AEL emission level is 0,01 - 0,05 mg/Nm3.
valid
2019-04-23
2019-04-23
NFM-Hg-BAT17-XVI
Non-Ferrous Metals industries - Hg - BAT17-XVI
2, Production and processing of metals: 2.5, Processing of non-ferrous metals Reducing mercury to water. The BAT-AEL emission level is 0,005–0,02 mg/l.
valid
2019-04-23
2019-04-23
NFM-Hg-BAT17-XVII
Non-Ferrous Metals industries - Hg - BAT17-XVII
2, Production and processing of metals: 2.5, Processing of non-ferrous metals Reducing mercury to water. The BAT-AEL emission level is ≤ 0,05 mg/l.
valid
2019-04-23
2019-04-23
NFM-NH3-BAT145
Non-Ferrous Metals industries - NH3 - BAT145
2, Production and processing of metals: 2.5, Processing of non-ferrous metals: (a) production of non-ferrous crude metals from ore, concentrates or secondary raw materials by metallurgical, chemical or electrolytic processes; Wet scrubber with sulphuric acid; Reducing ammonia (NH3) emissions to air. The BAT-AEL emission level is 1 - 3 mg/Nm3.
valid
2019-04-23
2019-04-23
NFM-NH3-BAT89-I
Non-Ferrous Metals industries - NH3 - BAT89-I
2, Production and processing of metals: 2.5, Processing of non-ferrous metals; Techniques (a)-(c) (see table incl. footnote); Reducing ammonia (NH3) emissions to air. The BAT-AEL emission level is ≤ 10 mg/Nm3.
valid
2019-04-23
2019-04-23
NFM-NOx-BAT141
Non-Ferrous Metals industries - NOx - BAT141
2, Production and processing of metals: 2.5, Processing of non-ferrous metals: (a) production of non-ferrous crude metals from ore, concentrates or secondary raw materials by metallurgical, chemical or electrolytic processes; Techniques (a)-(b) (see table incl. footnote); Reducing nitrogen oxides (NOx) emissions to air. The BAT-AEL emission level is 70 - 150 mg/Nm3.
valid
2019-04-23
2019-04-23
NFM-Ni-BAT17-XIX
Non-Ferrous Metals industries - Ni - BAT17-XIX
2, Production and processing of metals: 2.5, Processing of non-ferrous metals Reducing nickel to water. The BAT-AEL emission level is ≤ 0,1 mg/l.
valid
2019-04-23
2019-04-23
NFM-Ni-BAT17-XVIII
Non-Ferrous Metals industries - Ni - BAT17-XVIII
2, Production and processing of metals: 2.5, Processing of non-ferrous metals Reducing nickel to water. The BAT-AEL emission level is ≤ 0,5 mg/l.
valid
2019-04-23
2019-04-23
NFM-Ni-BAT17-XX
Non-Ferrous Metals industries - Ni - BAT17-XX
2, Production and processing of metals: 2.5, Processing of non-ferrous metals Reducing nickel to water. The BAT-AEL emission level is ≤ 2 mg/l.
valid
2019-04-23
2019-04-23
NFM-Ni-BAT172-I
Non-Ferrous Metals industries - Ni - BAT172-I
2, Production and processing of metals: 2.5, Processing of non-ferrous metals: (a) production of non-ferrous crude metals from ore, concentrates or secondary raw materials by metallurgical, chemical or electrolytic processes; Wet scrubber; Reducing nickel emissions to air. The BAT-AEL emission level is ≤ 1 mg/Nm3.
valid
2019-04-23
2019-04-23
NFM-Ni-BAT173
Non-Ferrous Metals industries - Ni - BAT173
2, Production and processing of metals: 2.5, Processing of non-ferrous metals: (a) production of non-ferrous crude metals from ore, concentrates or secondary raw materials by metallurgical, chemical or electrolytic processes; Bag filter; Reducing nickel emissions to air. The BAT-AEL emission level is ≤ 1 mg/Nm3.
valid
2019-04-23
2019-04-23
NFM-PCDD.F-BAT123-II
Non-Ferrous Metals industries - PCDD.F - BAT123-II
2, Production and processing of metals: 2.5, Processing of non-ferrous metals: (b) melting, including the alloyage, of non-ferrous metals, including recovered products and operation of non-ferrous metal foundries, with a melting capacity exceeding 4 tonnes per day for lead and cadmium or 20 tonnes per day for all other metals; Techniques (a)-(c) (see table incl. footnote); Reducing PCDD/F emissions to air. The BAT-AEL emission level is ≤ 0,1 ng I-TEQ/Nm3 .
valid
2019-04-23
2019-04-23
NFM-PCDD.F-BAT146
Non-Ferrous Metals industries - PCDD.F - BAT146
2, Production and processing of metals: 2.5, Processing of non-ferrous metals: (a) production of non-ferrous crude metals from ore, concentrates or secondary raw materials by metallurgical, chemical or electrolytic processes; Techniques (a)-(h) (see table incl. footnote); Reducing PCDD/F emissions to air. The BAT-AEL emission level is ≤ 0,1 ng I-TEQ/Nm3 .
valid
2019-04-23
2019-04-23
NFM-PCDD.F-BAT159
Non-Ferrous Metals industries - PCDD.F - BAT159
2, Production and processing of metals: 2.5, Processing of non-ferrous metals: (a) production of non-ferrous crude metals from ore, concentrates or secondary raw materials by metallurgical, chemical or electrolytic processes; Inject adsorbents and to use an ESP and/or a bag filter; Reducing PCDD/F emissions to air. The BAT-AEL emission level is ≤ 0,05 ng I-TEQ/Nm3.
valid
2019-04-23
2019-04-23
NFM-PCDD.F-BAT48
Non-Ferrous Metals industries - PCDD.F - BAT48
2, Production and processing of metals: 2.5, Processing of non-ferrous metals; Techniques (a)-(j) (see table incl. footnote); Reducing PCDD/F emissions to air. The BAT-AEL emission level is ≤ 0,1 ng I-TEQ/Nm3 .
valid
2019-04-23
2019-04-23
NFM-PCDD.F-BAT83-II
Non-Ferrous Metals industries - PCDD.F - BAT83-II
2, Production and processing of metals: 2.5, Processing of non-ferrous metals: (b) melting, including the alloyage, of non-ferrous metals, including recovered products and operation of non-ferrous metal foundries, with a melting capacity exceeding 4 tonnes per day for lead and cadmium or 20 tonnes per day for all other metals; Techniques (a)-(e) (see table); Reducing PCDD/F emissions to air. The BAT-AEL emission level is ≤ 0,1 ng I-TEQ/Nm3 .
valid
2019-04-23
2019-04-23
NFM-PCDD.F-BAT99
Non-Ferrous Metals industries - PCDD.F - BAT99
2, Production and processing of metals: 2.5, Processing of non-ferrous metals: (b) melting, including the alloyage, of non-ferrous metals, including recovered products and operation of non-ferrous metal foundries, with a melting capacity exceeding 4 tonnes per day for lead and cadmium or 20 tonnes per day for all other metals; Techniques (a)-(j) (see table incl. footnote); Reducing PCDD/F emissions to air. The BAT-AEL emission level is ≤ 0,1 ng I-TEQ/Nm3 .
valid
2019-04-23
2019-04-23
NFM-PH3-BAT89-II
Non-Ferrous Metals industries - PH3 - BAT89-II
2, Production and processing of metals: 2.5, Processing of non-ferrous metals; Techniques (a)-(c) (see table incl. footnote); Reducing phosphene emissions to air. The BAT-AEL emission level is ≤ 0,5 mg/Nm3.
valid
2019-04-23
2019-04-23
NFM-Pb-BAT17-XXI
Non-Ferrous Metals industries - Pb - BAT17-XXI
2, Production and processing of metals: 2.5, Processing of non-ferrous metals Reducing lead to water. The BAT-AEL emission level is ≤ 0,5 mg/l.
valid
2019-04-23
2019-04-23
NFM-Pb-BAT17-XXII
Non-Ferrous Metals industries - Pb - BAT17-XXII
2, Production and processing of metals: 2.5, Processing of non-ferrous metals Reducing lead to water. The BAT-AEL emission level is ≤ 0,2 mg/l.
valid
2019-04-23
2019-04-23
NFM-Pb-BAT96-II
Non-Ferrous Metals industries - Pb - BAT96-II
2, Production and processing of metals: 2.5: Processing of non-ferrous metals; Bag filter; Reducing lead emissions to air. The BAT-AEL emission level is ≤ 1 mg/Nm3.
valid
2019-04-23
2019-04-23
NFM-Pb-BAT97-II
Non-Ferrous Metals industries - Pb - BAT97-II
2, Production and processing of metals: 2.5, Processing of non-ferrous metals: (b) melting, including the alloyage, of non-ferrous metals, including recovered products and operation of non-ferrous metal foundries, with a melting capacity exceeding 4 tonnes per day for lead and cadmium or 20 tonnes per day for all other metals; Techniques (a)-(b) (see table); Reducing lead emissions to air. The BAT-AEL emission level is ≤ 1 mg/Nm3.
valid
2019-04-23
2019-04-23
NFM-SO2-BAT100
Non-Ferrous Metals industries - SO2 - BAT100
2, Production and processing of metals: 2.5, Processing of non-ferrous metals: (b) melting, including the alloyage, of non-ferrous metals, including recovered products and operation of non-ferrous metal foundries, with a melting capacity exceeding 4 tonnes per day for lead and cadmium or 20 tonnes per day for all other metals; Techniques (a)-(d) (see table incl. footnotes); Reducing sulphur dioxide (SO2) emissions to air. The BAT-AEL emission level is 50-350 mg/Nm3.
valid
2019-04-23
2019-04-23
NFM-SO2-BAT120
Non-Ferrous Metals industries - SO2 - BAT120
2, Production and processing of metals: 2.5, Processing of non-ferrous metals: (a) production of non-ferrous crude metals from ore, concentrates or secondary raw materials by metallurgical, chemical or electrolytic processes; Wet desulphurisation technique; Reducing sulphur dioxide (SO2) emissions to air. The BAT-AEL emission level is ≤ 500 mg/Nm3.
valid
2019-04-23
2019-04-23
NFM-SO2-BAT142
Non-Ferrous Metals industries - SO2 - BAT142
2, Production and processing of metals: 2.5, Processing of non-ferrous metals: (a) production of non-ferrous crude metals from ore, concentrates or secondary raw materials by metallurgical, chemical or electrolytic processes; Techniques (a)-(b) (see table incl. footnote); Reducing sulphur dioxide (SO2) emissions to air. The BAT-AEL emission level is 50 - 480 mg/Nm3.
valid
2019-04-23
2019-04-23
NFM-SO2-BAT143
Non-Ferrous Metals industries - SO2 - BAT143
2, Production and processing of metals: 2.5, Processing of non-ferrous metals: (a) production of non-ferrous crude metals from ore, concentrates or secondary raw materials by metallurgical, chemical or electrolytic processes; Wet scrubber; Reducing sulphur dioxide (SO2) emissions to air. The BAT-AEL emission level is 50 - 100 mg/Nm3.
valid
2019-04-23
2019-04-23
NFM-SO2-BAT49-I
Non-Ferrous Metals industries - SO2 - BAT49-I
2, Production and processing of metals: 2.5, Processing of non-ferrous metals: (a) production of non-ferrous crude metals from ore, concentrates or secondary raw materials by metallurgical, chemical or electrolytic processes; Techniques (a)-(c) (see table incl. footnote) in primary copper production; Reducing sulphur dioxide (SO2) emissions to air. The BAT-AEL emission level is 50-500 mg/Nm3.
valid
2019-04-23
2019-04-23
NFM-SO2-BAT49-II
Non-Ferrous Metals industries - SO2 - BAT49-II
2, Production and processing of metals: 2.5, Processing of non-ferrous metals: (a) production of non-ferrous crude metals from ore, concentrates or secondary raw materials by metallurgical, chemical or electrolytic processes; Techniques (a)-(c) (see table incl. footnote) in secondary copper production; Reducing sulphur dioxide (SO2) emissions to air. The BAT-AEL emission level is 50-300 mg/Nm3.
valid
2019-04-23
2019-04-23
NFM-SO2-BAT69
Non-Ferrous Metals industries - SO2 - BAT69
2, Production and processing of metals: 2.5, Processing of non-ferrous metals: (a) production of non-ferrous crude metals from ore, concentrates or secondary raw materials by metallurgical, chemical or electrolytic processes; Techniques (a)-(b) (see table incl. footnote); Reducing sulphur dioxide (SO2) emissions to air. The BAT-AEL emission level is ≤ 2,5-15 kg/ t Al.
valid
2019-04-23
2019-04-23
NFM-TVOC-BAT123-I
Non-Ferrous Metals industries - TVOC - BAT123-I
2, Production and processing of metals: 2.5, Processing of non-ferrous metals: (b) melting, including the alloyage, of non-ferrous metals, including recovered products and operation of non-ferrous metal foundries, with a melting capacity exceeding 4 tonnes per day for lead and cadmium or 20 tonnes per day for all other metals; Techniques (a)-(c) (see table incl. footnote); Reducing TVOC emissions to air. The BAT-AEL emission level is 2 - 20 mg/Nm3.
valid
2019-04-23
2019-04-23
NFM-TVOC-BAT183
Non-Ferrous Metals industries - TVOC - BAT183
6. Other activities: 6.8: Production of carbon (hard-burnt coal) or electrographite by means of incineration or graphitisation; Techniques (a)-(b) (see table incl. footnote); Reducing TVOC emissions to air. The BAT-AEL emission level is ≤ 10-40 mg/Nm3.
valid
2019-04-23
2019-04-23
NFM-TVOC-BAT46
Non-Ferrous Metals industries - TVOC - BAT46
2, Production and processing of metals: 2.5, Processing of non-ferrous metals; Techniques (a)-(e) (see table incl. footnote); Reducing TVOC emissions to air. The BAT-AEL emission level is 3 - 30 mg/Nm3.
valid
2019-04-23
2019-04-23
NFM-TVOC-BAT83-I
Non-Ferrous Metals industries - TVOC - BAT83-I
2, Production and processing of metals: 2.5, Processing of non-ferrous metals: (b) melting, including the alloyage, of non-ferrous metals, including recovered products and operation of non-ferrous metal foundries, with a melting capacity exceeding 4 tonnes per day for lead and cadmium or 20 tonnes per day for all other metals; Techniques (a)-(e) (see table); Reducing TVOC emissions to air. The BAT-AEL emission level is ≤ 10-30 mg/Nm3.
valid
2019-04-23
2019-04-23
NFM-TVOC-BAT98
Non-Ferrous Metals industries - TVOC - BAT98
2, Production and processing of metals: 2.5, Processing of non-ferrous metals: (b) melting, including the alloyage, of non-ferrous metals, including recovered products and operation of non-ferrous metal foundries, with a melting capacity exceeding 4 tonnes per day for lead and cadmium or 20 tonnes per day for all other metals; Techniques (a)-(c) (see table incl. footnotes); Reducing TVOC emissions to air. The BAT-AEL emission level is 10 - 40 mg/Nm3.
valid
2019-04-23
2019-04-23
NFM-Zn-BAT114-I
Non-Ferrous Metals industries - Zn - BAT114-I
2, Production and processing of metals: 2.5: Processing of non-ferrous metals: (a) production of non-ferrous crude metals from ore, concentrates or secondary raw materials by metallurgical, chemical or electrolytic processes; Techniques (a)-(c) (see table incl. footnote); Reducing zinc emissions to air. The BAT-AEL emission level is ≤ 1 mg/Nm3.
valid
2019-04-23
2019-04-23
NFM-Zn-BAT17-XXIII
Non-Ferrous Metals industries - Zn - BAT17-XXIII
2, Production and processing of metals: 2.5, Processing of non-ferrous metals Reducing zinc to water. The BAT-AEL emission level is ≤ 1 mg/l.
valid
2019-04-23
2019-04-23
NFM-Zn-BAT17-XXIV
Non-Ferrous Metals industries - Zn - BAT17-XXIV
2, Production and processing of metals: 2.5, Processing of non-ferrous metals Reducing zinc to water. The BAT-AEL emission level is ≤ 0,4 mg/l.
valid
2019-04-23
2019-04-23
PP-AOX-BAT19-VI
Production of pulp, paper and board - AOX - BAT19-VI
6. Other activities: 6.1 Production in industrial installations of:
(a) pulp from timber or other fibrous materials;
(b) paper or card board; Reducing adsorbable organically bound halogens (AOX) to water. The BAT-AEL emission level is 0 - 0,2 kg/ADt.
valid
2019-04-23
2019-04-23
PP-AOX-BAT33-IX
Production of pulp, paper and board - AOX - BAT33-IX
6. Other activities: 6.1 Production in industrial installations of:
(a) pulp from timber or other fibrous materials;
(b) paper or card board; Reducing Adsorbable Organically Bound Halogens (AOX) to water. The BAT-AEL emission level is 0,5 – 1,5 mg/l.
valid
2019-04-23
2019-04-23
PP-AOX-BAT45-V
Production of pulp, paper and board - AOX - BAT45-V
6. Other activities: 6.1 Production in industrial installations of:
(a) pulp from timber or other fibrous materials;
(b) paper or card board; Reducing adsorbable organically bound halogens (AOX) to water. The BAT-AEL emission level is < 0,05 kg/t.
valid
2019-04-23
2019-04-23
PP-AOX-BAT45-XIV
Production of pulp, paper and board - AOX - BAT45-XIV
6. Other activities: 6.1 Production in industrial installations of:
(a) pulp from timber or other fibrous materials;
(b) paper or card board; Reducing adsorbable organically bound halogens (AOX) to water. The BAT-AEL emission level is < 0,05 kg/t.
valid
2019-04-23
2019-04-23
PP-AOX-BAT50-VI
Production of pulp, paper and board - AOX - BAT50-VI
6. Other activities: 6.1 Production in industrial installations of:
(a) pulp from timber or other fibrous materials;
(b) paper or card board; Reducing Adsorbable Organically Bound Halogens (AOX) to water. The BAT-AEL emission level is 0,05 kg/t.
valid
2019-04-23
2019-04-23
PP-AOX-BAT50-XI
Production of pulp, paper and board - AOX - BAT50-XI
6. Other activities: 6.1 Production in industrial installations of:
(a) pulp from timber or other fibrous materials;
(b) paper or card board; Reducing Adsorbable Organically Bound Halogens (AOX) to water. The BAT-AEL emission level is 0,05 kg/t .
valid
2019-04-23
2019-04-23
PP-COD-BAT19-I
Production of pulp, paper and board - COD - BAT19-I
6. Other activities: 6.1 Production in industrial installations of:
(a) pulp from timber or other fibrous materials;
(b) paper or card board; Reducing chemical oxygen demand (COD) to water. The BAT-AEL emission level is 7 - 20 kg/ADt.
valid
2019-04-23
2019-04-23
PP-COD-BAT19-VII
Production of pulp, paper and board - COD - BAT19-VII
6. Other activities: 6.1 Production in industrial installations of:
(a) pulp from timber or other fibrous materials;
(b) paper or card board; Reducing chemical oxygen demand (COD) to water. The BAT-AEL emission level is 2,5 - 8 kg/ADt.
valid
2019-04-23
2019-04-23
PP-COD-BAT33-I
Production of pulp, paper and board - COD - BAT33-I
6. Other activities: 6.1 Production in industrial installations of:
(a) pulp from timber or other fibrous materials;
(b) paper or card board; Reducing chemical oxygen demand (COD) to water. The BAT-AEL emission level is 10 – 30 kg/ADt.
valid
2019-04-23
2019-04-23
PP-COD-BAT33-II
Production of pulp, paper and board - COD - BAT33-II
6. Other activities: 6.1 Production in industrial installations of:
(a) pulp from timber or other fibrous materials;
(b) paper or card board; Reducing chemical oxygen demand (COD) to water. The BAT-AEL emission level is 20 – 35 kg/ADt.
valid
2019-04-23
2019-04-23
PP-COD-BAT33-X
Production of pulp, paper and board - COD - BAT33-X
6. Other activities: 6.1 Production in industrial installations of:
(a) pulp from timber or other fibrous materials;
(b) paper or card board; Reducing chemical oxygen demand (COD) to water. The BAT-AEL emission level is 3,2 – 11 kg/ADt.
valid
2019-04-23
2019-04-23
PP-COD-BAT40-I
Production of pulp, paper and board - COD - BAT40-I
6. Other activities: 6.1 Production in industrial installations of:
(a) pulp from timber or other fibrous materials;
(b) paper or card board; Reducing chemical oxygen demand (COD) to water. The BAT-AEL emission level is 0,9 – 4,5 kg/t.
valid
2019-04-23
2019-04-23
PP-COD-BAT40-V
Production of pulp, paper and board - COD - BAT40-V
6. Other activities: 6.1 Production in industrial installations of:
(a) pulp from timber or other fibrous materials;
(b) paper or card board; Reducing chemical oxygen demand (COD) to water. The BAT-AEL emission level is 12 – 20 kg/ADt.
valid
2019-04-23
2019-04-23
PP-COD-BAT45-I
Production of pulp, paper and board - COD - BAT45-I
6. Other activities: 6.1 Production in industrial installations of:
(a) pulp from timber or other fibrous materials;
(b) paper or card board; Reducing chemical oxygen demand (COD) to water. The BAT-AEL emission level is 0,4 - 1,4 kg/t.
valid
2019-04-23
2019-04-23
PP-COD-BAT45-VI
Production of pulp, paper and board - COD - BAT45-VI
6. Other activities: 6.1 Production in industrial installations of:
(a) pulp from timber or other fibrous materials;
(b) paper or card board; Reducing chemical oxygen demand (COD) to water. The BAT-AEL emission level is 0,9 - 3 kg/t.
valid
2019-04-23
2019-04-23
PP-COD-BAT45-VII
Production of pulp, paper and board - COD - BAT45-VII
6. Other activities: 6.1 Production in industrial installations of:
(a) pulp from timber or other fibrous materials;
(b) paper or card board; Reducing chemical oxygen demand (COD) to water. The BAT-AEL emission level is 0,9 - 4 kg/t.
valid
2019-04-23
2019-04-23
PP-COD-BAT50-I
Production of pulp, paper and board - COD - BAT50-I
6. Other activities: 6.1 Production in industrial installations of:
(a) pulp from timber or other fibrous materials;
(b) paper or card board; Reducing chemical oxygen demand (COD) to water. The BAT-AEL emission level is 0,15 – 1,5 kg/t.
valid
2019-04-23
2019-04-23
PP-COD-BAT50-VII
Production of pulp, paper and board - COD - BAT50-VII
6. Other activities: 6.1 Production in industrial installations of:
(a) pulp from timber or other fibrous materials;
(b) paper or card board; Reducing chemical oxygen demand (COD) to water. The BAT-AEL emission level is 0,3 – 5 kg/t .
valid
2019-04-23
2019-04-23
PP-Dust-BAT23-I
Production of pulp, paper and board - Dust - BAT23-I
6. Other activities: 6.1 Production in industrial installations of:
(a) pulp from timber or other fibrous materials;
(b) paper or card board; Use an electrostatic precipitator (ESP) or a combination of ESP and wet scrubber: see description (Section 1.7.1.1) for New or major refurbishment; Reducing dust emissions to air. The BAT-AEL emission level is 10 – 25 mg/Nm3 at 6 % O2 .
valid
2019-04-23
2019-04-23
PP-Dust-BAT23-II
Production of pulp, paper and board - Dust - BAT23-II
6. Other activities: 6.1 Production in industrial installations of:
(a) pulp from timber or other fibrous materials;
(b) paper or card board; Use an electrostatic precipitator (ESP) or a combination of ESP and wet scrubber: see description (Section 1.7.1.1) for Existing; Reducing dust emissions to air. The BAT-AEL emission level is 0,02 – 0,20 kg dust/ADt.
valid
2019-04-23
2019-04-23
PP-Dust-BAT23-III
Production of pulp, paper and board - Dust - BAT23-III
6. Other activities: 6.1 Production in industrial installations of:
(a) pulp from timber or other fibrous materials;
(b) paper or card board; Use an electrostatic precipitator (ESP) or a combination of ESP and wet scrubber: see description (Section 1.7.1.1) for New or major refurbishment; Reducing dust emissions to air. The BAT-AEL emission level is 10 – 40 mg/Nm3 at 6 % O2 .
valid
2019-04-23
2019-04-23
PP-Dust-BAT23-IV
Production of pulp, paper and board - Dust - BAT23-IV
6. Other activities: 6.1 Production in industrial installations of:
(a) pulp from timber or other fibrous materials;
(b) paper or card board; Use an electrostatic precipitator (ESP) or a combination of ESP and wet scrubber: see description (Section 1.7.1.1) for Existing; Reducing dust emissions to air. The BAT-AEL emission level is 0,02 — 0,3 kg dust/ADt.
valid
2019-04-23
2019-04-23
PP-Dust-BAT27-I
Production of pulp, paper and board - Dust - BAT27-I
6. Other activities: 6.1 Production in industrial installations of:
(a) pulp from timber or other fibrous materials;
(b) paper or card board; Use an electrostatic precipitator (ESP) or a combination of ESP and wet scrubber: see description (Section 1.7.1.1.) for New or major refurbishments; Reducing dust emissions to air. The BAT-AEL emission level is 10 – 25 mg/Nm3 at 6 % O2.
valid
2019-04-23
2019-04-23
PP-Dust-BAT27-II
Production of pulp, paper and board - Dust - BAT27-II
6. Other activities: 6.1 Production in industrial installations of:
(a) pulp from timber or other fibrous materials;
(b) paper or card board; Use an electrostatic precipitator (ESP) or a combination of ESP and wet scrubber: see description (Section 1.7.1.1.) for New or major refurbishments; Reducing dust emissions to air. The BAT-AEL emission level is 0,005 – 0,02 kg dust/ADt .
valid
2019-04-23
2019-04-23
PP-Dust-BAT27-III
Production of pulp, paper and board - Dust - BAT27-III
6. Other activities: 6.1 Production in industrial installations of:
(a) pulp from timber or other fibrous materials;
(b) paper or card board; Use an electrostatic precipitator (ESP) or a combination of ESP and wet scrubber: see description (Section 1.7.1.1.) for Existing; Reducing dust emissions to air. The BAT-AEL emission level is 10 – 30 mg/Nm3 at 6 % O2.
valid
2019-04-23
2019-04-23
PP-Dust-BAT27-IV
Production of pulp, paper and board - Dust - BAT27-IV
6. Other activities: 6.1 Production in industrial installations of:
(a) pulp from timber or other fibrous materials;
(b) paper or card board; Use an electrostatic precipitator (ESP) or a combination of ESP and wet scrubber: see description (Section 1.7.1.1.) for Existing; Reducing dust emissions to air. The BAT-AEL emission level is 0,005 – 0,03 kg dust/ADt .
valid
2019-04-23
2019-04-23
PP-Dust-BAT37-I
Production of pulp, paper and board - Dust - BAT37-I
6. Other activities: 6.1 Production in industrial installations of:
(a) pulp from timber or other fibrous materials;
(b) paper or card board; Techniques (a)-(b) (see table) and limit ‘acid operation’ of the scrubbers to the minimum required to ensure their proper functioning; Reducing dust emissions to air. The BAT-AEL emission level is 5 – 20 mg/Nm3 at 5 % O2.
valid
2019-04-23
2019-04-23
PP-N-BAT33-V
Production of pulp, paper and board - N - BAT33-V
6. Other activities: 6.1 Production in industrial installations of:
(a) pulp from timber or other fibrous materials;
(b) paper or card board; Reducing total nitrogen to water. The BAT-AEL emission level is 0,15 – 0,3 kg/ADt.
valid
2019-04-23
2019-04-23
PP-N-BAT33-VI
Production of pulp, paper and board - N - BAT33-VI
6. Other activities: 6.1 Production in industrial installations of:
(a) pulp from timber or other fibrous materials;
(b) paper or card board; Reducing total nitrogen to water. The BAT-AEL emission level is 0,1 – 0,25 kg/ADt.
valid
2019-04-23
2019-04-23
PP-N-BAT33-XII
Production of pulp, paper and board - N - BAT33-XII
6. Other activities: 6.1 Production in industrial installations of:
(a) pulp from timber or other fibrous materials;
(b) paper or card board; Reducing total nitrogen to water. The BAT-AEL emission level is 0,1 – 0,2 kg/ADt.
valid
2019-04-23
2019-04-23
PP-N-BAT40-III
Production of pulp, paper and board - N - BAT40-III
6. Other activities: 6.1 Production in industrial installations of:
(a) pulp from timber or other fibrous materials;
(b) paper or card board; Reducing total nitrogen to water. The BAT-AEL emission level is 0,03 – 0,1 kg/t.
valid
2019-04-23
2019-04-23
PP-N-BAT40-VII
Production of pulp, paper and board - N - BAT40-VII
6. Other activities: 6.1 Production in industrial installations of:
(a) pulp from timber or other fibrous materials;
(b) paper or card board; Reducing total nitrogen to water. The BAT-AEL emission level is 0,15 – 0,18 kg/ADt.
valid
2019-04-23
2019-04-23
PP-N-BAT50-III
Production of pulp, paper and board - N - BAT50-III
6. Other activities: 6.1 Production in industrial installations of:
(a) pulp from timber or other fibrous materials;
(b) paper or card board; Reducing total nitrogen to water. The BAT-AEL emission level is 0,01 – 0,1 kg/t.
valid
2019-04-23
2019-04-23
PP-N-BAT50-IV
Production of pulp, paper and board - N - BAT50-IV
6. Other activities: 6.1 Production in industrial installations of:
(a) pulp from timber or other fibrous materials;
(b) paper or card board; Reducing total nitrogen to water. The BAT-AEL emission level is 0,01 – 0,15 kg/t.
valid
2019-04-23
2019-04-23
PP-N-BAT50-IX
Production of pulp, paper and board - N - BAT50-IX
6. Other activities: 6.1 Production in industrial installations of:
(a) pulp from timber or other fibrous materials;
(b) paper or card board; Reducing total nitrogen to water. The BAT-AEL emission level is 0,015 – 0,4 kg/t .
valid
2019-04-23
2019-04-23
PP-NH3-BAT36-III
Production of pulp, paper and board - NH3 - BAT36-III
6. Other activities: 6.1 Production in industrial installations of:
(a) pulp from timber or other fibrous materials;
(b) paper or card board; Techniques (a)-(c) (see table); Reducing ammonia (NH3) emissions to air. The BAT-AEL emission level is < 5 mg/Nm3 at 5 % O2.
valid
2019-04-23
2019-04-23
PP-NO2-BAT22-I
Production of pulp, paper and board - NO2 - BAT22-I
6. Other activities: 6.1 Production in industrial installations of:
(a) pulp from timber or other fibrous materials;
(b) paper or card board; Techniques (a)-(c) (see table); Reducing nitrous oxides (NOx) emissions to air. The BAT-AEL emission level is 120 – 200 mg/Nm3 at 6 % O2.
valid
2019-04-23
2019-04-23
PP-NO2-BAT22-II
Production of pulp, paper and board - NO2 - BAT22-II
6. Other activities: 6.1 Production in industrial installations of:
(a) pulp from timber or other fibrous materials;
(b) paper or card board; Techniques (a)-(c) (see table); Reducing nitrous oxides (NOx) emissions to air. The BAT-AEL emission level is 0,8 – 1,4 kg NOx/ADt.
valid
2019-04-23
2019-04-23
PP-NO2-BAT22-III
Production of pulp, paper and board - NO2 - BAT22-III
6. Other activities: 6.1 Production in industrial installations of:
(a) pulp from timber or other fibrous materials;
(b) paper or card board; Techniques (a)-(c) (see table); Reducing nitrous oxides (NOx) emissions to air. The BAT-AEL emission level is 1,0 – 1,6 kg NOx/ADt.
valid
2019-04-23
2019-04-23
PP-NO2-BAT22-IV
Production of pulp, paper and board - NO2 - BAT22-IV
6. Other activities: 6.1 Production in industrial installations of:
(a) pulp from timber or other fibrous materials;
(b) paper or card board; Techniques (a)-(c) (see table); Reducing nitrous oxides (NOx) emissions to air. The BAT-AEL emission level is 120 – 200 mg/Nm3 at 6 % O2.
valid
2019-04-23
2019-04-23
PP-NO2-BAT22-V
Production of pulp, paper and board - NO2 - BAT22-V
6. Other activities: 6.1 Production in industrial installations of:
(a) pulp from timber or other fibrous materials;
(b) paper or card board; Techniques (a)-(c) (see table); Reducing nitrous oxides (NOx) emissions to air. The BAT-AEL emission level is 0,8 – 1,4 kg NOx/ADt.
valid
2019-04-23
2019-04-23
PP-NO2-BAT22-VI
Production of pulp, paper and board - NO2 - BAT22-VI
6. Other activities: 6.1 Production in industrial installations of:
(a) pulp from timber or other fibrous materials;
(b) paper or card board; Techniques (a)-(c) (see table); Reducing nitrous oxides (NOx) emissions to air. The BAT-AEL emission level is 1,0 – 1,7 kg NOx/ADt.
valid
2019-04-23
2019-04-23
PP-NO2-BAT26-I
Production of pulp, paper and board - NO2 - BAT26-I
6. Other activities: 6.1 Production in industrial installations of:
(a) pulp from timber or other fibrous materials;
(b) paper or card board; Techniques (a)-(d) (see table); Reducing nitrogen oxides (NOx) emissions to air. The BAT-AEL emission level is 100 – 200 mg/Nm3 at 6 % O2 .
valid
2019-04-23
2019-04-23
PP-NO2-BAT26-II
Production of pulp, paper and board - NO2 - BAT26-II
6. Other activities: 6.1 Production in industrial installations of:
(a) pulp from timber or other fibrous materials;
(b) paper or card board; Techniques (a)-(d) (see table); Reducing nitrogen oxides (NOx) emissions to air. The BAT-AEL emission level is 0,1 – 0,2 kg NOx/ADt .
valid
2019-04-23
2019-04-23
PP-NO2-BAT26-III
Production of pulp, paper and board - NO2 - BAT26-III
6. Other activities: 6.1 Production in industrial installations of:
(a) pulp from timber or other fibrous materials;
(b) paper or card board; Techniques (a)-(d) (see table); Reducing nitrogen oxides (NOx) emissions to air. The BAT-AEL emission level is 100 – 350 mg/Nm3 at 6 % O2 .
valid
2019-04-23
2019-04-23
PP-NO2-BAT26-IV
Production of pulp, paper and board - NO2 - BAT26-IV
6. Other activities: 6.1 Production in industrial installations of:
(a) pulp from timber or other fibrous materials;
(b) paper or card board; Techniques (a)-(d) (see table); Reducing nitrogen oxides (NOx) emissions to air. The BAT-AEL emission level is 0,1 – 0,3 kg NOx/ADt .
valid
2019-04-23
2019-04-23
PP-NO2-BAT29-I
Production of pulp, paper and board - NO2 - BAT29-I
6. Other activities: 6.1 Production in industrial installations of:
(a) pulp from timber or other fibrous materials;
(b) paper or card board; Techniques (a)-(b) (see table); Reducing nitrogen oxides (NOx) emissions to air. The BAT-AEL emission level is 50 – 400 mg/Nm3 at 9 % O2.
valid
2019-04-23
2019-04-23
PP-NO2-BAT29-II
Production of pulp, paper and board - NO2 - BAT29-II
6. Other activities: 6.1 Production in industrial installations of:
(a) pulp from timber or other fibrous materials;
(b) paper or card board; Techniques (a)-(b) (see table); Reducing nitrogen oxides (NOx) emissions to air. The BAT-AEL emission level is 0,01 – 0,1 kg NOx/ADt .
valid
2019-04-23
2019-04-23
PP-NO2-BAT36-I
Production of pulp, paper and board - NO2 - BAT36-I
6. Other activities: 6.1 Production in industrial installations of:
(a) pulp from timber or other fibrous materials;
(b) paper or card board; Techniques (a)-(c) (see table); Reducing nitrogen oxides (NOx) emissions to air. The BAT-AEL emission level is 100 – 350 mg/Nm3 at 5 % O2 .
valid
2019-04-23
2019-04-23
PP-NO2-BAT36-II
Production of pulp, paper and board - NO2 - BAT36-II
6. Other activities: 6.1 Production in industrial installations of:
(a) pulp from timber or other fibrous materials;
(b) paper or card board; Techniques (a)-(c) (see table); Reducing nitrogen oxides (NOx) emissions to air. The BAT-AEL emission level is 100 – 270 mg/Nm3 at 5 % O2.
valid
2019-04-23
2019-04-23
PP-S-BAT21-V
Production of pulp, paper and board - S - BAT21-V
6. Other activities: 6.1 Production in industrial installations of:
(a) pulp from timber or other fibrous materials;
(b) paper or card board; Techniques (a)-(c) (see table); Reducing total reduced sulphur (TRS) emissions to air. The BAT-AEL emission level is 1 – 10 mg/Nm3 at 6 % O2.
valid
2019-04-23
2019-04-23
PP-S-BAT21-VI
Production of pulp, paper and board - S - BAT21-VI
6. Other activities: 6.1 Production in industrial installations of:
(a) pulp from timber or other fibrous materials;
(b) paper or card board; Techniques (a)-(c) (see table); Reducing total reduced sulphur (TRS) emissions to air. The BAT-AEL emission level is 1 – 5 mg/Nm3 at 6 % O2.
valid
2019-04-23
2019-04-23
PP-S-BAT21-VII
Production of pulp, paper and board - S - BAT21-VII
6. Other activities: 6.1 Production in industrial installations of:
(a) pulp from timber or other fibrous materials;
(b) paper or card board; Techniques (a)-(c) (see table); Reducing gaseous S emissions to air. The BAT-AEL emission level is 0,03 – 0,17 kg S/ADt.
valid
2019-04-23
2019-04-23
PP-S-BAT21-VIII
Production of pulp, paper and board - S - BAT21-VIII
6. Other activities: 6.1 Production in industrial installations of:
(a) pulp from timber or other fibrous materials;
(b) paper or card board; Techniques (a)-(c) (see table); Reducing gaseous S emissions to air. The BAT-AEL emission level is 0,03 – 0,13 kg S/ADt.
valid
2019-04-23
2019-04-23
PP-S-BAT24-III
Production of pulp, paper and board - S - BAT24-III
6. Other activities: 6.1 Production in industrial installations of:
(a) pulp from timber or other fibrous materials;
(b) paper or card board; Techniques (a)-(d) (see table); Reducing gaseous S emissions to air. The BAT-AEL emission level is 0,005 – 0,07 kg S/ADt.
valid
2019-04-23
2019-04-23
PP-S-BAT24-IV
Production of pulp, paper and board - S - BAT24-IV
6. Other activities: 6.1 Production in industrial installations of:
(a) pulp from timber or other fibrous materials;
(b) paper or card board; Techniques (a)-(d) (see table); Reducing gaseous S emissions to air. The BAT-AEL emission level is 0,055 – 0,12 kg S/ADt.
valid
2019-04-23
2019-04-23
PP-S-BAT28-II
Production of pulp, paper and board - S - BAT28-II
6. Other activities: 6.1 Production in industrial installations of:
(a) pulp from timber or other fibrous materials;
(b) paper or card board; Use an alkaline SO2 scrubber; Reducing TRS emissions to air. The BAT-AEL emission level is 1 – 5 mg/Nm3 at 9 % O2.
valid
2019-04-23
2019-04-23
PP-S-BAT28-III
Production of pulp, paper and board - S - BAT28-III
6. Other activities: 6.1 Production in industrial installations of:
(a) pulp from timber or other fibrous materials;
(b) paper or card board; Use an alkaline SO2 scrubber; Reducing gaseous S emissions to air. The BAT-AEL emission level is 0,002 – 0,05 kg S/ADt.
valid
2019-04-23
2019-04-23
PP-SO2-BAT21-I
Production of pulp, paper and board - SO2 - BAT21-I
6. Other activities: 6.1 Production in industrial installations of:
(a) pulp from timber or other fibrous materials;
(b) paper or card board; Techniques (a)-(c) (see table); Reducing sulphur dioxide (SO2) emissions to air. The BAT-AEL emission level is 10 – 70 mg/Nm3 at 6 % O2.
valid
2019-04-23
2019-04-23
PP-SO2-BAT21-II
Production of pulp, paper and board - SO2 - BAT21-II
6. Other activities: 6.1 Production in industrial installations of:
(a) pulp from timber or other fibrous materials;
(b) paper or card board; Techniques (a)-(c) (see table); Reducing sulphur dioxide (SO2) emissions to air. The BAT-AEL emission level is 5 – 50 mg/Nm3 at 6 % O2.
valid
2019-04-23
2019-04-23
PP-SO2-BAT21-III
Production of pulp, paper and board - SO2 - BAT21-III
6. Other activities: 6.1 Production in industrial installations of:
(a) pulp from timber or other fibrous materials;
(b) paper or card board; Techniques (a)-(c) (see table); Reducing sulphur dioxide (SO2) emissions to air. The BAT-AEL emission level is 10 – 50 mg/Nm3 at 6 % O2.
valid
2019-04-23
2019-04-23
PP-SO2-BAT21-IV
Production of pulp, paper and board - SO2 - BAT21-IV
6. Other activities: 6.1 Production in industrial installations of:
(a) pulp from timber or other fibrous materials;
(b) paper or card board; Techniques (a)-(c) (see table); Reducing sulphur dioxide (SO2) emissions to air. The BAT-AEL emission level is 5 – 25 mg/Nm3 at 6 % O2.
valid
2019-04-23
2019-04-23
PP-SO2-BAT24-I
Production of pulp, paper and board - SO2 - BAT24-I
6. Other activities: 6.1 Production in industrial installations of:
(a) pulp from timber or other fibrous materials;
(b) paper or card board; Techniques (a)-(d) (see table); Reducing sulphur dioxide (SO2) emissions to air. The BAT-AEL emission level is 5 – 70 mg SO2/Nm3 at 6 % O2.
valid
2019-04-23
2019-04-23
PP-SO2-BAT24-II
Production of pulp, paper and board - SO2 - BAT24-II
6. Other activities: 6.1 Production in industrial installations of:
(a) pulp from timber or other fibrous materials;
(b) paper or card board; Techniques (a)-(d) (see table); Reducing sulphur dioxide (SO2) emissions to air. The BAT-AEL emission level is 55 – 120 mg SO2/Nm3 at 6 % O2.
valid
2019-04-23
2019-04-23
PP-SO2-BAT28-I
Production of pulp, paper and board - SO2 - BAT28-I
6. Other activities: 6.1 Production in industrial installations of:
(a) pulp from timber or other fibrous materials;
(b) paper or card board; Use an alkaline SO2 scrubber; Reducing sulphur dioxide (SO2) emissions to air. The BAT-AEL emission level is 20 – 120 mg/Nm3 at 9 % O2.
valid
2019-04-23
2019-04-23
PP-SO2-BAT37-II
Production of pulp, paper and board - SO2 - BAT37-II
6. Other activities: 6.1 Production in industrial installations of:
(a) pulp from timber or other fibrous materials;
(b) paper or card board; Techniques (a)-(b) (see table) and limit ‘acid operation’ of the scrubbers to the minimum required to ensure their proper functioning; Reducing sulphur dioxide (SO2) emissions to air. The BAT-AEL emission level is 100 – 300 mg/Nm3 at 5 % O2.
valid
2019-04-23
2019-04-23
PP-SO2-BAT37-III
Production of pulp, paper and board - SO2 - BAT37-III
6. Other activities: 6.1 Production in industrial installations of:
(a) pulp from timber or other fibrous materials;
(b) paper or card board; Techniques (a)-(b) (see table) and limit ‘acid operation’ of the scrubbers to the minimum required to ensure their proper functioning; Reducing sulphur dioxide (SO2) emissions to air. The BAT-AEL emission level is 50 – 250 mg/Nm3 at 5 % O2.
valid
2019-04-23
2019-04-23
PP-TN-BAT19-III
Production of pulp, paper and board - TN - BAT19-III
6. Other activities: 6.1 Production in industrial installations of:
(a) pulp from timber or other fibrous materials;
(b) paper or card board; Reducing total nitrogen to water. The BAT-AEL emission level is 0,05 - 0,25 kg/ADt.
valid
2019-04-23
2019-04-23
PP-TN-BAT19-IX
Production of pulp, paper and board - TN - BAT19-IX
6. Other activities: 6.1 Production in industrial installations of:
(a) pulp from timber or other fibrous materials;
(b) paper or card board; Reducing total nitrogen to water. The BAT-AEL emission level is 0,1 - 0,2 kg/ADt.
valid
2019-04-23
2019-04-23
PP-TN-BAT45-III
Production of pulp, paper and board - TN - BAT45-III
6. Other activities: 6.1 Production in industrial installations of:
(a) pulp from timber or other fibrous materials;
(b) paper or card board; Reducing total nitrogen to water. The BAT-AEL emission level is 0,008 - 0,09 kg/t.
valid
2019-04-23
2019-04-23
PP-TN-BAT45-X
Production of pulp, paper and board - TN - BAT45-X
6. Other activities: 6.1 Production in industrial installations of:
(a) pulp from timber or other fibrous materials;
(b) paper or card board; Reducing total nitrogen to water. The BAT-AEL emission level is 0,01 - 0,1 kg/t.
valid
2019-04-23
2019-04-23
PP-TN-BAT45-XI
Production of pulp, paper and board - TN - BAT45-XI
6. Other activities: 6.1 Production in industrial installations of:
(a) pulp from timber or other fibrous materials;
(b) paper or card board; Reducing total nitrogen to water. The BAT-AEL emission level is 0,01 - 0,15 kg/t.
valid
2019-04-23
2019-04-23
PP-TP-BAT19-IV
Production of pulp, paper and board - TP - BAT19-IV
6. Other activities: 6.1 Production in industrial installations of:
(a) pulp from timber or other fibrous materials;
(b) paper or card board; Reducing total phosphorus to water. The BAT-AEL emission level is 0,01 - 0,03 kg/ADt.
valid
2019-04-23
2019-04-23
PP-TP-BAT19-V
Production of pulp, paper and board - TP - BAT19-V
6. Other activities: 6.1 Production in industrial installations of:
(a) pulp from timber or other fibrous materials;
(b) paper or card board; Reducing total phosphorus to water. The BAT-AEL emission level is 0,02 - 0,11 kg/ADt.
valid
2019-04-23
2019-04-23
PP-TP-BAT19-X
Production of pulp, paper and board - TP - BAT19-X
6. Other activities: 6.1 Production in industrial installations of:
(a) pulp from timber or other fibrous materials;
(b) paper or card board; Reducing total phosphorus to water. The BAT-AEL emission level is 0,01 - 0,02 kg/ADt.
valid
2019-04-23
2019-04-23
PP-TP-BAT33-VII
Production of pulp, paper and board - TP - BAT33-VII
6. Other activities: 6.1 Production in industrial installations of:
(a) pulp from timber or other fibrous materials;
(b) paper or card board; Reducing total phosphorous to water. The BAT-AEL emission level is 0,01 – 0,05 kg/ADt.
valid
2019-04-23
2019-04-23
PP-TP-BAT33-VIII
Production of pulp, paper and board - TP - BAT33-VIII
6. Other activities: 6.1 Production in industrial installations of:
(a) pulp from timber or other fibrous materials;
(b) paper or card board; Reducing total phosphorous to water. The BAT-AEL emission level is 0,01 – 0,07 kg/ADt.
valid
2019-04-23
2019-04-23
PP-TP-BAT33-XIII
Production of pulp, paper and board - TP - BAT33-XIII
6. Other activities: 6.1 Production in industrial installations of:
(a) pulp from timber or other fibrous materials;
(b) paper or card board; Reducing total phosphorus to water. The BAT-AEL emission level is 0,01 – 0,02 kg/ADt.
valid
2019-04-23
2019-04-23
PP-TP-BAT40-IV
Production of pulp, paper and board - TP - BAT40-IV
6. Other activities: 6.1 Production in industrial installations of:
(a) pulp from timber or other fibrous materials;
(b) paper or card board; Reducing total phosphorus to water. The BAT-AEL emission level is 0,001 – 0,01 kg/t.
valid
2019-04-23
2019-04-23
PP-TP-BAT40-VIII
Production of pulp, paper and board - TP - BAT40-VIII
6. Other activities: 6.1 Production in industrial installations of:
(a) pulp from timber or other fibrous materials;
(b) paper or card board; Reducing total phosphorus to water. The BAT-AEL emission level is 0,001 – 0,01 kg/ADt.
valid
2019-04-23
2019-04-23
PP-TP-BAT45-IV
Production of pulp, paper and board - TP - BAT45-IV
6. Other activities: 6.1 Production in industrial installations of:
(a) pulp from timber or other fibrous materials;
(b) paper or card board; Reducing total phosphorus to water. The BAT-AEL emission level is 0,001 - 0,005 kg/t.
valid
2019-04-23
2019-04-23
PP-TP-BAT45-XII
Production of pulp, paper and board - TP - BAT45-XII
6. Other activities: 6.1 Production in industrial installations of:
(a) pulp from timber or other fibrous materials;
(b) paper or card board; Reducing total phosphorus to water. The BAT-AEL emission level is 0,002 - 0,01 kg/t.
valid
2019-04-23
2019-04-23
PP-TP-BAT45-XIII
Production of pulp, paper and board - TP - BAT45-XIII
6. Other activities: 6.1 Production in industrial installations of:
(a) pulp from timber or other fibrous materials;
(b) paper or card board; Reducing total phosphorus to water. The BAT-AEL emission level is 0,002 - 0,015 kg/t.
valid
2019-04-23
2019-04-23
PP-TP-BAT50-V
Production of pulp, paper and board - TP - BAT50-V
6. Other activities: 6.1 Production in industrial installations of:
(a) pulp from timber or other fibrous materials;
(b) paper or card board; Reducing total phosphorus to water. The BAT-AEL emission level is 0,003 – 0,012 kg/t.
valid
2019-04-23
2019-04-23
PP-TP-BAT50-X
Production of pulp, paper and board - TP - BAT50-X
6. Other activities: 6.1 Production in industrial installations of:
(a) pulp from timber or other fibrous materials;
(b) paper or card board; Reducing total phosphorus to water. The BAT-AEL emission level is 0,002 – 0,04 kg/t .
valid
2019-04-23
2019-04-23
PP-TRS-BAT20
Production of pulp, paper and board - TRS - BAT20
6. Other activities: 6.1 Production in industrial installations of:
(a) pulp from timber or other fibrous materials;
(b) paper or card board; Techniques (a)-(c) (see table incl. footnotes); Reducing total reduced sulphur (TRS) emissions to air. The BAT-AEL emission level is 0,05 - 0,2 kg/Adt.
valid
2019-04-23
2019-04-23
PP-TRS-BAT25-I
Production of pulp, paper and board - TRS - BAT25-I
6. Other activities: 6.1 Production in industrial installations of:
(a) pulp from timber or other fibrous materials;
(b) paper or card board; Techniques (a)-(c) (see table incl. footnotes); Reducing total reduced sulphur (TRS) emissions to air. The BAT-AEL emission level is < 1 - 10 mg S/Nm3.
valid
2019-04-23
2019-04-23
PP-TRS-BAT25-II
Production of pulp, paper and board - TRS - BAT25-II
6. Other activities: 6.1 Production in industrial installations of:
(a) pulp from timber or other fibrous materials;
(b) paper or card board; Techniques (a)-(c) (see table incl. footnotes); Reducing total reduced sulphur (TRS) emissions to air. The BAT-AEL emission level is < 1 - 40 mg S/Nm3.
valid
2019-04-23
2019-04-23
PP-TSS-BAT19-II
Production of pulp, paper and board - TSS - BAT19-II
6. Other activities: 6.1 Production in industrial installations of:
(a) pulp from timber or other fibrous materials;
(b) paper or card board; Reducing total suspended solids (TSS) to water. The BAT-AEL emission level is 0,3 - 1,5 kg/ADt.
valid
2019-04-23
2019-04-23
PP-TSS-BAT19-VIII
Production of pulp, paper and board - TSS - BAT19-VIII
6. Other activities: 6.1 Production in industrial installations of:
(a) pulp from timber or other fibrous materials;
(b) paper or card board; Reducing total suspended solids (TSS) to water. The BAT-AEL emission level is 0,3 - 1 kg/ADt.
valid
2019-04-23
2019-04-23
PP-TSS-BAT33-III
Production of pulp, paper and board - TSS - BAT33-III
6. Other activities: 6.1 Production in industrial installations of:
(a) pulp from timber or other fibrous materials;
(b) paper or card board; Reducing total suspended solids (TSS) to water. The BAT-AEL emission level is 0,4 – 1,5 kg/ADt.
valid
2019-04-23
2019-04-23
PP-TSS-BAT33-IV
Production of pulp, paper and board - TSS - BAT33-IV
6. Other activities: 6.1 Production in industrial installations of:
(a) pulp from timber or other fibrous materials;
(b) paper or card board; Reducing total suspended solids (TSS) to water. The BAT-AEL emission level is 0,5 – 2,0 kg/ADt.
valid
2019-04-23
2019-04-23
PP-TSS-BAT33-XI
Production of pulp, paper and board - TSS - BAT33-XI
6. Other activities: 6.1 Production in industrial installations of:
(a) pulp from timber or other fibrous materials;
(b) paper or card board; Reducing total suspended solids (TSS) to water. The BAT-AEL emission level is 0,5 – 1,3 kg/ADt.
valid
2019-04-23
2019-04-23
PP-TSS-BAT40-II
Production of pulp, paper and board - TSS - BAT40-II
6. Other activities: 6.1 Production in industrial installations of:
(a) pulp from timber or other fibrous materials;
(b) paper or card board; Reducing total suspended solids (TSS) to water. The BAT-AEL emission level is 0,06 – 0,45 kg/t.
valid
2019-04-23
2019-04-23
PP-TSS-BAT40-VI
Production of pulp, paper and board - TSS - BAT40-VI
6. Other activities: 6.1 Production in industrial installations of:
(a) pulp from timber or other fibrous materials;
(b) paper or card board; Reducing total suspended solids (TSS) to water. The BAT-AEL emission level is 0,5 – 0,9 kg/ADt.
valid
2019-04-23
2019-04-23
PP-TSS-BAT45-II
Production of pulp, paper and board - TSS - BAT45-II
6. Other activities: 6.1 Production in industrial installations of:
(a) pulp from timber or other fibrous materials;
(b) paper or card board; Reducing total suspended solids (TSS) to water. The BAT-AEL emission level is 0,02 - 0,2 kg/t.
valid
2019-04-23
2019-04-23
PP-TSS-BAT45-IX
Production of pulp, paper and board - TSS - BAT45-IX
6. Other activities: 6.1 Production in industrial installations of:
(a) pulp from timber or other fibrous materials;
(b) paper or card board; Reducing total suspended solids (TSS) to water. The BAT-AEL emission level is 0,1 - 0,4 kg/t.
valid
2019-04-23
2019-04-23
PP-TSS-BAT45-VIII
Production of pulp, paper and board - TSS - BAT45-VIII
6. Other activities: 6.1 Production in industrial installations of:
(a) pulp from timber or other fibrous materials;
(b) paper or card board; Reducing total suspended solids (TSS) to water. The BAT-AEL emission level is 0,08 - 0,3 kg/t.
valid
2019-04-23
2019-04-23
PP-TSS-BAT50-II
Production of pulp, paper and board - TSS - BAT50-II
6. Other activities: 6.1 Production in industrial installations of:
(a) pulp from timber or other fibrous materials;
(b) paper or card board; Reducing total suspended solids (TSS) to water. The BAT-AEL emission level is 0,02 – 0,35 kg/t.
valid
2019-04-23
2019-04-23
PP-TSS-BAT50-VIII
Production of pulp, paper and board - TSS - BAT50-VIII
6. Other activities: 6.1 Production in industrial installations of:
(a) pulp from timber or other fibrous materials;
(b) paper or card board; Reducing total suspended solids (TSS) to water. The BAT-AEL emission level is 0,10 – 1 kg/t .
valid
2019-04-23
2019-04-23
REF-Benzene-BAT12-IX
Refining of mineral oil and gas - Benzene - BAT12-IX
Energy industries : 1.2 Refining of mineral oil and gas Reducing benzene to water. The BAT-AEL emission level is 0,001 - 0,05 mg/l.
valid
2019-04-23
2019-04-23
REF-Benzene-BAT52-II
Refining of mineral oil and gas - Benzene - BAT52-II
Energy industries : 1.2 Refining of mineral oil and gas; Techniques (i) - (v) (see table); Reducing benzene emissions to air. The BAT-AEL emission level is < 1 mg/Nm3.
valid
2019-04-23
2019-04-23
REF-CO-BAT27
Refining of mineral oil and gas - CO - BAT27
Energy industries : 1.2 Refining of mineral oil and gas; Partial combustion mode
; Reducing carbon monoxide (CO) emissions to air. The BAT-AEL emission level is ≤ 100 mg/Nm3.
valid
2019-04-23
2019-04-23
REF-CO-BAT37
Refining of mineral oil and gas - CO - BAT37
Energy industries : 1.2 Refining of mineral oil and gas; Combustion operation control; Reducing carbon monoxide (CO) emissions to air. The BAT-AEL emission level is ≤ 100 mg/Nm3.
valid
2019-04-23
2019-04-23
REF-COD-BAT12-III
Refining of mineral oil and gas - COD - BAT12-III
Energy industries : 1.2 Refining of mineral oil and gas Reducing chemical oxygen demand (COD) to water. The BAT-AEL emission level is 30 - 125 mg/l.
valid
2019-04-23
2019-04-23
REF-Cd-BAT12-VI
Refining of mineral oil and gas - Cd - BAT12-VI
Energy industries : 1.2 Refining of mineral oil and gas Reducing cadmium to water. The BAT-AEL emission level is 0,002 - 0,008 mg/l.
valid
2019-04-23
2019-04-23
REF-Dust-BAT25-I
Refining of mineral oil and gas - Dust - BAT25-I
Energy industries : 1.2 Refining of mineral oil and gas; Techniques I - II (see table); for New unit; Reducing dust emissions to air. The BAT-AEL emission level is 10 - 25 mg/Nm3.
valid
2019-04-23
2019-04-23
REF-Dust-BAT25-II
Refining of mineral oil and gas - Dust - BAT25-II
Energy industries : 1.2 Refining of mineral oil and gas; Techniques I - II (see table); for Existing unit; Reducing dust emissions to air. The BAT-AEL emission level is 10 - 50 mg/Nm3.
valid
2019-04-23
2019-04-23
REF-Dust-BAT32
Refining of mineral oil and gas - Dust - BAT32
Energy industries : 1.2 Refining of mineral oil and gas; Techniques (i) - (ii) (see table); Reducing dust emissions to air. The BAT-AEL emission level is 10 - 50 mg/Nm3.
valid
2019-04-23
2019-04-23
REF-Dust-BAT35-I
Refining of mineral oil and gas - Dust - BAT35-I
Energy industries : 1.2 Refining of mineral oil and gas; Multi-fuel firing for Existing unit; Reducing dust emissions to air. The BAT-AEL emission level is 5 - 50 mg/Nm3.
valid
2019-04-23
2019-04-23
REF-Dust-BAT35-II
Refining of mineral oil and gas - Dust - BAT35-II
Energy industries : 1.2 Refining of mineral oil and gas; Multi-fuel firing for New unit < 50 MW; Reducing dust emissions to air. The BAT-AEL emission level is 5 - 25 mg/Nm3.
valid
2019-04-23
2019-04-23
REF-HOI-BAT12-I
Refining of mineral oil and gas - HOI - BAT12-I
Energy industries : 1.2 Refining of mineral oil and gas Reducing hydrocarbon oil index (HOI) to water. The BAT-AEL emission level is 0,1 - 2,5 mg/l.
valid
2019-04-23
2019-04-23
REF-Hg-BAT12-VIII
Refining of mineral oil and gas - Hg - BAT12-VIII
Energy industries : 1.2 Refining of mineral oil and gas Reducing mercury to water. The BAT-AEL emission level is 0,0001 - 0,001 mg/l.
valid
2019-04-23
2019-04-23
REF-N-BAT12-IV
Refining of mineral oil and gas - N - BAT12-IV
Energy industries : 1.2 Refining of mineral oil and gas Reducing total nitrogen to water. The BAT-AEL emission level is 1 - 25 mg/l.
valid
2019-04-23
2019-04-23
REF-NH3-BAT8
Refining of mineral oil and gas - NH3 - BAT8
1, Energy industries : 1.2 Refining of mineral oil and gas; SCR/SNCR; Reducing ammonia (NH3) emissions to air. The BAT-AEL emission level is < 5 - 15 mg/Nm3.
valid
2019-04-23
2019-04-23
REF-NMVOC-BAT52-I
Refining of mineral oil and gas - NMVOC - BAT52-I
Energy industries : 1.2 Refining of mineral oil and gas; Techniques (i) - (v) (see table); Reducing NMVOC emissions to air. The BAT-AEL emission level is 0,15 - 10 g/Nm3.
valid
2019-04-23
2019-04-23
REF-NO2-BAT24-I
Refining of mineral oil and gas - NO2 - BAT24-I
Energy industries : 1.2 Refining of mineral oil and gas; All combustion modes for New unit; Reducing nitrogen oxides (NOx) emissions to air. The BAT-AEL emission level is < 30 - 100 mg/Nm3.
valid
2019-04-23
2019-04-23
REF-NO2-BAT24-II
Refining of mineral oil and gas - NO2 - BAT24-II
Energy industries : 1.2 Refining of mineral oil and gas; Full combustion mode for Existing unit; Reducing nitrogen oxides (NOx) emissions to air. The BAT-AEL emission level is < 100 - 300 mg/Nm3.
valid
2019-04-23
2019-04-23
REF-NO2-BAT24-III
Refining of mineral oil and gas - NO2 - BAT24-III
Energy industries : 1.2 Refining of mineral oil and gas; Partial combustion mode for Existing unit; Reducing nitrogen oxides (NOx) emissions to air. The BAT-AEL emission level is 100 - 400 mg/Nm3.
valid
2019-04-23
2019-04-23
REF-NO2-BAT34-I
Refining of mineral oil and gas - NO2 - BAT34-I
Energy industries : 1.2 Refining of mineral oil and gas; Combustion unit for Existing turbine; Reducing nitrogen oxides (NOx) emissions to air. The BAT-AEL emission level is 40 - 120 mg/Nm3.
valid
2019-04-23
2019-04-23
REF-NO2-BAT34-II
Refining of mineral oil and gas - NO2 - BAT34-II
Energy industries : 1.2 Refining of mineral oil and gas; Gas turbine (including combined cycle gas turbine — CCGT) and integrated gasification combined cycle turbine (IGCC)) for New turbine; Reducing nitrogen oxides (NOx) emissions to air. The BAT-AEL emission level is 20 - 50 mg/Nm3.
valid
2019-04-23
2019-04-23
REF-NO2-BAT34-III
Refining of mineral oil and gas - NO2 - BAT34-III
Energy industries : 1.2 Refining of mineral oil and gas; Gas firing with exception of gas turbines for Existing unit; Reducing nitrogen oxides (NOx) emissions to air. The BAT-AEL emission level is 30 - 150 mg/Nm3.
valid
2019-04-23
2019-04-23
REF-NO2-BAT34-IV
Refining of mineral oil and gas - NO2 - BAT34-IV
Energy industries : 1.2 Refining of mineral oil and gas; Gas firing with exception of gas turbines for New unit; Reducing nitrogen oxides (NOx) emissions to air. The BAT-AEL emission level is 30 - 100 mg/Nm3.
valid
2019-04-23
2019-04-23
REF-NO2-BAT34-V
Refining of mineral oil and gas - NO2 - BAT34-V
Energy industries : 1.2 Refining of mineral oil and gas; Multi-fuel fired combustion unit for Existing unit - should cover both new and existing ones; Reducing nitrogen oxides (NOx) emissions to air. The BAT-AEL emission level is 30 - 300 mg/Nm3.
valid
2019-04-23
2019-04-23
REF-Ni-BAT12-VII
Refining of mineral oil and gas - Ni - BAT12-VII
Energy industries : 1.2 Refining of mineral oil and gas Reducing nickel to water. The BAT-AEL emission level is 0,005 - 0,1 mg/l.
valid
2019-04-23
2019-04-23
REF-Pb-BAT12-V
Refining of mineral oil and gas - Pb - BAT12-V
Energy industries : 1.2 Refining of mineral oil and gas Reducing lead to water. The BAT-AEL emission level is 0,005 - 0,03 mg/l.
valid
2019-04-23
2019-04-23
REF-SO2-BAT26-I
Refining of mineral oil and gas - SO2 - BAT26-I
Energy industries : 1.2 Refining of mineral oil and gas; Techniques I - II (see table); for New units; Reducing sulphur dioxide (SO2) emissions to air. The BAT-AEL emission level is ≤ 300 - mg/Nm3.
valid
2019-04-23
2019-04-23
REF-SO2-BAT26-II
Refining of mineral oil and gas - SO2 - BAT26-II
Energy industries : 1.2 Refining of mineral oil and gas; Full combustion mode
for Existing units; Reducing sulphur dioxide (SO2) emissions to air. The BAT-AEL emission level is < 100 - 800 mg/Nm3.
valid
2019-04-23
2019-04-23
REF-SO2-BAT26-III
Refining of mineral oil and gas - SO2 - BAT26-III
Energy industries : 1.2 Refining of mineral oil and gas; Partial combustion mode
for Existing units; Reducing sulphur dioxide (SO2) emissions to air. The BAT-AEL emission level is < 100 - 1200 mg/Nm3.
valid
2019-04-23
2019-04-23
REF-SO2-BAT36-I
Refining of mineral oil and gas - SO2 - BAT36-I
Energy industries : 1.2 Refining of mineral oil and gas; RFG; Reducing sulphur dioxide (SO2) emissions to air. The BAT-AEL emission level is 5 - 35 mg/Nm3.
valid
2019-04-23
2019-04-23
REF-SO2-BAT36-II
Refining of mineral oil and gas - SO2 - BAT36-II
Energy industries : 1.2 Refining of mineral oil and gas; Multi-fuel fired combustion units, with the exception of gas turbines and stationary gas engines for Existing units; Reducing sulphur dioxide (SO2) emissions to air. The BAT-AEL emission level is 35 - 600 mg/Nm3.
valid
2019-04-23
2019-04-23
REF-TSS-BAT12-II
Refining of mineral oil and gas - TSS - BAT12-II
Energy industries : 1.2 Refining of mineral oil and gas Reducing total suspended solids (TSS) to water. The BAT-AEL emission level is 5 - 25 mg/l.
valid
2019-04-23
2019-04-23
TAN-BOD5-BAT10-III
Tanning of Hides and Skins - BOD5 - BAT10-III
6, Other activities: 6,3 Tanning of hides and skins where the treatment capacity exceeds 12 tonnes of finished products per day Reducing biological oxygen demand for 5 days (BOD5) to water. The BAT-AEL emission level is 15 - 25 mg/l.
valid
2019-04-23
2019-04-23
TAN-BOD5-BAT10-IV
Tanning of Hides and Skins - BOD5 - BAT10-IV
6, Other activities: 6,11 Independently operated treatment of waste water not covered by Directive 91/271/EEC and discharged by an installation undertaking activities covered under 6.3 Reducing biological oxygen demand for 5 days (BOD5) to water. The BAT-AEL emission level is 15 - 25 mg/l.
valid
2019-04-23
2019-04-23
TAN-COD-BAT10-I
Tanning of Hides and Skins - COD - BAT10-I
6, Other activities: 6,3 Tanning of hides and skins where the treatment capacity exceeds 12 tonnes of finished products per day Reducing chemical oxygen demand (COD) to water. The BAT-AEL emission level is 200 - 500 mg/l.
valid
2019-04-23
2019-04-23
TAN-COD-BAT10-II
Tanning of Hides and Skins - COD - BAT10-II
6, Other activities: 6,11 Independently operated treatment of waste water not covered by Directive 91/271/EEC and discharged by an installation undertaking activities covered under 6.3 Reducing chemical oxygen demand (COD) to water. The BAT-AEL emission level is 200 - 500 mg/l.
valid
2019-04-23
2019-04-23
TAN-Cr-BAT10-IX
Tanning of Hides and Skins - Cr - BAT10-IX
6, Other activities: 6,3 Tanning of hides and skins where the treatment capacity exceeds 12 tonnes of finished products per day Reducing total chromium to water. The BAT-AEL emission level is < 0,3 - 1 mg/l.
valid
2019-04-23
2019-04-23
TAN-Cr-BAT10-X
Tanning of Hides and Skins - Cr - BAT10-X
6, Other activities: 6,11 Independently operated treatment of waste water not covered by Directive 91/271/EEC and discharged by an installation undertaking activities covered under 6.3 Reducing total chromium to water. The BAT-AEL emission level is < 0,3 - 1 mg/l.
valid
2019-04-23
2019-04-23
TAN-Cr-BAT11-I
Tanning of Hides and Skins - Cr - BAT11-I
6, Other activities: 6,3 Tanning of hides and skins where the treatment capacity exceeds 12 tonnes of finished products per day Reducing total chromium to water. The BAT-AEL emission level is < 0,3 - 1 mg/l.
valid
2019-04-23
2019-04-23
TAN-Cr-BAT11-II
Tanning of Hides and Skins - Cr - BAT11-II
6, Other activities: 6,11 Independently operated treatment of waste water not covered by Directive 91/271/EEC and discharged by an installation undertaking activities covered under 6.3 Reducing total chromium to water. The BAT-AEL emission level is < 0,3 - 1 mg/l.
valid
2019-04-23
2019-04-23
TAN-Cr-BAT11-III
Tanning of Hides and Skins - Cr - BAT11-III
6, Other activities: 6,3 Tanning of hides and skins where the treatment capacity exceeds 12 tonnes of finished products per day Reducing total chromium to water. The BAT-AEL emission level is < 0,3 - 1 mg/l.
valid
2019-04-23
2019-04-23
TAN-Cr-BAT12-I
Tanning of Hides and Skins - Cr - BAT12-I
6, Other activities: 6,3 Tanning of hides and skins where the treatment capacity exceeds 12 tonnes of finished products per day Reducing total chromium to water. The BAT-AEL emission level is < 0,3 - 1 mg/l.
valid
2019-04-23
2019-04-23
TAN-N-BAT10-VII
Tanning of Hides and Skins - N - BAT10-VII
6, Other activities: 6,3 Tanning of hides and skins where the treatment capacity exceeds 12 tonnes of finished products per day Reducing ammoniacal nitrogen (NH4-N) to water. The BAT-AEL emission level is < 10 mg/l.
valid
2019-04-23
2019-04-23
TAN-N-BAT10-VIII
Tanning of Hides and Skins - N - BAT10-VIII
6, Other activities: 6,11 Independently operated treatment of waste water not covered by Directive 91/271/EEC and discharged by an installation undertaking activities covered under 6.3 Reducing ammoniacal nitrogen (NH4-N) to water. The BAT-AEL emission level is < 10 mg/l.
valid
2019-04-23
2019-04-23
TAN-PM-BAT20
Tanning of Hides and Skins - PM - BAT20
6, Other activities: 6,3 Tanning of hides and skins where the treatment capacity exceeds 12 tonnes of finished products per day; Extraction ventilation system with bag filters or wet scrubbers; Reducing particulate matter emissions to air. The BAT-AEL emission level is 3 - 6 mg/Nm3.
valid
2019-04-23
2019-04-23
TAN-S-BAT10-XI
Tanning of Hides and Skins - S - BAT10-XI
6, Other activities: 6,3 Tanning of hides and skins where the treatment capacity exceeds 12 tonnes of finished products per day Reducing sulphide to water. The BAT-AEL emission level is < 1 mg/l.
valid
2019-04-23
2019-04-23
TAN-S-BAT10-XII
Tanning of Hides and Skins - S - BAT10-XII
6, Other activities: 6,11 Independently operated treatment of waste water not covered by Directive 91/271/EEC and discharged by an installation undertaking activities covered under 6.3 Reducing sulphide to water. The BAT-AEL emission level is < 1 mg/l.
valid
2019-04-23
2019-04-23
TAN-S-BAT12-II
Tanning of Hides and Skins - S - BAT12-II
6, Other activities: 6,3 Tanning of hides and skins where the treatment capacity exceeds 12 tonnes of finished products per day Reducing sulphide to water. The BAT-AEL emission level is < 1 mg/l.
valid
2019-04-23
2019-04-23
TAN-SS-BAT10-V
Tanning of Hides and Skins - SS - BAT10-V
6, Other activities: 6,3 Tanning of hides and skins where the treatment capacity exceeds 12 tonnes of finished products per day Reducing suspended solids to water. The BAT-AEL emission level is < 35 mg/l.
valid
2019-04-23
2019-04-23
TAN-SS-BAT10-VI
Tanning of Hides and Skins - SS - BAT10-VI
6, Other activities: 6,11 Independently operated treatment of waste water not covered by Directive 91/271/EEC and discharged by an installation undertaking activities covered under 6.3 Reducing suspended solids to water. The BAT-AEL emission level is < 35 mg/l.
valid
2019-04-23
2019-04-23
TAN-TC-BAT19
Tanning of Hides and Skins - TC - BAT19
6, Other activities: 6,3 Tanning of hides and skins where the treatment capacity exceeds 12 tonnes of finished products per day; Techniques (a)-(b) (see table); Reducing volatile organic compounds (VOC) emissions to air. The BAT-AEL emission level is 9 - 23 g/m2.
valid
2019-04-23
2019-04-23
WBP-C-BAT17-IV
Production of Wood-based Panels - C - BAT17-IV
6, Other activities: 6,1 Production in industrial installations of: (c) one or more of the following wood-based panels: oriented strand board, particleboard or fibreboard with a production capacity exceeding 600 m3 per day; For PB and all dryer types; Reducing total Volatile Organic Compounds (TVOC) emissions to air. The BAT-AEL emission level is < 20 - 200 mg/Nm3.
valid
2019-04-23
2019-04-23
WBP-C-BAT17-V
Production of Wood-based Panels - C - BAT17-V
6, Other activities: 6,1 Production in industrial installations of: (c) one or more of the following wood-based panels: oriented strand board, particleboard or fibreboard with a production capacity exceeding 600 m3 per day; For OSB and all dryer types; Reducing total Volatile Organic Compounds (TVOC) emissions to air. The BAT-AEL emission level is 10 - 400 mg/Nm3.
valid
2019-04-23
2019-04-23
WBP-C-BAT17-VI
Production of Wood-based Panels - C - BAT17-VI
6, Other activities: 6,1 Production in industrial installations of: (c) one or more of the following wood-based panels: oriented strand board, particleboard or fibreboard with a production capacity exceeding 600 m3 per day; For fibre and all dryer types; Reducing total Volatile Organic Compounds (TVOC) emissions to air. The BAT-AEL emission level is < 20 - 120 mg/Nm3.
valid
2019-04-23
2019-04-23
WBP-C-BAT19-II
Production of Wood-based Panels - C - BAT19-II
6, Other activities: 6,1 Production in industrial installations of: (c) one or more of the following wood-based panels: oriented strand board, particleboard or fibreboard with a production capacity exceeding 600 m3 per day; Techniques (a)-(f) (see table); Reducing total Volatile Organic Compounds (TVOC) emissions to air. The BAT-AEL emission level is 10 - 100 mg/Nm3.
valid
2019-04-23
2019-04-23
WBP-C-BAT21-I
Production of Wood-based Panels - C - BAT21-I
6, Other activities: 6,1 Production in industrial installations of: (c) one or more of the following wood-based panels: oriented strand board, particleboard or fibreboard with a production capacity exceeding 600 m3 per day; Techniques (a)-(e) (see table); Reducing total Volatile Organic Compounds (TVOC) emissions to air. The BAT-AEL emission level is 5 - 30 mg/Nm3.
valid
2019-04-23
2019-04-23
WBP-CH2O-BAT17-IX
Production of Wood-based Panels - CH2O - BAT17-IX
6, Other activities: 6,1 Production in industrial installations of: (c) one or more of the following wood-based panels: oriented strand board, particleboard or fibreboard with a production capacity exceeding 600 m3 per day; For fibre and all dryer types; Reducing formaldehyde emissions to air. The BAT-AEL emission level is < 5 - 15 mg/Nm3.
valid
2019-04-23
2019-04-23
WBP-CH2O-BAT17-VII
Production of Wood-based Panels - CH2O - BAT17-VII
6, Other activities: 6,1 Production in industrial installations of: (c) one or more of the following wood-based panels: oriented strand board, particleboard or fibreboard with a production capacity exceeding 600 m3 per day; For PB and all dryer types; Reducing formaldehyde emissions to air. The BAT-AEL emission level is < 5 - 10 mg/Nm3.
valid
2019-04-23
2019-04-23
WBP-CH2O-BAT17-VIII
Production of Wood-based Panels - CH2O - BAT17-VIII
6, Other activities: 6,1 Production in industrial installations of: (c) one or more of the following wood-based panels: oriented strand board, particleboard or fibreboard with a production capacity exceeding 600 m3 per day; For OSB and all dryer types; Reducing formaldehyde emissions to air. The BAT-AEL emission level is < 5 - 20 mg/Nm3.
valid
2019-04-23
2019-04-23
WBP-CH2O-BAT19-III
Production of Wood-based Panels - CH2O - BAT19-III
6, Other activities: 6,1 Production in industrial installations of: (c) one or more of the following wood-based panels: oriented strand board, particleboard or fibreboard with a production capacity exceeding 600 m3 per day; Techniques (a)-(f) (see table); Reducing formaldehyde emissions to air. The BAT-AEL emission level is 2 - 15 mg/Nm3.
valid
2019-04-23
2019-04-23
WBP-CH2O-BAT21-II
Production of Wood-based Panels - CH2O - BAT21-II
6, Other activities: 6,1 Production in industrial installations of: (c) one or more of the following wood-based panels: oriented strand board, particleboard or fibreboard with a production capacity exceeding 600 m3 per day; Techniques (a)-(e) (see table); Reducing formaldehyde emissions to air. The BAT-AEL emission level is < 5 - 10 mg/Nm3.
valid
2019-04-23
2019-04-23
WBP-COD-BAT27-II
Production of Wood-based Panels - COD - BAT27-II
6, Other activities: 6,1 Production in industrial installations of: (c) one or more of the following wood-based panels: oriented strand board, particleboard or fibreboard with a production capacity exceeding 600 m3 per day. Reducing chemical oxygen demand (COD) to water. The BAT-AEL emission level is 20 - 200 mg/l.
valid
2019-04-23
2019-04-23
WBP-NO2-BAT18
Production of Wood-based Panels - NO2 - BAT18
6, Other activities: 6,1 Production in industrial installations of: (c) one or more of the following wood-based panels: oriented strand board, particleboard or fibreboard with a production capacity exceeding 600 m3 per day; Techniques (a)-(b) (see table); Reducing nitrogen oxides (NOx) emissions to air. The BAT-AEL emission level is 30 - 250 mg/Nm3.
valid
2019-04-23
2019-04-23
WBP-TPM-BAT17-I
Production of Wood-based Panels - TPM - BAT17-I
6, Other activities: 6,1 Production in industrial installations of: (c) one or more of the following wood-based panels: oriented strand board, particleboard or fibreboard with a production capacity exceeding 600 m3 per day; For PB or OSB and directly heated dryer; Reducing dust emissions to air. The BAT-AEL emission level is 3 - 30 mg/Nm3.
valid
2019-04-23
2019-04-23
WBP-TPM-BAT17-II
Production of Wood-based Panels - TPM - BAT17-II
6, Other activities: 6,1 Production in industrial installations of: (c) one or more of the following wood-based panels: oriented strand board, particleboard or fibreboard with a production capacity exceeding 600 m3 per day; For PB or OSB and indirectly heated dryer; Reducing dust emissions to air. The BAT-AEL emission level is 3 - 10 mg/Nm3.
valid
2019-04-23
2019-04-23
WBP-TPM-BAT17-III
Production of Wood-based Panels - TPM - BAT17-III
6, Other activities: 6,1 Production in industrial installations of: (c) one or more of the following wood-based panels: oriented strand board, particleboard or fibreboard with a production capacity exceeding 600 m3 per day; For fibre and all dryer types; Reducing dust emissions to air. The BAT-AEL emission level is 3 - 20 mg/Nm3.
valid
2019-04-23
2019-04-23
WBP-TPM-BAT19-I
Production of Wood-based Panels - TPM - BAT19-I
6, Other activities: 6,1 Production in industrial installations of: (c) one or more of the following wood-based panels: oriented strand board, particleboard or fibreboard with a production capacity exceeding 600 m3 per day; Techniques (a)-(f) (see table); Reducing dust emissions to air. The BAT-AEL emission level is 3 - 15 mg/Nm3.
valid
2019-04-23
2019-04-23
WBP-TPM-BAT20
Production of Wood-based Panels - TPM - BAT20
6, Other activities: 6,1 Production in industrial installations of: (c) one or more of the following wood-based panels: oriented strand board, particleboard or fibreboard with a production capacity exceeding 600 m3 per day; Bag filter or cyclofilter; Reducing dust emissions to air. The BAT-AEL emission level is < 3 - 5 mg/Nm3.
valid
2019-04-23
2019-04-23
WBP-TSS-BAT25
Production of Wood-based Panels - TSS - BAT25
6, Other activities: 6,1 Production in industrial installations of: (c) one or more of the following wood-based panels: oriented strand board, particleboard or fibreboard with a production capacity exceeding 600 m3 per day. Reducing total suspended solids (TSS) to water. The BAT-AEL emission level is 10 - 40 mg/l.
valid
2019-04-23
2019-04-23
WBP-TSS-BAT27-I
Production of Wood-based Panels - TSS - BAT27-I
6, Other activities: 6,1 Production in industrial installations of: (c) one or more of the following wood-based panels: oriented strand board, particleboard or fibreboard with a production capacity exceeding 600 m3 per day. Reducing total suspended solids (TSS) to water. The BAT-AEL emission level is 5 - 35 mg/l.
valid
2019-04-23
2019-04-23
WI-As-BAT34-III
Waste Incineration - As - BAT34-III
Waste management reducing arsenic to water. The BAT-AEL emission level is 0.01–0.05 mg/l.
valid
2020-05-25
2020-05-25
WI-As-BAT34-XVI
Waste Incineration - As - BAT34-XVI
Waste management reducing arsenic to water. The BAT-AEL emission level is 0.01–0.05 mg/l.
valid
2020-05-25
2020-05-25
WI-C-BAT30-I
Waste Incineration - C - BAT30-I
Waste management reducing volatile organic compounds (VOC) emissions to air. The BAT-AEL emission level is < 3–10 mg/Nm3.
valid
2020-05-25
2020-05-25
WI-CO-BAT29-III
Waste Incineration - CO - BAT29-III
Waste management reducing carbon monoxide emissions to air. The BAT-AEL emission level is 10–50mg/Nm3.
valid
2020-05-25
2020-05-25
WI-Cd-BAT34-IV
Waste Incineration - Cd - BAT34-IV
Waste management reducing cadmium to water. The BAT-AEL emission level is 0.005–0.03 mg/l.
valid
2020-05-25
2020-05-25
WI-Cd-BAT34-XVII
Waste Incineration - Cd - BAT34-XVII
Waste management reducing cadmium to water. The BAT-AEL emission level is 0.005–0.03 mg/l.
valid
2020-05-25
2020-05-25
WI-CdTl-BAT25-II
Waste Incineration - CdTl - BAT25-II
Waste management reducing cadmium, thallium and their compounds emissions to air. The BAT-AEL emission level is 0.005–0.02 mg/Nm3.
valid
2020-05-25
2020-05-25
WI-Cr-BAT34-V
Waste Incineration - Cr - BAT34-V
Waste management reducing chromium to water. The BAT-AEL emission level is 0.01–0.1 mg/l.
valid
2020-05-25
2020-05-25
WI-Cr-BAT34-XVIII
Waste Incineration - Cr - BAT34-XVIII
Waste management reducing chromium to water. The BAT-AEL emission level is 0.01–0.1 mg/l.
valid
2020-05-25
2020-05-25
WI-Cu-BAT34-VI
Waste Incineration - Cu - BAT34-VI
Waste management reducing copper to water. The BAT-AEL emission level is 0.03–0.15 mg/l.
valid
2020-05-25
2020-05-25
WI-Cu-BAT34-XIX
Waste Incineration - Cu - BAT34-XIX
Waste management reducing copper to water. The BAT-AEL emission level is 0.03–0.15 mg/l.
valid
2020-05-25
2020-05-25
WI-Dust-BAT25-I
Waste Incineration - Dust - BAT25-I
Waste management reducing dust emissions to air. The BAT-AEL emission level is 2–5 mg/Nm3.
valid
2020-05-25
2020-05-25
WI-Dust-BAT26
Waste Incineration - Dust - BAT26
Waste management reducing dust emissions to air. The BAT-AEL emission level is 2-5 mg/Nm3.
valid
2020-05-25
2020-05-25
WI-HCI-BAT28-I
Waste Incineration - HCI - BAT28-I
Waste management reducing hydrogen chloride emissions to air. The BAT-AEL emission level is < 2–8 mg/Nm3.
valid
2020-05-25
2020-05-25
WI-HCI-BAT28-II
Waste Incineration - HCI - BAT28-II
Waste management reducing hydrogen chloride emissions to air. The BAT-AEL emission level is <2–6 mg/Nm3.
valid
2020-05-25
2020-05-25
WI-HF-BAT28-III
Waste Incineration - HF - BAT28-III
Waste management reducing hydrogen fluoride emissions to air. The BAT-AEL emission level is < 1 mg/Nm3.
valid
2020-05-25
2020-05-25
WI-HF-BAT28-IV
Waste Incineration - HF - BAT28-IV
Waste management reducing hydrogen fluoride emissions to air. The BAT-AEL emission level is < 1 mg/Nm3.
valid
2020-05-25
2020-05-25
WI-Hg-BAT31-I
Waste Incineration - Hg - BAT31-I
Waste management reducing sulphur dioxide (SO2) emissions to air. The BAT-AEL emission level is 1–10 µg/Nm3.
valid
2020-05-25
2020-05-25
WI-Hg-BAT31-II
Waste Incineration - Hg - BAT31-II
Waste management reducing sulphur dioxide (SO2) emissions to air. The BAT-AEL emission level is < 5–20 µg/Nm3.
valid
2020-05-25
2020-05-25
WI-Hg-BAT34-VII
Waste Incineration - Hg - BAT34-VII
Waste management reducing sulphur dioxide (SO2) to water. The BAT-AEL emission level is 0.001–0.01 mg/l.
valid
2020-05-25
2020-05-25
WI-Hg-BAT34-XX
Waste Incineration - Hg - BAT34-XX
Waste management reducing sulphur dioxide (SO2) to water. The BAT-AEL emission level is 0.001–0.01 mg/l.
valid
2020-05-25
2020-05-25
WI-NH3-BAT29-IV
Waste Incineration - NH3 - BAT29-IV
Waste management reducing total nitrogen emissions to air. The BAT-AEL emission level is 2–10 mg/Nm3.
valid
2020-05-25
2020-05-25
WI-NH4-N-BAT34-XIII
Waste Incineration - NH4-N - BAT34-XIII
Waste management reducing total nitrogen to water. The BAT-AEL emission level is 10–30 mg/l.
valid
2020-05-25
2020-05-25
WI-NOx-BAT29-I
Waste Incineration - NOx - BAT29-I
Waste management reducing nitrogen oxides emissions to air. The BAT-AEL emission level is 50–150 mg/Nm3.
valid
2020-05-25
2020-05-25
WI-NOx-BAT29-II
Waste Incineration - NOx - BAT29-II
Waste management reducing nitrogen oxides emissions to air. The BAT-AEL emission level is 50–120 mg/Nm3.
valid
2020-05-25
2020-05-25
WI-Ni-BAT34-VIII
Waste Incineration - Ni - BAT34-VIII
Waste management reducing nickel to water. The BAT-AEL emission level is 0.03–0.15 mg/l.
valid
2020-05-25
2020-05-25
WI-Ni-BAT34-XXI
Waste Incineration - Ni - BAT34-XXI
Waste management reducing nickel to water. The BAT-AEL emission level is 0.03–0.15 mg/l.
valid
2020-05-25
2020-05-25
WI-PCDDF-BAT30-II
Waste Incineration - PCDDF - BAT30-II
Waste management reducing polychlorinaned dibenzo- dioxins and - furans emissions to air. The BAT-AEL emission level is < 0.01–0.06 ng I-TEQ/Nm3 for the average over the sampling period
< 0.01–0.08 ng I-TEQ/Nm3 for the long-term sampling period.
valid
2020-05-25
2020-05-25
WI-PCDDF-BAT30-III
Waste Incineration - PCDDF - BAT30-III
Waste management reducing polychlorinaned dibenzo- dioxins and - furans emissions to air. The BAT-AEL emission level is < 0.01–0.04 ng I-TEQ/Nm3 for the average over the sampling period
< 0.01–0.06 ng I-TEQ/Nm3 for the long-term sampling period.
valid
2020-05-25
2020-05-25
WI-PCDDF-BAT34-XV
Waste Incineration - PCDDF - BAT34-XV
Waste management reducing polychlorinaned dibenzo- dioxins and - furans to water. The BAT-AEL emission level is 0.01–0.05 ng I-TEQ/l.
valid
2020-05-25
2020-05-25
WI-PCDDFdioxin-BAT30-IV
Waste Incineration - PCDDFdioxin - BAT30-IV
Waste management reducing polychlorinaned dibenzo-dioxins and -furans + Polychlorinated biphenyls emissions to air. The BAT-AEL emission level is < 0.01–0.08 ng WHO-TEQ/Nm3 for the average over the sampling period
< 0.01–0.1 ng WHO-TEQ/Nm3 for the long-term sampling period.
valid
2020-05-25
2020-05-25
WI-PCDDFdioxin-BAT30-V
Waste Incineration - PCDDFdioxin - BAT30-V
Waste management reducing polychlorinaned dibenzo-dioxins and -furans + Polychlorinated biphenyls emissions to air. The BAT-AEL emission level is < 0.01–0.06 ng WHO-TEQ/Nm3 for the average over the sampling period
< 0.01–0.08 ng WHO-TEQ/Nm3 for the long-term sampling period.
valid
2020-05-25
2020-05-25
WI-Pb-BAT34-IX
Waste Incineration - Pb - BAT34-IX
Waste management reducing lead to water. The BAT-AEL emission level is 0.02–0.06 mg/l.
valid
2020-05-25
2020-05-25
WI-Pb-BAT34-XXII
Waste Incineration - Pb - BAT34-XXII
Waste management reducing lead to water. The BAT-AEL emission level is 0.02–0.06 mg/l.
valid
2020-05-25
2020-05-25
WI-SO2-BAT28-V
Waste Incineration - SO2 - BAT28-V
Waste management reducing sulphur dioxide (SO2) emissions to air. The BAT-AEL emission level is 5–40 mg/Nm3.
valid
2020-05-25
2020-05-25
WI-SO2-BAT28-VI
Waste Incineration - SO2 - BAT28-VI
Waste management reducing sulphur dioxide (SO2) emissions to air. The BAT-AEL emission level is 5–30 mg/Nm3.
valid
2020-05-25
2020-05-25
WI-SO4-BAT34-XIV
Waste Incineration - SO4 - BAT34-XIV
Waste management reducing sulphates to water. The BAT-AEL emission level is 1400–1 000 mg/l.
valid
2020-05-25
2020-05-25
WI-Sb-BAT34-X
Waste Incineration - Sb - BAT34-X
Waste management reducing antimony to water. The BAT-AEL emission level is 0.02–0.9 mg/l.
valid
2020-05-25
2020-05-25
WI-Sb-BAT34-XXIII
Waste Incineration - Sb - BAT34-XXIII
Waste management reducing antimony to water. The BAT-AEL emission level is 0.02–0.9 mg/l.
valid
2020-05-25
2020-05-25
WI-SbAsPbCrCoCuMnNiV-BAT25-III
Waste Incineration - SbAsPbCrCoCuMnNiV - BAT25-III
Waste management reducing metals emissions to air. The BAT-AEL emission level is 0.01–0.3 mg/Nm3.
valid
2020-05-25
2020-05-25
WI-TOC-BAT34-II
Waste Incineration - TOC - BAT34-II
Waste management reducing total organic carbon (TOC) to water. The BAT-AEL emission level is 15–40 mg/l.
valid
2020-05-25
2020-05-25
WI-TSS-BAT34-I
Waste Incineration - TSS - BAT34-I
Waste management reducing total suspended solids to water. The BAT-AEL emission level is 10–30 mg/l.
valid
2020-05-25
2020-05-25
WI-Tl-BAT34-XI
Waste Incineration - Tl - BAT34-XI
Waste management reducing thallium to water. The BAT-AEL emission level is 0.005–0.03 mg/l.
valid
2020-05-25
2020-05-25
WI-Tl-BAT34-XXIV
Waste Incineration - Tl - BAT34-XXIV
Waste management reducing thallium to water. The BAT-AEL emission level is 0.005–0.03 mg/l.
valid
2020-05-25
2020-05-25
WI-Zn-BAT34-XII
Waste Incineration - Zn - BAT34-XII
Waste management reducing zinc to water. The BAT-AEL emission level is 0.01–0.5 mg/l.
valid
2020-05-25
2020-05-25
WI-Zn-BAT34-XXV
Waste Incineration - Zn - BAT34-XXV
Waste management reducing zinc to water. The BAT-AEL emission level is 0.01–0.5 mg/l.
valid
2020-05-25
2020-05-25
WT-AOX-BAT20-XIV
Waste Treatment - AOX - BAT20-XIV
5. Waste management; 6. Other activities: 5.1. Disposal or recovery of hazardous waste with a capacity exceeding 10 tonnes per day involving one or more of the following activities: (a)-(j) (see scope); 5.3. (a) Disposal of non-hazardous waste with a capacity exceeding 50 tonnes per day involving one or more of the following activities, and excluding activities covered by Council Directive 91/271/EEC (1): (i)-(v) (see scope). (b) Recovery, or a mix of recovery and disposal, of non-hazardous waste with a capacity exceeding 75 tonnes per day involving one or more of the following activities, and excluding activities covered by Directive 91/271/EEC: (i)-(iv) (see scope). 5.5. Temporary storage of hazardous waste not covered under point 5.4 of Annex I to Directive 2010/75/EU pending any of the activities listed in points 5.1, 5.2, 5.4 and 5.6 of Annex I to Directive 2010/75/EU with a total capacity exceeding 50 tonnes, excluding temporary storage, pending collection, on the site where the waste is generated. 6.11. Independently operated treatment of waste water not covered by Directive 91/271/EEC and discharged by an installation undertaking activities covered under points 5.1, 5.3 or 5.5 as listed above. Reducing adsorbable organically bound halogens to water. The BAT-AEL emission level is 0,2-1 mg/l .
valid
2019-04-23
2019-04-23
WT-AOX-BAT20-XXXIV
Waste Treatment - AOX - BAT20-XXXIV
5. Waste management; 6. Other activities: 5.1. Disposal or recovery of hazardous waste with a capacity exceeding 10 tonnes per day involving one or more of the following activities: (a)-(j) (see scope); 5.3. (a) Disposal of non-hazardous waste with a capacity exceeding 50 tonnes per day involving one or more of the following activities, and excluding activities covered by Council Directive 91/271/EEC (1): (i)-(v) (see scope). (b) Recovery, or a mix of recovery and disposal, of non-hazardous waste with a capacity exceeding 75 tonnes per day involving one or more of the following activities, and excluding activities covered by Directive 91/271/EEC: (i)-(iv) (see scope). 5.5. Temporary storage of hazardous waste not covered under point 5.4 of Annex I to Directive 2010/75/EU pending any of the activities listed in points 5.1, 5.2, 5.4 and 5.6 of Annex I to Directive 2010/75/EU with a total capacity exceeding 50 tonnes, excluding temporary storage, pending collection, on the site where the waste is generated. 6.11. Independently operated treatment of waste water not covered by Directive 91/271/EEC and discharged by an installation undertaking activities covered under points 5.1, 5.3 or 5.5 as listed above. Reducing adsorbable organically bound halogens to water. The BAT-AEL emission level is 0,2-1 mg/l .
valid
2019-04-23
2019-04-23
WT-As-BAT20-XLIII
Waste Treatment - As - BAT20-XLIII
5. Waste management; 6. Other activities: 5.1. Disposal or recovery of hazardous waste with a capacity exceeding 10 tonnes per day involving one or more of the following activities: (a)-(j) (see scope); 5.3. (a) Disposal of non-hazardous waste with a capacity exceeding 50 tonnes per day involving one or more of the following activities, and excluding activities covered by Council Directive 91/271/EEC (1): (i)-(v) (see scope). (b) Recovery, or a mix of recovery and disposal, of non-hazardous waste with a capacity exceeding 75 tonnes per day involving one or more of the following activities, and excluding activities covered by Directive 91/271/EEC: (i)-(iv) (see scope). 5.5. Temporary storage of hazardous waste not covered under point 5.4 of Annex I to Directive 2010/75/EU pending any of the activities listed in points 5.1, 5.2, 5.4 and 5.6 of Annex I to Directive 2010/75/EU with a total capacity exceeding 50 tonnes, excluding temporary storage, pending collection, on the site where the waste is generated. 6.11. Independently operated treatment of waste water not covered by Directive 91/271/EEC and discharged by an installation undertaking activities covered under points 5.1, 5.3 or 5.5 as listed above. Reducing arsenic to water. The BAT-AEL emission level is 0,01-0,1 mg/l.
valid
2019-04-23
2019-04-23
WT-As-BAT20-XV
Waste Treatment - As - BAT20-XV
5. Waste management; 6. Other activities: 5.1. Disposal or recovery of hazardous waste with a capacity exceeding 10 tonnes per day involving one or more of the following activities: (a)-(j) (see scope); 5.3. (a) Disposal of non-hazardous waste with a capacity exceeding 50 tonnes per day involving one or more of the following activities, and excluding activities covered by Council Directive 91/271/EEC (1): (i)-(v) (see scope). (b) Recovery, or a mix of recovery and disposal, of non-hazardous waste with a capacity exceeding 75 tonnes per day involving one or more of the following activities, and excluding activities covered by Directive 91/271/EEC: (i)-(iv) (see scope). 5.5. Temporary storage of hazardous waste not covered under point 5.4 of Annex I to Directive 2010/75/EU pending any of the activities listed in points 5.1, 5.2, 5.4 and 5.6 of Annex I to Directive 2010/75/EU with a total capacity exceeding 50 tonnes, excluding temporary storage, pending collection, on the site where the waste is generated. 6.11. Independently operated treatment of waste water not covered by Directive 91/271/EEC and discharged by an installation undertaking activities covered under points 5.1, 5.3 or 5.5 as listed above. Reducing arsenic to water. The BAT-AEL emission level is 0,01-0,05 mg/l .
valid
2019-04-23
2019-04-23
WT-As-BAT20-XXIII
Waste Treatment - As - BAT20-XXIII
5. Waste management; 6. Other activities: 5.1. Disposal or recovery of hazardous waste with a capacity exceeding 10 tonnes per day involving one or more of the following activities: (a)-(j) (see scope); 5.3. (a) Disposal of non-hazardous waste with a capacity exceeding 50 tonnes per day involving one or more of the following activities, and excluding activities covered by Council Directive 91/271/EEC (1): (i)-(v) (see scope). (b) Recovery, or a mix of recovery and disposal, of non-hazardous waste with a capacity exceeding 75 tonnes per day involving one or more of the following activities, and excluding activities covered by Directive 91/271/EEC: (i)-(iv) (see scope). 5.5. Temporary storage of hazardous waste not covered under point 5.4 of Annex I to Directive 2010/75/EU pending any of the activities listed in points 5.1, 5.2, 5.4 and 5.6 of Annex I to Directive 2010/75/EU with a total capacity exceeding 50 tonnes, excluding temporary storage, pending collection, on the site where the waste is generated. 6.11. Independently operated treatment of waste water not covered by Directive 91/271/EEC and discharged by an installation undertaking activities covered under points 5.1, 5.3 or 5.5 as listed above. Reducing arsenic to water. The BAT-AEL emission level is 0,01-0,1 mg/l.
valid
2019-04-23
2019-04-23
WT-As-BAT20-XXXV
Waste Treatment - As - BAT20-XXXV
5. Waste management; 6. Other activities: 5.1. Disposal or recovery of hazardous waste with a capacity exceeding 10 tonnes per day involving one or more of the following activities: (a)-(j) (see scope); 5.3. (a) Disposal of non-hazardous waste with a capacity exceeding 50 tonnes per day involving one or more of the following activities, and excluding activities covered by Council Directive 91/271/EEC (1): (i)-(v) (see scope). (b) Recovery, or a mix of recovery and disposal, of non-hazardous waste with a capacity exceeding 75 tonnes per day involving one or more of the following activities, and excluding activities covered by Directive 91/271/EEC: (i)-(iv) (see scope). 5.5. Temporary storage of hazardous waste not covered under point 5.4 of Annex I to Directive 2010/75/EU pending any of the activities listed in points 5.1, 5.2, 5.4 and 5.6 of Annex I to Directive 2010/75/EU with a total capacity exceeding 50 tonnes, excluding temporary storage, pending collection, on the site where the waste is generated. 6.11. Independently operated treatment of waste water not covered by Directive 91/271/EEC and discharged by an installation undertaking activities covered under points 5.1, 5.3 or 5.5 as listed above. Reducing arsenic to water. The BAT-AEL emission level is 0,01-0,05 mg/l.
valid
2019-04-23
2019-04-23
WT-CFCs-BAT29-II
Waste Treatment - CFCs - BAT29-II
5. Waste management; 6. Other activities: 5.1. Disposal or recovery of hazardous waste with a capacity exceeding 10 tonnes per day involving one or more of the following activities: (a)-(j) (see scope); 5.3. (a) Disposal of non-hazardous waste with a capacity exceeding 50 tonnes per day involving one or more of the following activities, and excluding activities covered by Council Directive 91/271/EEC (1): (i)-(v) (see scope). (b) Recovery, or a mix of recovery and disposal, of non-hazardous waste with a capacity exceeding 75 tonnes per day involving one or more of the following activities, and excluding activities covered by Directive 91/271/EEC: (i)-(iv) (see scope). 5.5. Temporary storage of hazardous waste not covered under point 5.4 of Annex I to Directive 2010/75/EU pending any of the activities listed in points 5.1, 5.2, 5.4 and 5.6 of Annex I to Directive 2010/75/EU with a total capacity exceeding 50 tonnes, excluding temporary storage, pending collection, on the site where the waste is generated. 6.11. Independently operated treatment of waste water not covered by Directive 91/271/EEC and discharged by an installation undertaking activities covered under points 5.1, 5.3 or 5.5 as listed above; Apply BAT 14d, BAT 14h and use technique (a) and one or both of the techniques (b) and (c); Reducing CFCs emissions to air. The BAT-AEL emission level is 0,5-10 mg/Nm3 .
valid
2019-04-23
2019-04-23
WT-CN-BAT20-XIII
Waste Treatment - CN - BAT20-XIII
5. Waste management; 6. Other activities: 5.1. Disposal or recovery of hazardous waste with a capacity exceeding 10 tonnes per day involving one or more of the following activities: (a)-(j) (see scope); 5.3. (a) Disposal of non-hazardous waste with a capacity exceeding 50 tonnes per day involving one or more of the following activities, and excluding activities covered by Council Directive 91/271/EEC (1): (i)-(v) (see scope). (b) Recovery, or a mix of recovery and disposal, of non-hazardous waste with a capacity exceeding 75 tonnes per day involving one or more of the following activities, and excluding activities covered by Directive 91/271/EEC: (i)-(iv) (see scope). 5.5. Temporary storage of hazardous waste not covered under point 5.4 of Annex I to Directive 2010/75/EU pending any of the activities listed in points 5.1, 5.2, 5.4 and 5.6 of Annex I to Directive 2010/75/EU with a total capacity exceeding 50 tonnes, excluding temporary storage, pending collection, on the site where the waste is generated. 6.11. Independently operated treatment of waste water not covered by Directive 91/271/EEC and discharged by an installation undertaking activities covered under points 5.1, 5.3 or 5.5 as listed above. Reducing free cyanide to water. The BAT-AEL emission level is 0,02-0,1 mg/l .
valid
2019-04-23
2019-04-23
WT-CN-BAT20-XXXIII
Waste Treatment - CN - BAT20-XXXIII
5. Waste management; 6. Other activities: 5.1. Disposal or recovery of hazardous waste with a capacity exceeding 10 tonnes per day involving one or more of the following activities: (a)-(j) (see scope); 5.3. (a) Disposal of non-hazardous waste with a capacity exceeding 50 tonnes per day involving one or more of the following activities, and excluding activities covered by Council Directive 91/271/EEC (1): (i)-(v) (see scope). (b) Recovery, or a mix of recovery and disposal, of non-hazardous waste with a capacity exceeding 75 tonnes per day involving one or more of the following activities, and excluding activities covered by Directive 91/271/EEC: (i)-(iv) (see scope). 5.5. Temporary storage of hazardous waste not covered under point 5.4 of Annex I to Directive 2010/75/EU pending any of the activities listed in points 5.1, 5.2, 5.4 and 5.6 of Annex I to Directive 2010/75/EU with a total capacity exceeding 50 tonnes, excluding temporary storage, pending collection, on the site where the waste is generated. 6.11. Independently operated treatment of waste water not covered by Directive 91/271/EEC and discharged by an installation undertaking activities covered under points 5.1, 5.3 or 5.5 as listed above. Reducing free cyanide to water. The BAT-AEL emission level is 0,02-0,1 mg/l .
valid
2019-04-23
2019-04-23
WT-COD-BAT20-III
Waste Treatment - COD - BAT20-III
5. Waste management; 6. Other activities: 5.1. Disposal or recovery of hazardous waste with a capacity exceeding 10 tonnes per day involving one or more of the following activities: (a)-(j) (see scope); 5.3. (a) Disposal of non-hazardous waste with a capacity exceeding 50 tonnes per day involving one or more of the following activities, and excluding activities covered by Council Directive 91/271/EEC (1): (i)-(v) (see scope). (b) Recovery, or a mix of recovery and disposal, of non-hazardous waste with a capacity exceeding 75 tonnes per day involving one or more of the following activities, and excluding activities covered by Directive 91/271/EEC: (i)-(iv) (see scope). 5.5. Temporary storage of hazardous waste not covered under point 5.4 of Annex I to Directive 2010/75/EU pending any of the activities listed in points 5.1, 5.2, 5.4 and 5.6 of Annex I to Directive 2010/75/EU with a total capacity exceeding 50 tonnes, excluding temporary storage, pending collection, on the site where the waste is generated. 6.11. Independently operated treatment of waste water not covered by Directive 91/271/EEC and discharged by an installation undertaking activities covered under points 5.1, 5.3 or 5.5 as listed above. Reducing chemical oxygen demand (COD) to water. The BAT-AEL emission level is 30-180 mg/l .
valid
2019-04-23
2019-04-23
WT-COD-BAT20-IV
Waste Treatment - COD - BAT20-IV
5. Waste management; 6. Other activities: 5.1. Disposal or recovery of hazardous waste with a capacity exceeding 10 tonnes per day involving one or more of the following activities: (a)-(j) (see scope); 5.3. (a) Disposal of non-hazardous waste with a capacity exceeding 50 tonnes per day involving one or more of the following activities, and excluding activities covered by Council Directive 91/271/EEC (1): (i)-(v) (see scope). (b) Recovery, or a mix of recovery and disposal, of non-hazardous waste with a capacity exceeding 75 tonnes per day involving one or more of the following activities, and excluding activities covered by Directive 91/271/EEC: (i)-(iv) (see scope). 5.5. Temporary storage of hazardous waste not covered under point 5.4 of Annex I to Directive 2010/75/EU pending any of the activities listed in points 5.1, 5.2, 5.4 and 5.6 of Annex I to Directive 2010/75/EU with a total capacity exceeding 50 tonnes, excluding temporary storage, pending collection, on the site where the waste is generated. 6.11. Independently operated treatment of waste water not covered by Directive 91/271/EEC and discharged by an installation undertaking activities covered under points 5.1, 5.3 or 5.5 as listed above. Reducing chemical oxygen demand (COD) to water. The BAT-AEL emission level is 30-300 mg/l .
valid
2019-04-23
2019-04-23
WT-Cd-BAT20-XLIV
Waste Treatment - Cd - BAT20-XLIV
5. Waste management; 6. Other activities: 5.1. Disposal or recovery of hazardous waste with a capacity exceeding 10 tonnes per day involving one or more of the following activities: (a)-(j) (see scope); 5.3. (a) Disposal of non-hazardous waste with a capacity exceeding 50 tonnes per day involving one or more of the following activities, and excluding activities covered by Council Directive 91/271/EEC (1): (i)-(v) (see scope). (b) Recovery, or a mix of recovery and disposal, of non-hazardous waste with a capacity exceeding 75 tonnes per day involving one or more of the following activities, and excluding activities covered by Directive 91/271/EEC: (i)-(iv) (see scope). 5.5. Temporary storage of hazardous waste not covered under point 5.4 of Annex I to Directive 2010/75/EU pending any of the activities listed in points 5.1, 5.2, 5.4 and 5.6 of Annex I to Directive 2010/75/EU with a total capacity exceeding 50 tonnes, excluding temporary storage, pending collection, on the site where the waste is generated. 6.11. Independently operated treatment of waste water not covered by Directive 91/271/EEC and discharged by an installation undertaking activities covered under points 5.1, 5.3 or 5.5 as listed above. Reducing cadmium to water. The BAT-AEL emission level is 0,01-0,1 mg/l.
valid
2019-04-23
2019-04-23
WT-Cd-BAT20-XVI
Waste Treatment - Cd - BAT20-XVI
5. Waste management; 6. Other activities: 5.1. Disposal or recovery of hazardous waste with a capacity exceeding 10 tonnes per day involving one or more of the following activities: (a)-(j) (see scope); 5.3. (a) Disposal of non-hazardous waste with a capacity exceeding 50 tonnes per day involving one or more of the following activities, and excluding activities covered by Council Directive 91/271/EEC (1): (i)-(v) (see scope). (b) Recovery, or a mix of recovery and disposal, of non-hazardous waste with a capacity exceeding 75 tonnes per day involving one or more of the following activities, and excluding activities covered by Directive 91/271/EEC: (i)-(iv) (see scope). 5.5. Temporary storage of hazardous waste not covered under point 5.4 of Annex I to Directive 2010/75/EU pending any of the activities listed in points 5.1, 5.2, 5.4 and 5.6 of Annex I to Directive 2010/75/EU with a total capacity exceeding 50 tonnes, excluding temporary storage, pending collection, on the site where the waste is generated. 6.11. Independently operated treatment of waste water not covered by Directive 91/271/EEC and discharged by an installation undertaking activities covered under points 5.1, 5.3 or 5.5 as listed above. Reducing cadmium to water. The BAT-AEL emission level is 0,01-0,05 mg/l .
valid
2019-04-23
2019-04-23
WT-Cd-BAT20-XXIV
Waste Treatment - Cd - BAT20-XXIV
5. Waste management; 6. Other activities: 5.1. Disposal or recovery of hazardous waste with a capacity exceeding 10 tonnes per day involving one or more of the following activities: (a)-(j) (see scope); 5.3. (a) Disposal of non-hazardous waste with a capacity exceeding 50 tonnes per day involving one or more of the following activities, and excluding activities covered by Council Directive 91/271/EEC (1): (i)-(v) (see scope). (b) Recovery, or a mix of recovery and disposal, of non-hazardous waste with a capacity exceeding 75 tonnes per day involving one or more of the following activities, and excluding activities covered by Directive 91/271/EEC: (i)-(iv) (see scope). 5.5. Temporary storage of hazardous waste not covered under point 5.4 of Annex I to Directive 2010/75/EU pending any of the activities listed in points 5.1, 5.2, 5.4 and 5.6 of Annex I to Directive 2010/75/EU with a total capacity exceeding 50 tonnes, excluding temporary storage, pending collection, on the site where the waste is generated. 6.11. Independently operated treatment of waste water not covered by Directive 91/271/EEC and discharged by an installation undertaking activities covered under points 5.1, 5.3 or 5.5 as listed above. Reducing cadmium to water. The BAT-AEL emission level is 0,01-0,1 mg/l.
valid
2019-04-23
2019-04-23
WT-Cd-BAT20-XXXVI
Waste Treatment - Cd - BAT20-XXXVI
5. Waste management; 6. Other activities: 5.1. Disposal or recovery of hazardous waste with a capacity exceeding 10 tonnes per day involving one or more of the following activities: (a)-(j) (see scope); 5.3. (a) Disposal of non-hazardous waste with a capacity exceeding 50 tonnes per day involving one or more of the following activities, and excluding activities covered by Council Directive 91/271/EEC (1): (i)-(v) (see scope). (b) Recovery, or a mix of recovery and disposal, of non-hazardous waste with a capacity exceeding 75 tonnes per day involving one or more of the following activities, and excluding activities covered by Directive 91/271/EEC: (i)-(iv) (see scope). 5.5. Temporary storage of hazardous waste not covered under point 5.4 of Annex I to Directive 2010/75/EU pending any of the activities listed in points 5.1, 5.2, 5.4 and 5.6 of Annex I to Directive 2010/75/EU with a total capacity exceeding 50 tonnes, excluding temporary storage, pending collection, on the site where the waste is generated. 6.11. Independently operated treatment of waste water not covered by Directive 91/271/EEC and discharged by an installation undertaking activities covered under points 5.1, 5.3 or 5.5 as listed above. Reducing cadmium to water. The BAT-AEL emission level is 0,01-0,05 mg/l.
valid
2019-04-23
2019-04-23
WT-Cr-BAT20-XLV
Waste Treatment - Cr - BAT20-XLV
5. Waste management; 6. Other activities: 5.1. Disposal or recovery of hazardous waste with a capacity exceeding 10 tonnes per day involving one or more of the following activities: (a)-(j) (see scope); 5.3. (a) Disposal of non-hazardous waste with a capacity exceeding 50 tonnes per day involving one or more of the following activities, and excluding activities covered by Council Directive 91/271/EEC (1): (i)-(v) (see scope). (b) Recovery, or a mix of recovery and disposal, of non-hazardous waste with a capacity exceeding 75 tonnes per day involving one or more of the following activities, and excluding activities covered by Directive 91/271/EEC: (i)-(iv) (see scope). 5.5. Temporary storage of hazardous waste not covered under point 5.4 of Annex I to Directive 2010/75/EU pending any of the activities listed in points 5.1, 5.2, 5.4 and 5.6 of Annex I to Directive 2010/75/EU with a total capacity exceeding 50 tonnes, excluding temporary storage, pending collection, on the site where the waste is generated. 6.11. Independently operated treatment of waste water not covered by Directive 91/271/EEC and discharged by an installation undertaking activities covered under points 5.1, 5.3 or 5.5 as listed above. Reducing chromium to water. The BAT-AEL emission level is 0,01-0,3 mg/l .
valid
2019-04-23
2019-04-23
WT-Cr-BAT20-XLVI
Waste Treatment - Cr - BAT20-XLVI
5. Waste management; 6. Other activities: 5.1. Disposal or recovery of hazardous waste with a capacity exceeding 10 tonnes per day involving one or more of the following activities: (a)-(j) (see scope); 5.3. (a) Disposal of non-hazardous waste with a capacity exceeding 50 tonnes per day involving one or more of the following activities, and excluding activities covered by Council Directive 91/271/EEC (1): (i)-(v) (see scope). (b) Recovery, or a mix of recovery and disposal, of non-hazardous waste with a capacity exceeding 75 tonnes per day involving one or more of the following activities, and excluding activities covered by Directive 91/271/EEC: (i)-(iv) (see scope). 5.5. Temporary storage of hazardous waste not covered under point 5.4 of Annex I to Directive 2010/75/EU pending any of the activities listed in points 5.1, 5.2, 5.4 and 5.6 of Annex I to Directive 2010/75/EU with a total capacity exceeding 50 tonnes, excluding temporary storage, pending collection, on the site where the waste is generated. 6.11. Independently operated treatment of waste water not covered by Directive 91/271/EEC and discharged by an installation undertaking activities covered under points 5.1, 5.3 or 5.5 as listed above. Reducing hexavalent chromium to water. The BAT-AEL emission level is 0,01-0,1 mg/l.
valid
2019-04-23
2019-04-23
WT-Cr-BAT20-XVII
Waste Treatment - Cr - BAT20-XVII
5. Waste management; 6. Other activities: 5.1. Disposal or recovery of hazardous waste with a capacity exceeding 10 tonnes per day involving one or more of the following activities: (a)-(j) (see scope); 5.3. (a) Disposal of non-hazardous waste with a capacity exceeding 50 tonnes per day involving one or more of the following activities, and excluding activities covered by Council Directive 91/271/EEC (1): (i)-(v) (see scope). (b) Recovery, or a mix of recovery and disposal, of non-hazardous waste with a capacity exceeding 75 tonnes per day involving one or more of the following activities, and excluding activities covered by Directive 91/271/EEC: (i)-(iv) (see scope). 5.5. Temporary storage of hazardous waste not covered under point 5.4 of Annex I to Directive 2010/75/EU pending any of the activities listed in points 5.1, 5.2, 5.4 and 5.6 of Annex I to Directive 2010/75/EU with a total capacity exceeding 50 tonnes, excluding temporary storage, pending collection, on the site where the waste is generated. 6.11. Independently operated treatment of waste water not covered by Directive 91/271/EEC and discharged by an installation undertaking activities covered under points 5.1, 5.3 or 5.5 as listed above. Reducing chromium to water. The BAT-AEL emission level is 0,01-0,15 mg/l .
valid
2019-04-23
2019-04-23
WT-Cr-BAT20-XXV
Waste Treatment - Cr - BAT20-XXV
5. Waste management; 6. Other activities: 5.1. Disposal or recovery of hazardous waste with a capacity exceeding 10 tonnes per day involving one or more of the following activities: (a)-(j) (see scope); 5.3. (a) Disposal of non-hazardous waste with a capacity exceeding 50 tonnes per day involving one or more of the following activities, and excluding activities covered by Council Directive 91/271/EEC (1): (i)-(v) (see scope). (b) Recovery, or a mix of recovery and disposal, of non-hazardous waste with a capacity exceeding 75 tonnes per day involving one or more of the following activities, and excluding activities covered by Directive 91/271/EEC: (i)-(iv) (see scope). 5.5. Temporary storage of hazardous waste not covered under point 5.4 of Annex I to Directive 2010/75/EU pending any of the activities listed in points 5.1, 5.2, 5.4 and 5.6 of Annex I to Directive 2010/75/EU with a total capacity exceeding 50 tonnes, excluding temporary storage, pending collection, on the site where the waste is generated. 6.11. Independently operated treatment of waste water not covered by Directive 91/271/EEC and discharged by an installation undertaking activities covered under points 5.1, 5.3 or 5.5 as listed above. Reducing chromium to water. The BAT-AEL emission level is 0,01-0,3 mg/l .
valid
2019-04-23
2019-04-23
WT-Cr-BAT20-XXVI
Waste Treatment - Cr - BAT20-XXVI
5. Waste management; 6. Other activities: 5.1. Disposal or recovery of hazardous waste with a capacity exceeding 10 tonnes per day involving one or more of the following activities: (a)-(j) (see scope); 5.3. (a) Disposal of non-hazardous waste with a capacity exceeding 50 tonnes per day involving one or more of the following activities, and excluding activities covered by Council Directive 91/271/EEC (1): (i)-(v) (see scope). (b) Recovery, or a mix of recovery and disposal, of non-hazardous waste with a capacity exceeding 75 tonnes per day involving one or more of the following activities, and excluding activities covered by Directive 91/271/EEC: (i)-(iv) (see scope). 5.5. Temporary storage of hazardous waste not covered under point 5.4 of Annex I to Directive 2010/75/EU pending any of the activities listed in points 5.1, 5.2, 5.4 and 5.6 of Annex I to Directive 2010/75/EU with a total capacity exceeding 50 tonnes, excluding temporary storage, pending collection, on the site where the waste is generated. 6.11. Independently operated treatment of waste water not covered by Directive 91/271/EEC and discharged by an installation undertaking activities covered under points 5.1, 5.3 or 5.5 as listed above. Reducing hexavalent chromium to water. The BAT-AEL emission level is 0,01-0,1 mg/l.
valid
2019-04-23
2019-04-23
WT-Cr-BAT20-XXXVII
Waste Treatment - Cr - BAT20-XXXVII
5. Waste management; 6. Other activities: 5.1. Disposal or recovery of hazardous waste with a capacity exceeding 10 tonnes per day involving one or more of the following activities: (a)-(j) (see scope); 5.3. (a) Disposal of non-hazardous waste with a capacity exceeding 50 tonnes per day involving one or more of the following activities, and excluding activities covered by Council Directive 91/271/EEC (1): (i)-(v) (see scope). (b) Recovery, or a mix of recovery and disposal, of non-hazardous waste with a capacity exceeding 75 tonnes per day involving one or more of the following activities, and excluding activities covered by Directive 91/271/EEC: (i)-(iv) (see scope). 5.5. Temporary storage of hazardous waste not covered under point 5.4 of Annex I to Directive 2010/75/EU pending any of the activities listed in points 5.1, 5.2, 5.4 and 5.6 of Annex I to Directive 2010/75/EU with a total capacity exceeding 50 tonnes, excluding temporary storage, pending collection, on the site where the waste is generated. 6.11. Independently operated treatment of waste water not covered by Directive 91/271/EEC and discharged by an installation undertaking activities covered under points 5.1, 5.3 or 5.5 as listed above. Reducing chromium to water. The BAT-AEL emission level is 0,01-0,15 mg/l.
valid
2019-04-23
2019-04-23
WT-Cu-BAT20-XLVII
Waste Treatment - Cu - BAT20-XLVII
5. Waste management; 6. Other activities: 5.1. Disposal or recovery of hazardous waste with a capacity exceeding 10 tonnes per day involving one or more of the following activities: (a)-(j) (see scope); 5.3. (a) Disposal of non-hazardous waste with a capacity exceeding 50 tonnes per day involving one or more of the following activities, and excluding activities covered by Council Directive 91/271/EEC (1): (i)-(v) (see scope). (b) Recovery, or a mix of recovery and disposal, of non-hazardous waste with a capacity exceeding 75 tonnes per day involving one or more of the following activities, and excluding activities covered by Directive 91/271/EEC: (i)-(iv) (see scope). 5.5. Temporary storage of hazardous waste not covered under point 5.4 of Annex I to Directive 2010/75/EU pending any of the activities listed in points 5.1, 5.2, 5.4 and 5.6 of Annex I to Directive 2010/75/EU with a total capacity exceeding 50 tonnes, excluding temporary storage, pending collection, on the site where the waste is generated. 6.11. Independently operated treatment of waste water not covered by Directive 91/271/EEC and discharged by an installation undertaking activities covered under points 5.1, 5.3 or 5.5 as listed above. Reducing copper to water. The BAT-AEL emission level is 0,05-0,5 mg/l .
valid
2019-04-23
2019-04-23
WT-Cu-BAT20-XVIII
Waste Treatment - Cu - BAT20-XVIII
5. Waste management; 6. Other activities: 5.1. Disposal or recovery of hazardous waste with a capacity exceeding 10 tonnes per day involving one or more of the following activities: (a)-(j) (see scope); 5.3. (a) Disposal of non-hazardous waste with a capacity exceeding 50 tonnes per day involving one or more of the following activities, and excluding activities covered by Council Directive 91/271/EEC (1): (i)-(v) (see scope). (b) Recovery, or a mix of recovery and disposal, of non-hazardous waste with a capacity exceeding 75 tonnes per day involving one or more of the following activities, and excluding activities covered by Directive 91/271/EEC: (i)-(iv) (see scope). 5.5. Temporary storage of hazardous waste not covered under point 5.4 of Annex I to Directive 2010/75/EU pending any of the activities listed in points 5.1, 5.2, 5.4 and 5.6 of Annex I to Directive 2010/75/EU with a total capacity exceeding 50 tonnes, excluding temporary storage, pending collection, on the site where the waste is generated. 6.11. Independently operated treatment of waste water not covered by Directive 91/271/EEC and discharged by an installation undertaking activities covered under points 5.1, 5.3 or 5.5 as listed above. Reducing copper to water. The BAT-AEL emission level is 0,05-0,5 mg/l .
valid
2019-04-23
2019-04-23
WT-Cu-BAT20-XXVII
Waste Treatment - Cu - BAT20-XXVII
5. Waste management; 6. Other activities: 5.1. Disposal or recovery of hazardous waste with a capacity exceeding 10 tonnes per day involving one or more of the following activities: (a)-(j) (see scope); 5.3. (a) Disposal of non-hazardous waste with a capacity exceeding 50 tonnes per day involving one or more of the following activities, and excluding activities covered by Council Directive 91/271/EEC (1): (i)-(v) (see scope). (b) Recovery, or a mix of recovery and disposal, of non-hazardous waste with a capacity exceeding 75 tonnes per day involving one or more of the following activities, and excluding activities covered by Directive 91/271/EEC: (i)-(iv) (see scope). 5.5. Temporary storage of hazardous waste not covered under point 5.4 of Annex I to Directive 2010/75/EU pending any of the activities listed in points 5.1, 5.2, 5.4 and 5.6 of Annex I to Directive 2010/75/EU with a total capacity exceeding 50 tonnes, excluding temporary storage, pending collection, on the site where the waste is generated. 6.11. Independently operated treatment of waste water not covered by Directive 91/271/EEC and discharged by an installation undertaking activities covered under points 5.1, 5.3 or 5.5 as listed above. Reducing copper to water. The BAT-AEL emission level is 0,05-0,5 mg/l .
valid
2019-04-23
2019-04-23
WT-Cu-BAT20-XXXVIII
Waste Treatment - Cu - BAT20-XXXVIII
5. Waste management; 6. Other activities: 5.1. Disposal or recovery of hazardous waste with a capacity exceeding 10 tonnes per day involving one or more of the following activities: (a)-(j) (see scope); 5.3. (a) Disposal of non-hazardous waste with a capacity exceeding 50 tonnes per day involving one or more of the following activities, and excluding activities covered by Council Directive 91/271/EEC (1): (i)-(v) (see scope). (b) Recovery, or a mix of recovery and disposal, of non-hazardous waste with a capacity exceeding 75 tonnes per day involving one or more of the following activities, and excluding activities covered by Directive 91/271/EEC: (i)-(iv) (see scope). 5.5. Temporary storage of hazardous waste not covered under point 5.4 of Annex I to Directive 2010/75/EU pending any of the activities listed in points 5.1, 5.2, 5.4 and 5.6 of Annex I to Directive 2010/75/EU with a total capacity exceeding 50 tonnes, excluding temporary storage, pending collection, on the site where the waste is generated. 6.11. Independently operated treatment of waste water not covered by Directive 91/271/EEC and discharged by an installation undertaking activities covered under points 5.1, 5.3 or 5.5 as listed above. Reducing copper to water. The BAT-AEL emission level is 0,05-0,5 mg/l.
valid
2019-04-23
2019-04-23
WT-Dust-BAT25
Waste Treatment - Dust - BAT25
5. Waste management; 6. Other activities: 5.1. Disposal or recovery of hazardous waste with a capacity exceeding 10 tonnes per day involving one or more of the following activities: (a)-(j) (see scope); 5.3. (a) Disposal of non-hazardous waste with a capacity exceeding 50 tonnes per day involving one or more of the following activities, and excluding activities covered by Council Directive 91/271/EEC (1): (i)-(v) (see scope). (b) Recovery, or a mix of recovery and disposal, of non-hazardous waste with a capacity exceeding 75 tonnes per day involving one or more of the following activities, and excluding activities covered by Directive 91/271/EEC: (i)-(iv) (see scope). 5.5. Temporary storage of hazardous waste not covered under point 5.4 of Annex I to Directive 2010/75/EU pending any of the activities listed in points 5.1, 5.2, 5.4 and 5.6 of Annex I to Directive 2010/75/EU with a total capacity exceeding 50 tonnes, excluding temporary storage, pending collection, on the site where the waste is generated. 6.11. Independently operated treatment of waste water not covered by Directive 91/271/EEC and discharged by an installation undertaking activities covered under points 5.1, 5.3 or 5.5 as listed above; Techniques (a)-(r) (see table incl. footnotes) for treatment of water-based liquid waste; Reducing dust emissions to air. The BAT-AEL emission level is 2-5 mg/Nm3 .
valid
2019-04-23
2019-04-23
WT-Dust-BAT34-III
Waste Treatment - Dust - BAT34-III
5. Waste management; 6. Other activities: 5.1. Disposal or recovery of hazardous waste with a capacity exceeding 10 tonnes per day involving one or more of the following activities: (a)-(j) (see scope); 5.3. (a) Disposal of non-hazardous waste with a capacity exceeding 50 tonnes per day involving one or more of the following activities, and excluding activities covered by Council Directive 91/271/EEC (1): (i)-(v) (see scope). (b) Recovery, or a mix of recovery and disposal, of non-hazardous waste with a capacity exceeding 75 tonnes per day involving one or more of the following activities, and excluding activities covered by Directive 91/271/EEC: (i)-(iv) (see scope). 5.5. Temporary storage of hazardous waste not covered under point 5.4 of Annex I to Directive 2010/75/EU pending any of the activities listed in points 5.1, 5.2, 5.4 and 5.6 of Annex I to Directive 2010/75/EU with a total capacity exceeding 50 tonnes, excluding temporary storage, pending collection, on the site where the waste is generated. 6.11. Independently operated treatment of waste water not covered by Directive 91/271/EEC and discharged by an installation undertaking activities covered under points 5.1, 5.3 or 5.5 as listed above; Techniques (a)-(e) (see table); Reducing dust emissions to air. The BAT-AEL emission level is 2-5 mg/Nm3 .
valid
2019-04-23
2019-04-23
WT-Dust-BAT41
Waste Treatment - Dust - BAT41
5. Waste management; 6. Other activities: 5.1. Disposal or recovery of hazardous waste with a capacity exceeding 10 tonnes per day involving one or more of the following activities: (a)-(j) (see scope); 5.3. (a) Disposal of non-hazardous waste with a capacity exceeding 50 tonnes per day involving one or more of the following activities, and excluding activities covered by Council Directive 91/271/EEC (1): (i)-(v) (see scope). (b) Recovery, or a mix of recovery and disposal, of non-hazardous waste with a capacity exceeding 75 tonnes per day involving one or more of the following activities, and excluding activities covered by Directive 91/271/EEC: (i)-(iv) (see scope). 5.5. Temporary storage of hazardous waste not covered under point 5.4 of Annex I to Directive 2010/75/EU pending any of the activities listed in points 5.1, 5.2, 5.4 and 5.6 of Annex I to Directive 2010/75/EU with a total capacity exceeding 50 tonnes, excluding temporary storage, pending collection, on the site where the waste is generated. 6.11. Independently operated treatment of waste water not covered by Directive 91/271/EEC and discharged by an installation undertaking activities covered under points 5.1, 5.3 or 5.5 as listed above; Reducing dust emissions to air. The BAT-AEL emission level is 2-5 mg/Nm3 .
valid
2019-04-23
2019-04-23
WT-HCl-BAT53-I
Waste Treatment - HCl - BAT53-I
5. Waste management; 6. Other activities: 5.1. Disposal or recovery of hazardous waste with a capacity exceeding 10 tonnes per day involving one or more of the following activities: (a)-(j) (see scope); 5.3. (a) Disposal of non-hazardous waste with a capacity exceeding 50 tonnes per day involving one or more of the following activities, and excluding activities covered by Council Directive 91/271/EEC (1): (i)-(v) (see scope). (b) Recovery, or a mix of recovery and disposal, of non-hazardous waste with a capacity exceeding 75 tonnes per day involving one or more of the following activities, and excluding activities covered by Directive 91/271/EEC: (i)-(iv) (see scope). 5.5. Temporary storage of hazardous waste not covered under point 5.4 of Annex I to Directive 2010/75/EU pending any of the activities listed in points 5.1, 5.2, 5.4 and 5.6 of Annex I to Directive 2010/75/EU with a total capacity exceeding 50 tonnes, excluding temporary storage, pending collection, on the site where the waste is generated. 6.11. Independently operated treatment of waste water not covered by Directive 91/271/EEC and discharged by an installation undertaking activities covered under points 5.1, 5.3 or 5.5 as listed above; Reducing hydrogen chloride emissions to air. The BAT-AEL emission level is 1-5 mg/Nm3 .
valid
2019-04-23
2019-04-23
WT-HOI-BAT20-VI
Waste Treatment - HOI - BAT20-VI
5. Waste management; 6. Other activities: 5.1. Disposal or recovery of hazardous waste with a capacity exceeding 10 tonnes per day involving one or more of the following activities: (a)-(j) (see scope); 5.3. (a) Disposal of non-hazardous waste with a capacity exceeding 50 tonnes per day involving one or more of the following activities, and excluding activities covered by Council Directive 91/271/EEC (1): (i)-(v) (see scope). (b) Recovery, or a mix of recovery and disposal, of non-hazardous waste with a capacity exceeding 75 tonnes per day involving one or more of the following activities, and excluding activities covered by Directive 91/271/EEC: (i)-(iv) (see scope). 5.5. Temporary storage of hazardous waste not covered under point 5.4 of Annex I to Directive 2010/75/EU pending any of the activities listed in points 5.1, 5.2, 5.4 and 5.6 of Annex I to Directive 2010/75/EU with a total capacity exceeding 50 tonnes, excluding temporary storage, pending collection, on the site where the waste is generated. 6.11. Independently operated treatment of waste water not covered by Directive 91/271/EEC and discharged by an installation undertaking activities covered under points 5.1, 5.3 or 5.5 as listed above. Reducing hydrocarbon oil index to water. The BAT-AEL emission level is 0,5-10 mg/l .
valid
2019-04-23
2019-04-23
WT-HOI-BAT20-XXXII
Waste Treatment - HOI - BAT20-XXXII
5. Waste management; 6. Other activities: 5.1. Disposal or recovery of hazardous waste with a capacity exceeding 10 tonnes per day involving one or more of the following activities: (a)-(j) (see scope); 5.3. (a) Disposal of non-hazardous waste with a capacity exceeding 50 tonnes per day involving one or more of the following activities, and excluding activities covered by Council Directive 91/271/EEC (1): (i)-(v) (see scope). (b) Recovery, or a mix of recovery and disposal, of non-hazardous waste with a capacity exceeding 75 tonnes per day involving one or more of the following activities, and excluding activities covered by Directive 91/271/EEC: (i)-(iv) (see scope). 5.5. Temporary storage of hazardous waste not covered under point 5.4 of Annex I to Directive 2010/75/EU pending any of the activities listed in points 5.1, 5.2, 5.4 and 5.6 of Annex I to Directive 2010/75/EU with a total capacity exceeding 50 tonnes, excluding temporary storage, pending collection, on the site where the waste is generated. 6.11. Independently operated treatment of waste water not covered by Directive 91/271/EEC and discharged by an installation undertaking activities covered under points 5.1, 5.3 or 5.5 as listed above. Reducing hydrocarbon oil index to water. The BAT-AEL emission level is 0,5-10 mg/l .
valid
2019-04-23
2019-04-23
WT-Hg-BAT20-L
Waste Treatment - Hg - BAT20-L
5. Waste management; 6. Other activities: 5.1. Disposal or recovery of hazardous waste with a capacity exceeding 10 tonnes per day involving one or more of the following activities: (a)-(j) (see scope); 5.3. (a) Disposal of non-hazardous waste with a capacity exceeding 50 tonnes per day involving one or more of the following activities, and excluding activities covered by Council Directive 91/271/EEC (1): (i)-(v) (see scope). (b) Recovery, or a mix of recovery and disposal, of non-hazardous waste with a capacity exceeding 75 tonnes per day involving one or more of the following activities, and excluding activities covered by Directive 91/271/EEC: (i)-(iv) (see scope). 5.5. Temporary storage of hazardous waste not covered under point 5.4 of Annex I to Directive 2010/75/EU pending any of the activities listed in points 5.1, 5.2, 5.4 and 5.6 of Annex I to Directive 2010/75/EU with a total capacity exceeding 50 tonnes, excluding temporary storage, pending collection, on the site where the waste is generated. 6.11. Independently operated treatment of waste water not covered by Directive 91/271/EEC and discharged by an installation undertaking activities covered under points 5.1, 5.3 or 5.5 as listed above. Reducing mercury to water. The BAT-AEL emission level is 1-10 µg/l .
valid
2019-04-23
2019-04-23
WT-Hg-BAT20-XLI
Waste Treatment - Hg - BAT20-XLI
5. Waste management; 6. Other activities: 5.1. Disposal or recovery of hazardous waste with a capacity exceeding 10 tonnes per day involving one or more of the following activities: (a)-(j) (see scope); 5.3. (a) Disposal of non-hazardous waste with a capacity exceeding 50 tonnes per day involving one or more of the following activities, and excluding activities covered by Council Directive 91/271/EEC (1): (i)-(v) (see scope). (b) Recovery, or a mix of recovery and disposal, of non-hazardous waste with a capacity exceeding 75 tonnes per day involving one or more of the following activities, and excluding activities covered by Directive 91/271/EEC: (i)-(iv) (see scope). 5.5. Temporary storage of hazardous waste not covered under point 5.4 of Annex I to Directive 2010/75/EU pending any of the activities listed in points 5.1, 5.2, 5.4 and 5.6 of Annex I to Directive 2010/75/EU with a total capacity exceeding 50 tonnes, excluding temporary storage, pending collection, on the site where the waste is generated. 6.11. Independently operated treatment of waste water not covered by Directive 91/271/EEC and discharged by an installation undertaking activities covered under points 5.1, 5.3 or 5.5 as listed above. Reducing mercury to water. The BAT-AEL emission level is 0,5-5 µg/l .
valid
2019-04-23
2019-04-23
WT-Hg-BAT20-XXI
Waste Treatment - Hg - BAT20-XXI
5. Waste management; 6. Other activities: 5.1. Disposal or recovery of hazardous waste with a capacity exceeding 10 tonnes per day involving one or more of the following activities: (a)-(j) (see scope); 5.3. (a) Disposal of non-hazardous waste with a capacity exceeding 50 tonnes per day involving one or more of the following activities, and excluding activities covered by Council Directive 91/271/EEC (1): (i)-(v) (see scope). (b) Recovery, or a mix of recovery and disposal, of non-hazardous waste with a capacity exceeding 75 tonnes per day involving one or more of the following activities, and excluding activities covered by Directive 91/271/EEC: (i)-(iv) (see scope). 5.5. Temporary storage of hazardous waste not covered under point 5.4 of Annex I to Directive 2010/75/EU pending any of the activities listed in points 5.1, 5.2, 5.4 and 5.6 of Annex I to Directive 2010/75/EU with a total capacity exceeding 50 tonnes, excluding temporary storage, pending collection, on the site where the waste is generated. 6.11. Independently operated treatment of waste water not covered by Directive 91/271/EEC and discharged by an installation undertaking activities covered under points 5.1, 5.3 or 5.5 as listed above. Reducing mercury to water. The BAT-AEL emission level is 0,5-5 µg/l .
valid
2019-04-23
2019-04-23
WT-Hg-BAT20-XXX
Waste Treatment - Hg - BAT20-XXX
5. Waste management; 6. Other activities: 5.1. Disposal or recovery of hazardous waste with a capacity exceeding 10 tonnes per day involving one or more of the following activities: (a)-(j) (see scope); 5.3. (a) Disposal of non-hazardous waste with a capacity exceeding 50 tonnes per day involving one or more of the following activities, and excluding activities covered by Council Directive 91/271/EEC (1): (i)-(v) (see scope). (b) Recovery, or a mix of recovery and disposal, of non-hazardous waste with a capacity exceeding 75 tonnes per day involving one or more of the following activities, and excluding activities covered by Directive 91/271/EEC: (i)-(iv) (see scope). 5.5. Temporary storage of hazardous waste not covered under point 5.4 of Annex I to Directive 2010/75/EU pending any of the activities listed in points 5.1, 5.2, 5.4 and 5.6 of Annex I to Directive 2010/75/EU with a total capacity exceeding 50 tonnes, excluding temporary storage, pending collection, on the site where the waste is generated. 6.11. Independently operated treatment of waste water not covered by Directive 91/271/EEC and discharged by an installation undertaking activities covered under points 5.1, 5.3 or 5.5 as listed above. Reducing mercury to water. The BAT-AEL emission level is 1-10 µg/l .
valid
2019-04-23
2019-04-23
WT-Hg-BAT32
Waste Treatment - Hg - BAT32
5. Waste management; 6. Other activities: 5.1. Disposal or recovery of hazardous waste with a capacity exceeding 10 tonnes per day involving one or more of the following activities: (a)-(j) (see scope); 5.3. (a) Disposal of non-hazardous waste with a capacity exceeding 50 tonnes per day involving one or more of the following activities, and excluding activities covered by Council Directive 91/271/EEC (1): (i)-(v) (see scope). (b) Recovery, or a mix of recovery and disposal, of non-hazardous waste with a capacity exceeding 75 tonnes per day involving one or more of the following activities, and excluding activities covered by Directive 91/271/EEC: (i)-(iv) (see scope). 5.5. Temporary storage of hazardous waste not covered under point 5.4 of Annex I to Directive 2010/75/EU pending any of the activities listed in points 5.1, 5.2, 5.4 and 5.6 of Annex I to Directive 2010/75/EU with a total capacity exceeding 50 tonnes, excluding temporary storage, pending collection, on the site where the waste is generated. 6.11. Independently operated treatment of waste water not covered by Directive 91/271/EEC and discharged by an installation undertaking activities covered under points 5.1, 5.3 or 5.5 as listed above; Techniques (a)-(d) (see table); Reducing mercury emissions to air. The BAT-AEL emission level is 2-7 µg/Nm3 .
valid
2019-04-23
2019-04-23
WT-NH3-BAT34-I
Waste Treatment - NH3 - BAT34-I
5. Waste management; 6. Other activities: 5.1. Disposal or recovery of hazardous waste with a capacity exceeding 10 tonnes per day involving one or more of the following activities: (a)-(j) (see scope); 5.3. (a) Disposal of non-hazardous waste with a capacity exceeding 50 tonnes per day involving one or more of the following activities, and excluding activities covered by Council Directive 91/271/EEC (1): (i)-(v) (see scope). (b) Recovery, or a mix of recovery and disposal, of non-hazardous waste with a capacity exceeding 75 tonnes per day involving one or more of the following activities, and excluding activities covered by Directive 91/271/EEC: (i)-(iv) (see scope). 5.5. Temporary storage of hazardous waste not covered under point 5.4 of Annex I to Directive 2010/75/EU pending any of the activities listed in points 5.1, 5.2, 5.4 and 5.6 of Annex I to Directive 2010/75/EU with a total capacity exceeding 50 tonnes, excluding temporary storage, pending collection, on the site where the waste is generated. 6.11. Independently operated treatment of waste water not covered by Directive 91/271/EEC and discharged by an installation undertaking activities covered under points 5.1, 5.3 or 5.5 as listed above; Collect mercury emissions at source, send them to abatement and carry out adequate monitoring (see description); Reducing ammonia (NH3) emissions to air. The BAT-AEL emission level is 0,3-20 mg/Nm3 .
valid
2019-04-23
2019-04-23
WT-Ni-BAT20-XL
Waste Treatment - Ni - BAT20-XL
5. Waste management; 6. Other activities: 5.1. Disposal or recovery of hazardous waste with a capacity exceeding 10 tonnes per day involving one or more of the following activities: (a)-(j) (see scope); 5.3. (a) Disposal of non-hazardous waste with a capacity exceeding 50 tonnes per day involving one or more of the following activities, and excluding activities covered by Council Directive 91/271/EEC (1): (i)-(v) (see scope). (b) Recovery, or a mix of recovery and disposal, of non-hazardous waste with a capacity exceeding 75 tonnes per day involving one or more of the following activities, and excluding activities covered by Directive 91/271/EEC: (i)-(iv) (see scope). 5.5. Temporary storage of hazardous waste not covered under point 5.4 of Annex I to Directive 2010/75/EU pending any of the activities listed in points 5.1, 5.2, 5.4 and 5.6 of Annex I to Directive 2010/75/EU with a total capacity exceeding 50 tonnes, excluding temporary storage, pending collection, on the site where the waste is generated. 6.11. Independently operated treatment of waste water not covered by Directive 91/271/EEC and discharged by an installation undertaking activities covered under points 5.1, 5.3 or 5.5 as listed above. Reducing nickel to water. The BAT-AEL emission level is 0,05-0,5 mg/l .
valid
2019-04-23
2019-04-23
WT-Ni-BAT20-XLIX
Waste Treatment - Ni - BAT20-XLIX
5. Waste management; 6. Other activities: 5.1. Disposal or recovery of hazardous waste with a capacity exceeding 10 tonnes per day involving one or more of the following activities: (a)-(j) (see scope); 5.3. (a) Disposal of non-hazardous waste with a capacity exceeding 50 tonnes per day involving one or more of the following activities, and excluding activities covered by Council Directive 91/271/EEC (1): (i)-(v) (see scope). (b) Recovery, or a mix of recovery and disposal, of non-hazardous waste with a capacity exceeding 75 tonnes per day involving one or more of the following activities, and excluding activities covered by Directive 91/271/EEC: (i)-(iv) (see scope). 5.5. Temporary storage of hazardous waste not covered under point 5.4 of Annex I to Directive 2010/75/EU pending any of the activities listed in points 5.1, 5.2, 5.4 and 5.6 of Annex I to Directive 2010/75/EU with a total capacity exceeding 50 tonnes, excluding temporary storage, pending collection, on the site where the waste is generated. 6.11. Independently operated treatment of waste water not covered by Directive 91/271/EEC and discharged by an installation undertaking activities covered under points 5.1, 5.3 or 5.5 as listed above. Reducing nickel to water. The BAT-AEL emission level is 0,05-1 mg/l .
valid
2019-04-23
2019-04-23
WT-Ni-BAT20-XX
Waste Treatment - Ni - BAT20-XX
5. Waste management; 6. Other activities: 5.1. Disposal or recovery of hazardous waste with a capacity exceeding 10 tonnes per day involving one or more of the following activities: (a)-(j) (see scope); 5.3. (a) Disposal of non-hazardous waste with a capacity exceeding 50 tonnes per day involving one or more of the following activities, and excluding activities covered by Council Directive 91/271/EEC (1): (i)-(v) (see scope). (b) Recovery, or a mix of recovery and disposal, of non-hazardous waste with a capacity exceeding 75 tonnes per day involving one or more of the following activities, and excluding activities covered by Directive 91/271/EEC: (i)-(iv) (see scope). 5.5. Temporary storage of hazardous waste not covered under point 5.4 of Annex I to Directive 2010/75/EU pending any of the activities listed in points 5.1, 5.2, 5.4 and 5.6 of Annex I to Directive 2010/75/EU with a total capacity exceeding 50 tonnes, excluding temporary storage, pending collection, on the site where the waste is generated. 6.11. Independently operated treatment of waste water not covered by Directive 91/271/EEC and discharged by an installation undertaking activities covered under points 5.1, 5.3 or 5.5 as listed above. Reducing nickel to water. The BAT-AEL emission level is 0,05-0,5 mg/l .
valid
2019-04-23
2019-04-23
WT-Ni-BAT20-XXIX
Waste Treatment - Ni - BAT20-XXIX
5. Waste management; 6. Other activities: 5.1. Disposal or recovery of hazardous waste with a capacity exceeding 10 tonnes per day involving one or more of the following activities: (a)-(j) (see scope); 5.3. (a) Disposal of non-hazardous waste with a capacity exceeding 50 tonnes per day involving one or more of the following activities, and excluding activities covered by Council Directive 91/271/EEC (1): (i)-(v) (see scope). (b) Recovery, or a mix of recovery and disposal, of non-hazardous waste with a capacity exceeding 75 tonnes per day involving one or more of the following activities, and excluding activities covered by Directive 91/271/EEC: (i)-(iv) (see scope). 5.5. Temporary storage of hazardous waste not covered under point 5.4 of Annex I to Directive 2010/75/EU pending any of the activities listed in points 5.1, 5.2, 5.4 and 5.6 of Annex I to Directive 2010/75/EU with a total capacity exceeding 50 tonnes, excluding temporary storage, pending collection, on the site where the waste is generated. 6.11. Independently operated treatment of waste water not covered by Directive 91/271/EEC and discharged by an installation undertaking activities covered under points 5.1, 5.3 or 5.5 as listed above. Reducing nickel to water. The BAT-AEL emission level is 0,05-1 mg/l .
valid
2019-04-23
2019-04-23
WT-Odour-BAT34-II
Waste Treatment - Odour - BAT34-II
5. Waste management; 6. Other activities: 5.1. Disposal or recovery of hazardous waste with a capacity exceeding 10 tonnes per day involving one or more of the following activities: (a)-(j) (see scope); 5.3. (a) Disposal of non-hazardous waste with a capacity exceeding 50 tonnes per day involving one or more of the following activities, and excluding activities covered by Council Directive 91/271/EEC (1): (i)-(v) (see scope). (b) Recovery, or a mix of recovery and disposal, of non-hazardous waste with a capacity exceeding 75 tonnes per day involving one or more of the following activities, and excluding activities covered by Directive 91/271/EEC: (i)-(iv) (see scope). 5.5. Temporary storage of hazardous waste not covered under point 5.4 of Annex I to Directive 2010/75/EU pending any of the activities listed in points 5.1, 5.2, 5.4 and 5.6 of Annex I to Directive 2010/75/EU with a total capacity exceeding 50 tonnes, excluding temporary storage, pending collection, on the site where the waste is generated. 6.11. Independently operated treatment of waste water not covered by Directive 91/271/EEC and discharged by an installation undertaking activities covered under points 5.1, 5.3 or 5.5 as listed above; Techniques (a)-(e) (see table); Reducing odour concentration emissions to air. The BAT-AEL emission level is 200-1 000 ouE/Nm3 .
valid
2019-04-23
2019-04-23
WT-Pb-BAT20-XIX
Waste Treatment - Pb - BAT20-XIX
5. Waste management; 6. Other activities: 5.1. Disposal or recovery of hazardous waste with a capacity exceeding 10 tonnes per day involving one or more of the following activities: (a)-(j) (see scope); 5.3. (a) Disposal of non-hazardous waste with a capacity exceeding 50 tonnes per day involving one or more of the following activities, and excluding activities covered by Council Directive 91/271/EEC (1): (i)-(v) (see scope). (b) Recovery, or a mix of recovery and disposal, of non-hazardous waste with a capacity exceeding 75 tonnes per day involving one or more of the following activities, and excluding activities covered by Directive 91/271/EEC: (i)-(iv) (see scope). 5.5. Temporary storage of hazardous waste not covered under point 5.4 of Annex I to Directive 2010/75/EU pending any of the activities listed in points 5.1, 5.2, 5.4 and 5.6 of Annex I to Directive 2010/75/EU with a total capacity exceeding 50 tonnes, excluding temporary storage, pending collection, on the site where the waste is generated. 6.11. Independently operated treatment of waste water not covered by Directive 91/271/EEC and discharged by an installation undertaking activities covered under points 5.1, 5.3 or 5.5 as listed above. Reducing lead to water. The BAT-AEL emission level is 0,05-0,1 mg/l .
valid
2019-04-23
2019-04-23
WT-Pb-BAT20-XLVIII
Waste Treatment - Pb - BAT20-XLVIII
5. Waste management; 6. Other activities: 5.1. Disposal or recovery of hazardous waste with a capacity exceeding 10 tonnes per day involving one or more of the following activities: (a)-(j) (see scope); 5.3. (a) Disposal of non-hazardous waste with a capacity exceeding 50 tonnes per day involving one or more of the following activities, and excluding activities covered by Council Directive 91/271/EEC (1): (i)-(v) (see scope). (b) Recovery, or a mix of recovery and disposal, of non-hazardous waste with a capacity exceeding 75 tonnes per day involving one or more of the following activities, and excluding activities covered by Directive 91/271/EEC: (i)-(iv) (see scope). 5.5. Temporary storage of hazardous waste not covered under point 5.4 of Annex I to Directive 2010/75/EU pending any of the activities listed in points 5.1, 5.2, 5.4 and 5.6 of Annex I to Directive 2010/75/EU with a total capacity exceeding 50 tonnes, excluding temporary storage, pending collection, on the site where the waste is generated. 6.11. Independently operated treatment of waste water not covered by Directive 91/271/EEC and discharged by an installation undertaking activities covered under points 5.1, 5.3 or 5.5 as listed above. Reducing lead to water. The BAT-AEL emission level is 0,05-0,3 mg/l .
valid
2019-04-23
2019-04-23
WT-Pb-BAT20-XXVIII
Waste Treatment - Pb - BAT20-XXVIII
5. Waste management; 6. Other activities: 5.1. Disposal or recovery of hazardous waste with a capacity exceeding 10 tonnes per day involving one or more of the following activities: (a)-(j) (see scope); 5.3. (a) Disposal of non-hazardous waste with a capacity exceeding 50 tonnes per day involving one or more of the following activities, and excluding activities covered by Council Directive 91/271/EEC (1): (i)-(v) (see scope). (b) Recovery, or a mix of recovery and disposal, of non-hazardous waste with a capacity exceeding 75 tonnes per day involving one or more of the following activities, and excluding activities covered by Directive 91/271/EEC: (i)-(iv) (see scope). 5.5. Temporary storage of hazardous waste not covered under point 5.4 of Annex I to Directive 2010/75/EU pending any of the activities listed in points 5.1, 5.2, 5.4 and 5.6 of Annex I to Directive 2010/75/EU with a total capacity exceeding 50 tonnes, excluding temporary storage, pending collection, on the site where the waste is generated. 6.11. Independently operated treatment of waste water not covered by Directive 91/271/EEC and discharged by an installation undertaking activities covered under points 5.1, 5.3 or 5.5 as listed above. Reducing lead to water. The BAT-AEL emission level is 0,05-0,3 mg/l .
valid
2019-04-23
2019-04-23
WT-Pb-BAT20-XXXIX
Waste Treatment - Pb - BAT20-XXXIX
5. Waste management; 6. Other activities: 5.1. Disposal or recovery of hazardous waste with a capacity exceeding 10 tonnes per day involving one or more of the following activities: (a)-(j) (see scope); 5.3. (a) Disposal of non-hazardous waste with a capacity exceeding 50 tonnes per day involving one or more of the following activities, and excluding activities covered by Council Directive 91/271/EEC (1): (i)-(v) (see scope). (b) Recovery, or a mix of recovery and disposal, of non-hazardous waste with a capacity exceeding 75 tonnes per day involving one or more of the following activities, and excluding activities covered by Directive 91/271/EEC: (i)-(iv) (see scope). 5.5. Temporary storage of hazardous waste not covered under point 5.4 of Annex I to Directive 2010/75/EU pending any of the activities listed in points 5.1, 5.2, 5.4 and 5.6 of Annex I to Directive 2010/75/EU with a total capacity exceeding 50 tonnes, excluding temporary storage, pending collection, on the site where the waste is generated. 6.11. Independently operated treatment of waste water not covered by Directive 91/271/EEC and discharged by an installation undertaking activities covered under points 5.1, 5.3 or 5.5 as listed above. Reducing lead to water. The BAT-AEL emission level is 0,05-0,1 mg/l .
valid
2019-04-23
2019-04-23
WT-Phenols-BAT20-XI
Waste Treatment - Phenols - BAT20-XI
5. Waste management; 6. Other activities: 5.1. Disposal or recovery of hazardous waste with a capacity exceeding 10 tonnes per day involving one or more of the following activities: (a)-(j) (see scope); 5.3. (a) Disposal of non-hazardous waste with a capacity exceeding 50 tonnes per day involving one or more of the following activities, and excluding activities covered by Council Directive 91/271/EEC (1): (i)-(v) (see scope). (b) Recovery, or a mix of recovery and disposal, of non-hazardous waste with a capacity exceeding 75 tonnes per day involving one or more of the following activities, and excluding activities covered by Directive 91/271/EEC: (i)-(iv) (see scope). 5.5. Temporary storage of hazardous waste not covered under point 5.4 of Annex I to Directive 2010/75/EU pending any of the activities listed in points 5.1, 5.2, 5.4 and 5.6 of Annex I to Directive 2010/75/EU with a total capacity exceeding 50 tonnes, excluding temporary storage, pending collection, on the site where the waste is generated. 6.11. Independently operated treatment of waste water not covered by Directive 91/271/EEC and discharged by an installation undertaking activities covered under points 5.1, 5.3 or 5.5 as listed above. Reducing phenol index to water. The BAT-AEL emission level is 0,05-0,2 mg/l .
valid
2019-04-23
2019-04-23
WT-Phenols-BAT20-XII
Waste Treatment - Phenols - BAT20-XII
5. Waste management; 6. Other activities: 5.1. Disposal or recovery of hazardous waste with a capacity exceeding 10 tonnes per day involving one or more of the following activities: (a)-(j) (see scope); 5.3. (a) Disposal of non-hazardous waste with a capacity exceeding 50 tonnes per day involving one or more of the following activities, and excluding activities covered by Council Directive 91/271/EEC (1): (i)-(v) (see scope). (b) Recovery, or a mix of recovery and disposal, of non-hazardous waste with a capacity exceeding 75 tonnes per day involving one or more of the following activities, and excluding activities covered by Directive 91/271/EEC: (i)-(iv) (see scope). 5.5. Temporary storage of hazardous waste not covered under point 5.4 of Annex I to Directive 2010/75/EU pending any of the activities listed in points 5.1, 5.2, 5.4 and 5.6 of Annex I to Directive 2010/75/EU with a total capacity exceeding 50 tonnes, excluding temporary storage, pending collection, on the site where the waste is generated. 6.11. Independently operated treatment of waste water not covered by Directive 91/271/EEC and discharged by an installation undertaking activities covered under points 5.1, 5.3 or 5.5 as listed above. Reducing phenol index to water. The BAT-AEL emission level is 0,05-0,3 mg/l .
valid
2019-04-23
2019-04-23
WT-TN-BAT20-VII
Waste Treatment - TN - BAT20-VII
5. Waste management; 6. Other activities: 5.1. Disposal or recovery of hazardous waste with a capacity exceeding 10 tonnes per day involving one or more of the following activities: (a)-(j) (see scope); 5.3. (a) Disposal of non-hazardous waste with a capacity exceeding 50 tonnes per day involving one or more of the following activities, and excluding activities covered by Council Directive 91/271/EEC (1): (i)-(v) (see scope). (b) Recovery, or a mix of recovery and disposal, of non-hazardous waste with a capacity exceeding 75 tonnes per day involving one or more of the following activities, and excluding activities covered by Directive 91/271/EEC: (i)-(iv) (see scope). 5.5. Temporary storage of hazardous waste not covered under point 5.4 of Annex I to Directive 2010/75/EU pending any of the activities listed in points 5.1, 5.2, 5.4 and 5.6 of Annex I to Directive 2010/75/EU with a total capacity exceeding 50 tonnes, excluding temporary storage, pending collection, on the site where the waste is generated. 6.11. Independently operated treatment of waste water not covered by Directive 91/271/EEC and discharged by an installation undertaking activities covered under points 5.1, 5.3 or 5.5 as listed above. Reducing total nitrogen to water. The BAT-AEL emission level is 1-25 mg/l .
valid
2019-04-23
2019-04-23
WT-TN-BAT20-VIII
Waste Treatment - TN - BAT20-VIII
5. Waste management; 6. Other activities: 5.1. Disposal or recovery of hazardous waste with a capacity exceeding 10 tonnes per day involving one or more of the following activities: (a)-(j) (see scope); 5.3. (a) Disposal of non-hazardous waste with a capacity exceeding 50 tonnes per day involving one or more of the following activities, and excluding activities covered by Council Directive 91/271/EEC (1): (i)-(v) (see scope). (b) Recovery, or a mix of recovery and disposal, of non-hazardous waste with a capacity exceeding 75 tonnes per day involving one or more of the following activities, and excluding activities covered by Directive 91/271/EEC: (i)-(iv) (see scope). 5.5. Temporary storage of hazardous waste not covered under point 5.4 of Annex I to Directive 2010/75/EU pending any of the activities listed in points 5.1, 5.2, 5.4 and 5.6 of Annex I to Directive 2010/75/EU with a total capacity exceeding 50 tonnes, excluding temporary storage, pending collection, on the site where the waste is generated. 6.11. Independently operated treatment of waste water not covered by Directive 91/271/EEC and discharged by an installation undertaking activities covered under points 5.1, 5.3 or 5.5 as listed above. Reducing total nitrogen to water. The BAT-AEL emission level is 10-60 mg/l .
valid
2019-04-23
2019-04-23
WT-TOC-BAT20-I
Waste Treatment - TOC - BAT20-I
5. Waste management; 6. Other activities: 5.1. Disposal or recovery of hazardous waste with a capacity exceeding 10 tonnes per day involving one or more of the following activities: (a)-(j) (see scope); 5.3. (a) Disposal of non-hazardous waste with a capacity exceeding 50 tonnes per day involving one or more of the following activities, and excluding activities covered by Council Directive 91/271/EEC (1): (i)-(v) (see scope). (b) Recovery, or a mix of recovery and disposal, of non-hazardous waste with a capacity exceeding 75 tonnes per day involving one or more of the following activities, and excluding activities covered by Directive 91/271/EEC: (i)-(iv) (see scope). 5.5. Temporary storage of hazardous waste not covered under point 5.4 of Annex I to Directive 2010/75/EU pending any of the activities listed in points 5.1, 5.2, 5.4 and 5.6 of Annex I to Directive 2010/75/EU with a total capacity exceeding 50 tonnes, excluding temporary storage, pending collection, on the site where the waste is generated. 6.11. Independently operated treatment of waste water not covered by Directive 91/271/EEC and discharged by an installation undertaking activities covered under points 5.1, 5.3 or 5.5 as listed above. Reducing total organic carbon to water. The BAT-AEL emission level is 10-60 mg/l .
valid
2019-04-23
2019-04-23
WT-TOC-BAT20-II
Waste Treatment - TOC - BAT20-II
5. Waste management; 6. Other activities: 5.1. Disposal or recovery of hazardous waste with a capacity exceeding 10 tonnes per day involving one or more of the following activities: (a)-(j) (see scope); 5.3. (a) Disposal of non-hazardous waste with a capacity exceeding 50 tonnes per day involving one or more of the following activities, and excluding activities covered by Council Directive 91/271/EEC (1): (i)-(v) (see scope). (b) Recovery, or a mix of recovery and disposal, of non-hazardous waste with a capacity exceeding 75 tonnes per day involving one or more of the following activities, and excluding activities covered by Directive 91/271/EEC: (i)-(iv) (see scope). 5.5. Temporary storage of hazardous waste not covered under point 5.4 of Annex I to Directive 2010/75/EU pending any of the activities listed in points 5.1, 5.2, 5.4 and 5.6 of Annex I to Directive 2010/75/EU with a total capacity exceeding 50 tonnes, excluding temporary storage, pending collection, on the site where the waste is generated. 6.11. Independently operated treatment of waste water not covered by Directive 91/271/EEC and discharged by an installation undertaking activities covered under points 5.1, 5.3 or 5.5 as listed above. Reducing total organic carbon to water. The BAT-AEL emission level is 10-100 mg/l .
valid
2019-04-23
2019-04-23
WT-TP-BAT20-IX
Waste Treatment - TP - BAT20-IX
5. Waste management; 6. Other activities: 5.1. Disposal or recovery of hazardous waste with a capacity exceeding 10 tonnes per day involving one or more of the following activities: (a)-(j) (see scope); 5.3. (a) Disposal of non-hazardous waste with a capacity exceeding 50 tonnes per day involving one or more of the following activities, and excluding activities covered by Council Directive 91/271/EEC (1): (i)-(v) (see scope). (b) Recovery, or a mix of recovery and disposal, of non-hazardous waste with a capacity exceeding 75 tonnes per day involving one or more of the following activities, and excluding activities covered by Directive 91/271/EEC: (i)-(iv) (see scope). 5.5. Temporary storage of hazardous waste not covered under point 5.4 of Annex I to Directive 2010/75/EU pending any of the activities listed in points 5.1, 5.2, 5.4 and 5.6 of Annex I to Directive 2010/75/EU with a total capacity exceeding 50 tonnes, excluding temporary storage, pending collection, on the site where the waste is generated. 6.11. Independently operated treatment of waste water not covered by Directive 91/271/EEC and discharged by an installation undertaking activities covered under points 5.1, 5.3 or 5.5 as listed above. Reducing total phosphorus to water. The BAT-AEL emission level is 0,3-2 mg/l .
valid
2019-04-23
2019-04-23
WT-TP-BAT20-X
Waste Treatment - TP - BAT20-X
5. Waste management; 6. Other activities: 5.1. Disposal or recovery of hazardous waste with a capacity exceeding 10 tonnes per day involving one or more of the following activities: (a)-(j) (see scope); 5.3. (a) Disposal of non-hazardous waste with a capacity exceeding 50 tonnes per day involving one or more of the following activities, and excluding activities covered by Council Directive 91/271/EEC (1): (i)-(v) (see scope). (b) Recovery, or a mix of recovery and disposal, of non-hazardous waste with a capacity exceeding 75 tonnes per day involving one or more of the following activities, and excluding activities covered by Directive 91/271/EEC: (i)-(iv) (see scope). 5.5. Temporary storage of hazardous waste not covered under point 5.4 of Annex I to Directive 2010/75/EU pending any of the activities listed in points 5.1, 5.2, 5.4 and 5.6 of Annex I to Directive 2010/75/EU with a total capacity exceeding 50 tonnes, excluding temporary storage, pending collection, on the site where the waste is generated. 6.11. Independently operated treatment of waste water not covered by Directive 91/271/EEC and discharged by an installation undertaking activities covered under points 5.1, 5.3 or 5.5 as listed above. Reducing total phosphorus to water. The BAT-AEL emission level is 1-3 mg/l .
valid
2019-04-23
2019-04-23
WT-TSS-BAT20-V
Waste Treatment - TSS - BAT20-V
5. Waste management; 6. Other activities: 5.1. Disposal or recovery of hazardous waste with a capacity exceeding 10 tonnes per day involving one or more of the following activities: (a)-(j) (see scope); 5.3. (a) Disposal of non-hazardous waste with a capacity exceeding 50 tonnes per day involving one or more of the following activities, and excluding activities covered by Council Directive 91/271/EEC (1): (i)-(v) (see scope). (b) Recovery, or a mix of recovery and disposal, of non-hazardous waste with a capacity exceeding 75 tonnes per day involving one or more of the following activities, and excluding activities covered by Directive 91/271/EEC: (i)-(iv) (see scope). 5.5. Temporary storage of hazardous waste not covered under point 5.4 of Annex I to Directive 2010/75/EU pending any of the activities listed in points 5.1, 5.2, 5.4 and 5.6 of Annex I to Directive 2010/75/EU with a total capacity exceeding 50 tonnes, excluding temporary storage, pending collection, on the site where the waste is generated. 6.11. Independently operated treatment of waste water not covered by Directive 91/271/EEC and discharged by an installation undertaking activities covered under points 5.1, 5.3 or 5.5 as listed above. Reducing total suspended solids to water. The BAT-AEL emission level is 5-60 mg/l .
valid
2019-04-23
2019-04-23
WT-TVOC-BAT29-I
Waste Treatment - TVOC - BAT29-I
5. Waste management; 6. Other activities: 5.1. Disposal or recovery of hazardous waste with a capacity exceeding 10 tonnes per day involving one or more of the following activities: (a)-(j) (see scope); 5.3. (a) Disposal of non-hazardous waste with a capacity exceeding 50 tonnes per day involving one or more of the following activities, and excluding activities covered by Council Directive 91/271/EEC (1): (i)-(v) (see scope). (b) Recovery, or a mix of recovery and disposal, of non-hazardous waste with a capacity exceeding 75 tonnes per day involving one or more of the following activities, and excluding activities covered by Directive 91/271/EEC: (i)-(iv) (see scope). 5.5. Temporary storage of hazardous waste not covered under point 5.4 of Annex I to Directive 2010/75/EU pending any of the activities listed in points 5.1, 5.2, 5.4 and 5.6 of Annex I to Directive 2010/75/EU with a total capacity exceeding 50 tonnes, excluding temporary storage, pending collection, on the site where the waste is generated. 6.11. Independently operated treatment of waste water not covered by Directive 91/271/EEC and discharged by an installation undertaking activities covered under points 5.1, 5.3 or 5.5 as listed above; Techniques (a)-(d) (see table incl. footnote); Reducing TVOC emissions to air. The BAT-AEL emission level is 3-15 mg/Nm3 .
valid
2019-04-23
2019-04-23
WT-TVOC-BAT31
Waste Treatment - TVOC - BAT31
5. Waste management; 6. Other activities: 5.1. Disposal or recovery of hazardous waste with a capacity exceeding 10 tonnes per day involving one or more of the following activities: (a)-(j) (see scope); 5.3. (a) Disposal of non-hazardous waste with a capacity exceeding 50 tonnes per day involving one or more of the following activities, and excluding activities covered by Council Directive 91/271/EEC (1): (i)-(v) (see scope). (b) Recovery, or a mix of recovery and disposal, of non-hazardous waste with a capacity exceeding 75 tonnes per day involving one or more of the following activities, and excluding activities covered by Directive 91/271/EEC: (i)-(iv) (see scope). 5.5. Temporary storage of hazardous waste not covered under point 5.4 of Annex I to Directive 2010/75/EU pending any of the activities listed in points 5.1, 5.2, 5.4 and 5.6 of Annex I to Directive 2010/75/EU with a total capacity exceeding 50 tonnes, excluding temporary storage, pending collection, on the site where the waste is generated. 6.11. Independently operated treatment of waste water not covered by Directive 91/271/EEC and discharged by an installation undertaking activities covered under points 5.1, 5.3 or 5.5 as listed above; Apply BAT 14d, BAT 14h and use technique (a) and one or both of the techniques (b) and (c); Reducing TVOC emissions to air. The BAT-AEL emission level is 10-30 mg/Nm3 .
valid
2019-04-23
2019-04-23
WT-TVOC-BAT34-IV
Waste Treatment - TVOC - BAT34-IV
5. Waste management; 6. Other activities: 5.1. Disposal or recovery of hazardous waste with a capacity exceeding 10 tonnes per day involving one or more of the following activities: (a)-(j) (see scope); 5.3. (a) Disposal of non-hazardous waste with a capacity exceeding 50 tonnes per day involving one or more of the following activities, and excluding activities covered by Council Directive 91/271/EEC (1): (i)-(v) (see scope). (b) Recovery, or a mix of recovery and disposal, of non-hazardous waste with a capacity exceeding 75 tonnes per day involving one or more of the following activities, and excluding activities covered by Directive 91/271/EEC: (i)-(iv) (see scope). 5.5. Temporary storage of hazardous waste not covered under point 5.4 of Annex I to Directive 2010/75/EU pending any of the activities listed in points 5.1, 5.2, 5.4 and 5.6 of Annex I to Directive 2010/75/EU with a total capacity exceeding 50 tonnes, excluding temporary storage, pending collection, on the site where the waste is generated. 6.11. Independently operated treatment of waste water not covered by Directive 91/271/EEC and discharged by an installation undertaking activities covered under points 5.1, 5.3 or 5.5 as listed above; Techniques (a)-(e) (see table); Reducing TVOC emissions to air. The BAT-AEL emission level is 5-40 mg/Nm3 .
valid
2019-04-23
2019-04-23
WT-TVOC-BAT45
Waste Treatment - TVOC - BAT45
5. Waste management; 6. Other activities: 5.1. Disposal or recovery of hazardous waste with a capacity exceeding 10 tonnes per day involving one or more of the following activities: (a)-(j) (see scope); 5.3. (a) Disposal of non-hazardous waste with a capacity exceeding 50 tonnes per day involving one or more of the following activities, and excluding activities covered by Council Directive 91/271/EEC (1): (i)-(v) (see scope). (b) Recovery, or a mix of recovery and disposal, of non-hazardous waste with a capacity exceeding 75 tonnes per day involving one or more of the following activities, and excluding activities covered by Directive 91/271/EEC: (i)-(iv) (see scope). 5.5. Temporary storage of hazardous waste not covered under point 5.4 of Annex I to Directive 2010/75/EU pending any of the activities listed in points 5.1, 5.2, 5.4 and 5.6 of Annex I to Directive 2010/75/EU with a total capacity exceeding 50 tonnes, excluding temporary storage, pending collection, on the site where the waste is generated. 6.11. Independently operated treatment of waste water not covered by Directive 91/271/EEC and discharged by an installation undertaking activities covered under points 5.1, 5.3 or 5.5 as listed above; Reducing TVOC emissions to air. The BAT-AEL emission level is 5-30 mg/Nm3 .
valid
2019-04-23
2019-04-23
WT-TVOC-BAT47
Waste Treatment - TVOC - BAT47
5. Waste management; 6. Other activities: 5.1. Disposal or recovery of hazardous waste with a capacity exceeding 10 tonnes per day involving one or more of the following activities: (a)-(j) (see scope); 5.3. (a) Disposal of non-hazardous waste with a capacity exceeding 50 tonnes per day involving one or more of the following activities, and excluding activities covered by Council Directive 91/271/EEC (1): (i)-(v) (see scope). (b) Recovery, or a mix of recovery and disposal, of non-hazardous waste with a capacity exceeding 75 tonnes per day involving one or more of the following activities, and excluding activities covered by Directive 91/271/EEC: (i)-(iv) (see scope). 5.5. Temporary storage of hazardous waste not covered under point 5.4 of Annex I to Directive 2010/75/EU pending any of the activities listed in points 5.1, 5.2, 5.4 and 5.6 of Annex I to Directive 2010/75/EU with a total capacity exceeding 50 tonnes, excluding temporary storage, pending collection, on the site where the waste is generated. 6.11. Independently operated treatment of waste water not covered by Directive 91/271/EEC and discharged by an installation undertaking activities covered under points 5.1, 5.3 or 5.5 as listed above; Reducing TVOC emissions to air. The BAT-AEL emission level is 5-30 mg/Nm3 .
valid
2019-04-23
2019-04-23
WT-TVOC-BAT53-II
Waste Treatment - TVOC - BAT53-II
5. Waste management; 6. Other activities: 5.1. Disposal or recovery of hazardous waste with a capacity exceeding 10 tonnes per day involving one or more of the following activities: (a)-(j) (see scope); 5.3. (a) Disposal of non-hazardous waste with a capacity exceeding 50 tonnes per day involving one or more of the following activities, and excluding activities covered by Council Directive 91/271/EEC (1): (i)-(v) (see scope). (b) Recovery, or a mix of recovery and disposal, of non-hazardous waste with a capacity exceeding 75 tonnes per day involving one or more of the following activities, and excluding activities covered by Directive 91/271/EEC: (i)-(iv) (see scope). 5.5. Temporary storage of hazardous waste not covered under point 5.4 of Annex I to Directive 2010/75/EU pending any of the activities listed in points 5.1, 5.2, 5.4 and 5.6 of Annex I to Directive 2010/75/EU with a total capacity exceeding 50 tonnes, excluding temporary storage, pending collection, on the site where the waste is generated. 6.11. Independently operated treatment of waste water not covered by Directive 91/271/EEC and discharged by an installation undertaking activities covered under points 5.1, 5.3 or 5.5 as listed above; Reducing TVOC emissions to air. The BAT-AEL emission level is 3-20 mg/Nm3 .
valid
2019-04-23
2019-04-23
WT-Zn-BAT20-LI
Waste Treatment - Zn - BAT20-LI
5. Waste management; 6. Other activities: 5.1. Disposal or recovery of hazardous waste with a capacity exceeding 10 tonnes per day involving one or more of the following activities: (a)-(j) (see scope); 5.3. (a) Disposal of non-hazardous waste with a capacity exceeding 50 tonnes per day involving one or more of the following activities, and excluding activities covered by Council Directive 91/271/EEC (1): (i)-(v) (see scope). (b) Recovery, or a mix of recovery and disposal, of non-hazardous waste with a capacity exceeding 75 tonnes per day involving one or more of the following activities, and excluding activities covered by Directive 91/271/EEC: (i)-(iv) (see scope). 5.5. Temporary storage of hazardous waste not covered under point 5.4 of Annex I to Directive 2010/75/EU pending any of the activities listed in points 5.1, 5.2, 5.4 and 5.6 of Annex I to Directive 2010/75/EU with a total capacity exceeding 50 tonnes, excluding temporary storage, pending collection, on the site where the waste is generated. 6.11. Independently operated treatment of waste water not covered by Directive 91/271/EEC and discharged by an installation undertaking activities covered under points 5.1, 5.3 or 5.5 as listed above. Reducing zinc to water. The BAT-AEL emission level is 0,1-2 mg/l .
valid
2019-04-23
2019-04-23
WT-Zn-BAT20-XLII
Waste Treatment - Zn - BAT20-XLII
5. Waste management; 6. Other activities: 5.1. Disposal or recovery of hazardous waste with a capacity exceeding 10 tonnes per day involving one or more of the following activities: (a)-(j) (see scope); 5.3. (a) Disposal of non-hazardous waste with a capacity exceeding 50 tonnes per day involving one or more of the following activities, and excluding activities covered by Council Directive 91/271/EEC (1): (i)-(v) (see scope). (b) Recovery, or a mix of recovery and disposal, of non-hazardous waste with a capacity exceeding 75 tonnes per day involving one or more of the following activities, and excluding activities covered by Directive 91/271/EEC: (i)-(iv) (see scope). 5.5. Temporary storage of hazardous waste not covered under point 5.4 of Annex I to Directive 2010/75/EU pending any of the activities listed in points 5.1, 5.2, 5.4 and 5.6 of Annex I to Directive 2010/75/EU with a total capacity exceeding 50 tonnes, excluding temporary storage, pending collection, on the site where the waste is generated. 6.11. Independently operated treatment of waste water not covered by Directive 91/271/EEC and discharged by an installation undertaking activities covered under points 5.1, 5.3 or 5.5 as listed above. Reducing zinc to water. The BAT-AEL emission level is 0,1-1 mg/l .
valid
2019-04-23
2019-04-23
WT-Zn-BAT20-XXII
Waste Treatment - Zn - BAT20-XXII
5. Waste management; 6. Other activities: 5.1. Disposal or recovery of hazardous waste with a capacity exceeding 10 tonnes per day involving one or more of the following activities: (a)-(j) (see scope); 5.3. (a) Disposal of non-hazardous waste with a capacity exceeding 50 tonnes per day involving one or more of the following activities, and excluding activities covered by Council Directive 91/271/EEC (1): (i)-(v) (see scope). (b) Recovery, or a mix of recovery and disposal, of non-hazardous waste with a capacity exceeding 75 tonnes per day involving one or more of the following activities, and excluding activities covered by Directive 91/271/EEC: (i)-(iv) (see scope). 5.5. Temporary storage of hazardous waste not covered under point 5.4 of Annex I to Directive 2010/75/EU pending any of the activities listed in points 5.1, 5.2, 5.4 and 5.6 of Annex I to Directive 2010/75/EU with a total capacity exceeding 50 tonnes, excluding temporary storage, pending collection, on the site where the waste is generated. 6.11. Independently operated treatment of waste water not covered by Directive 91/271/EEC and discharged by an installation undertaking activities covered under points 5.1, 5.3 or 5.5 as listed above. Reducing zinc to water. The BAT-AEL emission level is 0,1-1 mg/l .
valid
2019-04-23
2019-04-23
WT-Zn-BAT20-XXXI
Waste Treatment - Zn - BAT20-XXXI
5. Waste management; 6. Other activities: 5.1. Disposal or recovery of hazardous waste with a capacity exceeding 10 tonnes per day involving one or more of the following activities: (a)-(j) (see scope); 5.3. (a) Disposal of non-hazardous waste with a capacity exceeding 50 tonnes per day involving one or more of the following activities, and excluding activities covered by Council Directive 91/271/EEC (1): (i)-(v) (see scope). (b) Recovery, or a mix of recovery and disposal, of non-hazardous waste with a capacity exceeding 75 tonnes per day involving one or more of the following activities, and excluding activities covered by Directive 91/271/EEC: (i)-(iv) (see scope). 5.5. Temporary storage of hazardous waste not covered under point 5.4 of Annex I to Directive 2010/75/EU pending any of the activities listed in points 5.1, 5.2, 5.4 and 5.6 of Annex I to Directive 2010/75/EU with a total capacity exceeding 50 tonnes, excluding temporary storage, pending collection, on the site where the waste is generated. 6.11. Independently operated treatment of waste water not covered by Directive 91/271/EEC and discharged by an installation undertaking activities covered under points 5.1, 5.3 or 5.5 as listed above. Reducing zinc to water. The BAT-AEL emission level is 0,1-2 mg/l .
valid
2019-04-23
2019-04-23
BAT Conclusion Value
BATConclusionValue
Released
marnaian
2019-02-25 10:35:28.0
Common
false
false
CAK
Production of Chlor-alkali
Production of Chlor-alkali
valid
2018-10-02
CER
Ceramic Manufacturing Industry
Ceramic Manufacturing Industry
valid
2018-10-02
CLM
Production of Cement, Lime and Magnesium Oxide
Production of Cement, Lime and Magnesium Oxide
valid
2018-10-02
CWW
Common Waste Water and Waste Gas Treatment/ Management Systems in the Chemical Sector
Common Waste Water and Waste Gas Treatment/ Management Systems in the Chemical Sector
valid
2018-10-02
FDM
Food, Drink and Milk Industries
Food, Drink and Milk Industries
valid
2018-10-02
FMP
Ferrous Metals Processing Industry
Ferrous Metals Processing Industry
valid
2018-10-02
GLS
Manufacture of Glass
Manufacture of Glass
valid
2018-10-02
IRPP
Intensive Rearing of Poultry or Pigs
Intensive Rearing of Poultry or Pigs
valid
2018-10-02
IS
Iron and Steel Production
Iron and Steel Production
valid
2018-10-02
LCP
Large Combustion Plants
Large Combustion Plants
valid
2018-10-02
LVOC
Production of Large Volume Organic Chemicals
Production of Large Volume Organic Chemicals
valid
2018-10-02
NFM
Non-ferrous Metals Industries
Non-ferrous Metals Industries
valid
2018-10-02
NOBATCAPPLICABLE
NOBATCAPPLICABLE
In some circumstances there may be no applicable BATC for an IED permitted installation. In these cases this code list entry should be used.
valid
2019-02-20
PP
Production of Pulp, Paper and Board
Production of Pulp, Paper and Board
valid
2018-10-02
REF
Refining of Mineral Oil and Gas
Refining of Mineral Oil and Gas
valid
2018-10-02
SA
Slaughterhouses and Animals By-products Industries
Slaughterhouses and Animals By-products Industries
valid
2018-10-02
SF
Smitheries and Foundries Industry
Smitheries and Foundries Industry
valid
2018-10-02
STM
Surface Treatment Of Metals and Plastics
Surface Treatment Of Metals and Plastics
valid
2018-10-02
STS
Surface Treatment Using Organic Solvents (including Wood and Wood Products Preservation with Chemicals)
Surface Treatment Using Organic Solvents (including Wood and Wood Products Preservation with Chemicals)
valid
2018-10-02
TAN
Tanning of Hides and Skins
Tanning of Hides and Skins
valid
2018-10-02
TXT
Textiles Industry
Textiles Industry
valid
2018-10-02
WBP
Wood-based Panels Production
Wood-based Panels Production
valid
2018-10-02
WGC
Common Waste Gas Treatment in the Chemical Sector
Common Waste Gas Treatment in the Chemical Sector
valid
2018-10-02
WI
Waste Incineration
Waste Incineration
valid
2018-10-02
WT
Waste Treatment
Waste Treatment
valid
2018-10-02
BATCNOTYETADOPTED
BATCNOTYETADOPTED
This code list entry should be used where there will be a BATC for an activity but the BATC document has not yet been adopted. In some limited cases there is no relevant BATC available or planned for an activity and in these cases the alternative code list entry BATCNOTAPPLICABLE should be used
valid
2019-02-25
LVIC
Large Volume Inorganic Chemicals
This BATC will cover all activities involved in Large Volume Inorganic Chemicals.
valid
2019-02-25
The status of an entity with regards to its completion and use.
ConditionOfFacilityValue
Released
opielaur
2020-09-17 08:09:40.0
Common
false
false
decommissioned
Decommissioned
The entity is no longer used and is being or has been decommissioned/closed.
valid
2016-06-07
Disused
Disused
The entity is no longer used, but is not being or has not been decommissioned.
valid
2017-02-08
functional
Functional
The entity is functional.
valid
2016-06-07
not regulated
Not regulated
The entity that was within the scope of EU law on industrial emissions is no longer within the scope of a relevant piece of EU law reporting to the EU Registry due to changes in its activity or decrease of capacity.
valid
2017-08-22
Strict ISO-3166 of countries that will report to the EU Registry
CountryCodeValue
Released
marnaian
2019-08-27 14:13:08.0
Common
false
false
AT
Austria
valid
2017-05-08
2017-05-08
BE
Belgium
valid
2017-05-08
2017-05-08
BG
Bulgaria
valid
2017-05-08
2017-05-08
CH
Switzerland
valid
2017-05-08
2017-05-08
CY
Cyprus
valid
2017-05-08
2017-05-08
CZ
Czech Republic
valid
2017-05-08
2017-05-08
DE
Germany
valid
2017-05-08
2017-05-08
DK
Denmark
valid
2017-05-08
2017-05-08
EE
Estonia
valid
2017-05-08
2017-05-08
GR
Greece
valid
2017-05-08
2017-05-08
ES
Spain
valid
2017-05-08
2017-05-08
FI
Finland
valid
2017-05-08
2017-05-08
FR
France
valid
2017-05-08
2017-05-08
GB
United Kingdom
valid
2017-05-08
2017-05-08
HR
Croatia
valid
2017-05-08
2017-05-08
HU
Hungary
valid
2017-05-08
2017-05-08
IE
Ireland
valid
2017-05-08
2017-05-08
IS
Iceland
valid
2017-05-08
2017-05-08
IT
Italy
valid
2017-05-08
2017-05-08
LI
Liechtenstein
valid
2017-05-08
2017-05-08
LT
Lithuania
valid
2017-05-08
2017-05-08
LU
Luxembourg
valid
2017-05-08
2017-05-08
LV
Latvia
valid
2017-05-08
2017-05-08
MT
Malta
valid
2017-05-08
2017-05-08
NL
Netherlands
valid
2017-05-08
2017-05-08
NO
Norway
valid
2017-05-08
2017-05-08
PL
Poland
valid
2017-05-08
2017-05-08
PT
Portugal
valid
2017-05-08
2017-05-08
RO
Romania
valid
2017-05-08
2017-05-08
RS
Serbia
valid
2017-05-08
2017-05-08
SE
Sweden
valid
2017-05-08
2017-05-08
SI
Slovenia
valid
2017-05-08
2017-05-08
SK
Slovakia
valid
2017-05-08
2017-05-08
XK
Kosovo under UNSCR 1244/99
valid
2017-05-08
2017-05-08
Derogation regimes under Chapter III of Directive 2010/75/EU
DerogationValue
Released
alvardan
2017-02-08 17:03:47.0
Common
false
false
Art72.4.b
Plant due to additional reporting for operating under an annual average of 1500 hours.
Plant due to additional reporting for operating under an annual average of 1500 hours.
valid
2016-06-07
Art31
Desulphurisation rate applied in accordance with clauses (1) and (2) of Article 31 of Directive 2010/75/EU
Desulphurisation rate applied in accordance with clauses (1) and (2) of Article 31 of Directive 2010/75/EU
valid
2016-06-07
Art32
Exemption from compliance with emission limit values or desulphurisation rates due to coverage by transitional national plan, in accordance with Article 32(2) of Directive 2010/75/EU
Exemption from compliance with emission limit values or desulphurisation rates due to coverage by transitional national plan, in accordance with Article 32(2) of Directive 2010/75/EU
valid
2016-06-07
Art33
Limited life time derogation granted in accordance with Article 33(1) of Directive 2010/75/EU
Limited life time derogation granted in accordance with Article 33(1) of Directive 2010/75/EU
valid
2016-06-07
Art34
Exemption from compliance with emission limit values and desulphurisation rates due to being a small isolated system, in accordance with Article 34(1) of Directive 2010/75/EU
Exemption from compliance with emission limit values and desulphurisation rates due to being a small isolated system, in accordance with Article 34(1) of Directive 2010/75/EU
valid
2016-06-07
Art35
District heating plant exempted from compliance with emission limits values and rates of desulphurisation, in accordance with conditions listed in Article 35 of Directive 2010/75/EU
District heating plant exempted from compliance with emission limits values and rates of desulphurisation, in accordance with conditions listed in Article 35 of Directive 2010/75/EU
valid
2016-06-07
Activity values based on Annex 1 to Regulation EU no. 166/2006
EPRTRAnnexIActivityValue
Released
marnaian
2019-01-25 13:00:38.0
Common
false
false
1(a)
Mineral oil and gas refineries
Mineral oil and gas refineries
valid
2017-02-08
2017-02-08
1(b)
Installations for gasification and liquefaction
Installations for gasification and liquefaction
valid
2017-02-08
2017-02-08
1(c)
Thermal power stations and other combustion installations
Thermal power stations and other combustion installations
valid
2017-02-08
2017-02-08
1(d)
Coke ovens
Coke ovens
valid
2017-02-08
2017-02-08
1(e)
Coal rolling mills with a capacity of 1 tonne per hour
Coal rolling mills with a capacity of 1 tonne per hour
valid
2017-09-01
1(f)
Installations for the manufacture of coal products and solid smokeless fuel
Installations for the manufacture of coal products and solid smokeless fuel
valid
2017-02-08
2017-02-08
2(a)
Metal ore (including sulphide ore) roasting or sintering installations
Metal ore (including sulphide ore) roasting or sintering installations
valid
2017-02-08
2017-02-08
2(b)
Installations for the production of pig iron or steel (primary or secondary melting) including continuous casting
Installations for the production of pig iron or steel (primary or secondary melting) including continuous casting
valid
2017-02-08
2017-02-08
2(c)
Installations for the processing of ferrous metals. Note to reporters, use Level 3 activity e.g. 2(c)(i), in preference to 2(c). Level 2 activity class (i.e. 2(c)) only to be used where Level 3 is not available.
valid
2019-01-04
2(c)(i)
Installations for the processing of ferrous metals, Hot-rolling mills
Installations for the processing of ferrous metals, Hot-rolling mills
valid
2017-02-08
2017-02-08
2(c)(ii)
Installations for the processing of ferrous metals, Smitheries with hammers
Installations for the processing of ferrous metals, Smitheries with hammers
valid
2017-02-08
2017-02-08
2(c)(iii)
Installations for the processing of ferrous metals, Application of protective fused metal coats
Installations for the processing of ferrous metals, Application of protective fused metal coats
valid
2017-02-08
2017-02-08
2(d)
Ferrous metal foundries with a production capacity of 20 tonnes per day
Ferrous metal foundries with a production capacity of 20 tonnes per day or more
valid
2017-09-01
2(e)
Installations for the production and/or smelting of non-ferrous metals. Note to reporters, use Level 3 activity e.g. 2(e)(i), in preference to 2(e). Level 2 activity class (i.e. 2(e)) only to be used where Level 3 is not available.
valid
2019-01-04
2(e)(i)
Installation for the production of non-ferrous crude metals from ore, concentrates or secondary raw materials by metallurgical, chemical or electrolytic processes
Installation for the production of non-ferrous crude metals from ore,
concentrates or secondary raw materials by metallurgical,
chemical or electrolytic processes
valid
2017-09-01
2(e)(ii)
Installation for the smelting, including the alloying, of non-ferrous metals, including recovered products (refining, foundry casting, etc.)
Installation for the smelting, including the alloying, of non-ferrous
metals, including recovered products (refining, foundry casting, etc.). The installations are under the scope of this category when the melting capacity of 4 tonnes per day for lead and cadmium or 20 tonnes per day for all other metals
valid
2017-09-01
2(f)
Installations for surface treatment of metals and plastic materials using an electrolytic or chemical process
Installations for surface treatment of metals and plastic materials using an electrolytic or chemical process
valid
2017-02-08
2017-02-08
3(a)
Underground mining and related operations
Underground mining and related operations
valid
2017-02-08
2017-02-08
3(b)
Opencast mining and quarrying
Opencast mining and quarrying
valid
2017-02-08
2017-02-08
3(c)
Installations for the production of cement clinker in rotary kilns, lime in rotary kilns, cement or lime in other furnaces. Note to reporters, use Level 3 activity e.g. 3(c)(i), in preference to 3(c). Level 2 activity class (i.e. 3(c)) only to be used where Level 3 is not available.
valid
2019-01-04
3(c)(i)
Installations for the production of cement clinker in rotary kilns
Installations for the production of cement clinker in rotary kilns
valid
2017-02-08
2017-02-08
3(c)(ii)
Installations for the production of lime in rotary kilns
Installations for the production of lime in rotary kilns
valid
2017-02-08
2017-02-08
3(c)(iii)
Installations for the production of cement clinker or lime in other furnaces
Installations for the production of cement clinker or lime in other furnaces
valid
2017-02-08
2017-02-08
3(d)
Installations for the production of asbestos and the manufacture of asbestos based products
Installations for the production of asbestos and the manufacture of asbestos based products
valid
2017-02-08
2017-02-08
3(e)
Installations for the manufacture of glass, including glass fibre
Installations for the manufacture of glass, including glass fibre
valid
2017-02-08
2017-02-08
3(f)
Installations for melting mineral substances, including the production of mineral fibres
Installations for melting mineral substances, including the production of mineral fibres
valid
2017-02-08
2017-02-08
3(g)
Installations for the manufacture of ceramic products by firing, in particular roofing tiles, bricks, refractory bricks, tiles, stoneware or porcelain
Installations for the manufacture of ceramic products by firing, in particular roofing tiles, bricks, refractory bricks, tiles, stoneware or porcelain
valid
2017-02-08
2017-02-08
4(a)
Chemical installations for the production on an industrial scale of basic organic chemicals. Note to reporters, use Level 3 activity e.g. 4(a)(iii), in preference to 4(a). Level 2 activity class (i.e. 4(a)) only to be used where Level 3 is not available.
valid
2019-01-04
4(a)(i)
Chemical installations for the production on an industrial scale of basic organic chemicals: Simple hydrocarbons (linear or cyclic, saturated or unsaturated, aliphatic or aromatic)
Chemical installations for the production on an industrial scale of basic organic chemicals: Simple hydrocarbons (linear or cyclic, saturated or unsaturated, aliphatic or aromatic)
valid
2017-02-08
2017-02-08
4(a)(ix)
Chemical installations for the production on an industrial scale of basic organic chemicals: Synthetic rubbers
Chemical installations for the production on an industrial scale of basic organic chemicals: Synthetic rubbers
valid
2017-02-08
2017-02-08
4(a)(ii)
Chemical installations for the production on an industrial scale of basic organic chemicals: Oxygen-containing hydrocarbons such as alcohols, aldehydes, ketones, carboxylic acids, esters, acetates, ethers, peroxides, epoxy resins
Chemical installations for the production on an industrial scale of basic organic chemicals: Oxygen-containing hydrocarbons such as alcohols, aldehydes, ketones, carboxylic acids, esters, acetates, ethers, peroxides, epoxy resins
valid
2017-02-08
2017-02-08
4(a)(iii)
Chemical installations for the production on an industrial scale of basic organic chemicals: Sulphurous hydrocarbons
Chemical installations for the production on an industrial scale of basic organic chemicals: Sulphurous hydrocarbons
valid
2017-02-08
2017-02-08
4(a)(iv)
Chemical installations for the production on an industrial scale of basic organic chemicals: Nitrogenous hydrocarbons such as amines, amides, nitrous compounds, nitro compounds or nitrate compounds, nitriles, cyanates, isocyanates
Chemical installations for the production on an industrial scale of basic organic chemicals: Nitrogenous hydrocarbons such as amines, amides, nitrous compounds, nitro compounds or nitrate compounds, nitriles, cyanates, isocyanates
valid
2017-02-08
2017-02-08
4(a)(v)
Chemical installations for the production on an industrial scale of basic organic chemicals: Phosphorus-containing hydrocarbons
Chemical installations for the production on an industrial scale of basic organic chemicals: Phosphorus-containing hydrocarbons
valid
2017-02-08
2017-02-08
4(a)(vi)
Chemical installations for the production on an industrial scale of basic organic chemicals: Halogenic hydrocarbons
Chemical installations for the production on an industrial scale of basic organic chemicals: Halogenic hydrocarbons
valid
2017-02-08
2017-02-08
4(a)(vii)
Chemical installations for the production on an industrial scale of basic organic chemicals: Organometallic compounds
Chemical installations for the production on an industrial scale of basic organic chemicals: Organometallic compounds
valid
2017-02-08
2017-02-08
4(a)(viii)
Chemical installations for the production on an industrial scale of basic organic chemicals: Basic plastic materials (polymers, synthetic fibres and cellulose-based fibres)
Chemical installations for the production on an industrial scale of basic organic chemicals: Basic plastic materials (polymers, synthetic fibres and cellulose-based fibres)
valid
2017-02-08
2017-02-08
4(a)(x)
Chemical installations for the production on an industrial scale of basic organic chemicals: Dyes and pigments
Chemical installations for the production on an industrial scale of basic organic chemicals: Dyes and pigments
valid
2017-02-08
2017-02-08
4(a)(xi)
Chemical installations for the production on an industrial scale of basic organic chemicals: Surface-active agents and surfactants
Chemical installations for the production on an industrial scale of basic organic chemicals: Surface-active agents and surfactants
valid
2017-02-08
2017-02-08
4(b)
Chemical installations for the production on an industrial scale of basic inorganic chemicals. Note to reporters, use Level 3 activity e.g. 4(b)(i), in preference to 4(b). Level 2 activity class (i.e. 4(b)) only to be used where Level 3 is not available.
valid
2019-01-04
4(b)(i)
Chemical installations for the production on an industrial scale of basic inorganic chemicals: Gases, such as ammonia, chlorine or hydrogen chloride, fluorine or hydrogen fluoride, carbon oxides, sulphur compounds, nitrogen oxides, hydrogen, sulphur dioxide, carbonyl chloride
Chemical installations for the production on an industrial scale of basic inorganic chemicals: Gases, such as ammonia, chlorine or hydrogen chloride, fluorine or hydrogen fluoride, carbon oxides, sulphur compounds, nitrogen oxides, hydrogen, sulphur dioxide, carbonyl chloride
valid
2017-02-08
2017-02-08
4(b)(ii)
Chemical installations for the production on an industrial scale of basic inorganic chemicals: Acids, such as chromic acid, hydrofluoric acid, phosphoric acid, nitric acid, hydrochloric acid, sulphuric acid, oleum, sulphurous acids
Chemical installations for the production on an industrial scale of basic inorganic chemicals: Acids, such as chromic acid, hydrofluoric acid, phosphoric acid, nitric acid, hydrochloric acid, sulphuric acid, oleum, sulphurous acids
valid
2017-02-08
2017-02-08
4(b)(iii)
Chemical installations for the production on an industrial scale of basic inorganic chemicals: Bases, such as ammonium hydroxide, potassium hydroxide, sodium hydroxide
Chemical installations for the production on an industrial scale of basic inorganic chemicals: Bases, such as ammonium hydroxide, potassium hydroxide, sodium hydroxide
valid
2017-02-08
2017-02-08
4(b)(iv)
Chemical installations for the production on an industrial scale of basic inorganic chemicals: Salts, such as ammonium chloride, potassium chlorate, potassium carbonate, sodium carbonate, perborate, silver nitrate
Chemical installations for the production on an industrial scale of basic inorganic chemicals: Salts, such as ammonium chloride, potassium chlorate, potassium carbonate, sodium carbonate, perborate, silver nitrate
valid
2017-02-08
2017-02-08
4(b)(v)
Chemical installations for the production on an industrial scale of basic inorganic chemicals: Non-metals, metal oxides or other inorganic compounds such as calcium carbide, silicon, silicon carbide
Chemical installations for the production on an industrial scale of basic inorganic chemicals: Non-metals, metal oxides or other inorganic compounds such as calcium carbide, silicon, silicon carbide
valid
2017-02-08
2017-02-08
4(c)
Chemical installations for the production on an industrial scale of phosphorous, nitrogen or potassium based fertilisers (simple or compound fertilisers)
Chemical installations for the production on an industrial scale of phosphorous, nitrogen or potassium based fertilisers (simple or compound fertilisers)
valid
2017-02-08
2017-02-08
4(d)
Chemical installations for the production on an industrial scale of basic plant health products and of biocides
Chemical installations for the production on an industrial scale of basic plant health products and of biocides
valid
2017-02-08
2017-02-08
4(e)
Installations using a chemical or biological process for the production on an industrial scale of basic pharmaceutical products
Installations using a chemical or biological process for the production on an industrial scale of basic pharmaceutical products
valid
2017-02-08
2017-02-08
4(f)
Installations for the production on an industrial scale of explosives and pyrotechnic products
Installations for the production on an industrial scale of explosives and pyrotechnic products
valid
2017-02-08
2017-02-08
5(a)
Installations for the recovery or disposal of hazardous waste
Installations for the recovery or disposal of hazardous waste
valid
2017-02-08
2017-02-08
5(b)
Installations for the incineration of non-hazardous waste in the scope of Directive 2000/76/EC of the European Parliament and of the Council of 4 December 2000 on the incineration of waste
Installations for the incineration of non-hazardous waste in the scope of Directive 2000/76/EC of the European Parliament and of the Council of 4 December 2000 on the incineration of waste
valid
2017-02-08
2017-02-08
5(c)
Installations for the disposal of non-hazardous waste
Installations for the disposal of non-hazardous waste
valid
2017-02-08
2017-02-08
5(d)
Landfills (excluding landfills of inert waste and landfills, which were definitely closed before 16.7.2001 or for which the after-care phase required by the competent authorities according to Article 13 of Council Directive 1999/31/EC of 26 April 1999 on the landfill of waste has expired)
Landfills (excluding landfills of inert waste and landfills, which were definitely closed before 16.7.2001 or for which the after-care phase required by the competent authorities according to Article 13 of Council Directive 1999/31/EC of 26 April 1999 on the landfill of waste has expired)
valid
2017-02-08
2017-02-08
5(e)
Installations for the disposal or recycling of animal carcasses and animal waste
Installations for the disposal or recycling of animal carcasses and animal waste
valid
2017-02-08
2017-02-08
5(f)
Urban waste-water treatment plants
Urban waste-water treatment plants
valid
2017-02-08
2017-02-08
5(g)
Independently operated industrial waste-water treatment plants which serve one or more activities covered in annex 1 of Regulation 166/2006
Independently operated industrial waste-water treatment plants which serve one or more activities covered in annex 1 of Regulation 166/2006
valid
2017-02-08
2017-02-08
6(a)
Industrial plants for the production of pulp from timber or similar fibrous materials
Industrial plants for the production of pulp from timber or similar fibrous materials
valid
2017-02-08
2017-02-08
6(b)
Industrial plants for the production of paper and board and other primary wood products (such as chipboard, fibreboard and plywood)
Industrial plants for the production of paper and board and other primary wood products (such as chipboard, fibreboard and plywood)
valid
2017-02-08
2017-02-08
6(c)
Industrial plants for the preservation of wood and wood products with chemicals
Industrial plants for the preservation of wood and wood products with chemicals
valid
2017-02-08
2017-02-08
7(a)
Installations for the intensive rearing of poultry or pigs. Note to reporters, use Level 3 activity e.g. 7(a)(ii), in preference to 7(a). Level 2 activity class (i.e. 7(a)) only to be used where Level 3 is not available.
valid
2019-01-04
7(a)(i)
Installations for the intensive rearing of poultry with 40,000 places for poultry
Installations for the intensive rearing of poultry with 40,000 places for poultry
valid
2017-02-08
2017-02-08
7(a)(ii)
Installations for the intensive rearing of pigs with 2,000 places for production pigs (over 30 kg)
Installations for the intensive rearing of pigs with 2,000 places for production pigs (over 30 kg)
valid
2017-02-08
2017-02-08
7(a)(iii)
Installations for the intensive rearing of pigs with 750 places for sows
Installations for the intensive rearing of pigs with 750 places for sows
valid
2017-02-08
2017-02-08
7(b)
Intensive aquaculture
Intensive aquaculture
valid
2017-02-08
2017-02-08
8(a)
Slaughterhouses
Slaughterhouses
valid
2017-02-08
2017-02-08
8(b)
Treatment and processing intended for the production of food and beverage products. Note to reporters, use Level 3 activity e.g. 8(b)(i), in preference to 8(b). Level 2 activity class (i.e. 8(b)) only to be used where Level 3 is not available.
valid
2019-01-04
8(b)(i)
Treatment and processing intended for the production of food and beverage products from animal raw materials (other than milk)
Treatment and processing intended for the production of food and beverage products from animal raw materials (other than milk)
valid
2017-02-08
2017-02-08
8(b)(ii)
Treatment and processing intended for the production of food and beverage products from vegetable raw materials
Treatment and processing intended for the production of food and beverage products from vegetable raw materials
valid
2017-02-08
2017-02-08
8(c)
Treatment and processing of milk
Treatment and processing of milk
valid
2017-02-08
2017-02-08
9(a)
Plants for the pre-treatment (operations such as washing,
bleaching, mercerisation) or dyeing of fibres or textiles
Plants for the pre-treatment (operations such as washing,
bleaching, mercerisation) or dyeing of fibres or textiles
valid
2017-02-08
2017-02-08
9(b)
Plants for the tanning of hides and skins
Plants for the tanning of hides and skins
valid
2017-02-08
2017-02-08
9(c)
Installations for the surface treatment of substances, objects or products using organic solvents, in particular for dressing, printing, coating, degreasing, waterproofing, sizing, painting, cleaning or impregnating
Installations for the surface treatment of substances, objects or products using organic solvents, in particular for dressing, printing, coating, degreasing, waterproofing, sizing, painting, cleaning or impregnating
valid
2017-02-08
2017-02-08
9(d)
Installations for the production of carbon (hard-burnt coal) or electro-graphite by means of incineration or graphitisation
Installations for the production of carbon (hard-burnt coal) or electro-graphite by means of incineration or graphitisation
valid
2017-02-08
2017-02-08
9(e)
Installations for the building of, and painting or removal of paint from ships with a capacity for ships 100 m long
Installations for the building of, and painting or removal of paint from ships with a capacity for ships 100 m long
valid
2017-09-01
Facility Type Value
FacilityTypeValue
Released
claudia
2019-01-16 08:38:30.0
Common
false
false
EPRTR
EPRTR
Facility is subject to the E-PRTR regulation.
valid
2018-10-02
NONEPRTR
Non-EPRTR
Facility is not subject to the E-PRTR regulation.
valid
2018-10-02
Activities listed in Annex I to Directive 2010/75/EU which are operated in the installation.
IEDAnnexIActivityValue
Released
marnaian
2019-06-07 11:45:47.0
Common
false
false
1
Energy industries
Energy industries
invalid
2018-05-17
2017-02-08
2018-05-17
1.1
Combustion of fuels in installations with a total rated thermal input of 50 MW or more
Combustion of fuels in installations with a total rated thermal input of 50 MW or more
valid
2017-02-08
2017-02-08
1.2
Refining of mineral oil and gas
Refining of mineral oil and gas
valid
2017-02-08
2017-02-08
1.3
Production of coke
Production of coke
valid
2017-02-08
2017-02-08
1.4(a)
Gasification or liquefaction of coal
Gasification or liquefaction of coal
valid
2017-02-08
2017-02-08
1.4(b)
Gasification or liquefaction of fuels other than coal, in installations with a total rated thermal input of 20 MW or more
Gasification or liquefaction of fuels other than coal, in installations with a total rated thermal input of 20 MW or more
valid
2017-02-08
2017-02-08
2
Production and processing of metals
Production and processing of metals
invalid
2018-05-17
2017-02-08
2018-05-17
2.1
Metal ore (including sulphide ore) roasting or sintering
Metal ore (including sulphide ore) roasting or sintering
valid
2017-02-08
2017-02-08
2.2
Production of pig iron or steel (primary or secondary fusion) including continuous casting, with a capacity exceeding 2.5 tonnes per hour
Production of pig iron or steel (primary or secondary fusion) including continuous casting, with a capacity exceeding 2.5 tonnes per hour
valid
2017-02-08
2017-02-08
2.3(a)
Processing of ferrous metals: operation of hot-rolling mills with a capacity exceeding 20 tonnes of crude steel per hour
Processing of ferrous metals: operation of hot-rolling mills with a capacity exceeding 20 tonnes of crude steel per hour
valid
2017-02-08
2017-02-08
2.3(b)
Processing of ferrous metals: operation of smitheries with hammers the energy of which exceeds 50 kilojoule per hammer, where the calorific power used exceeds 20 MW
Processing of ferrous metals: operation of smitheries with hammers the energy of which exceeds 50 kilojoule per hammer, where the calorific power used exceeds 20 MW
valid
2017-02-08
2017-02-08
2.3(c)
Processing of ferrous metals: application of protective fused metal coats with an input exceeding 2 tonnes of crude steel per hour.
Processing of ferrous metals: application of protective fused metal coats with an input exceeding 2 tonnes of crude steel per hour.
valid
2017-02-08
2017-02-08
2.4
Operation of ferrous metal foundries with a production capacity exceeding 20 tonnes per day
Operation of ferrous metal foundries with a production capacity exceeding 20 tonnes per day
valid
2017-02-08
2017-02-08
2.5(a)
Processing of non-ferrous metals: production of non-ferrous crude metals from ore, concentrates or secondary raw materials by metallurgical, chemical or electrolytic processes
Processing of non-ferrous metals: production of non-ferrous crude metals from ore, concentrates or secondary raw materials by metallurgical, chemical or electrolytic processes
valid
2017-02-08
2017-02-08
2.5(b)
Processing of non-ferrous metals: melting, including the alloyage, of non-ferrous metals, including recovered products and operation of non-ferrous metal foundries, with a melting capacity exceeding 4 tonnes per day for lead and cadmium or 20 tonnes per day for all other metals.
Processing of non-ferrous metals: melting, including the alloyage, of non-ferrous metals, including recovered products and operation of non-ferrous metal foundries, with a melting capacity exceeding 4 tonnes per day for lead and cadmium or 20 tonnes per day for all other metals.
valid
2017-02-08
2017-02-08
2.6
Surface treatment of metals or plastic materials using an electrolytic or chemical process where the volume of the treatment vats exceeds 30 m3
Surface treatment of metals or plastic materials using an electrolytic or chemical process where the volume of the treatment vats exceeds 30 m3
valid
2017-02-08
2017-02-08
3
Mineral industry
Mineral industry
invalid
2018-05-17
2017-02-08
2018-05-17
3.1(a)
Production of cement clinker in rotary kilns with a production capacity exceeding 500 tonnes per day or in other kilns with a production capacity exceeding 50 tonnes per day
Production of cement clinker in rotary kilns with a production capacity exceeding 500 tonnes per day or in other kilns with a production capacity exceeding 50 tonnes per day
valid
2017-02-08
2017-02-08
3.1(b)
Production of lime in kilns with a production capacity exceeding 50 tonnes per day
Production of lime in kilns with a production capacity exceeding 50 tonnes per day
valid
2017-02-08
2017-02-08
3.1(c)
Production of magnesium oxide in kilns with a production capacity exceeding 50 tonnes per day
Production of magnesium oxide in kilns with a production capacity exceeding 50 tonnes per day
valid
2017-02-08
2017-02-08
3.2
Production of asbestos or the manufacture of asbestos based products
Production of asbestos or the manufacture of asbestos based products
valid
2017-02-08
2017-02-08
3.3
Manufacture of glass including glass fibre with a melting capacity exceeding 20 tonnes per day
Manufacture of glass including glass fibre with a melting capacity exceeding 20 tonnes per day
valid
2017-02-08
2017-02-08
3.4
Melting mineral substances including the production of mineral fibres with a melting capacity exceeding 20 tonnes per day
Melting mineral substances including the production of mineral fibres with a melting capacity exceeding 20 tonnes per day
valid
2017-02-08
2017-02-08
3.5
Manufacture of ceramic products by firing, in particular roofing tiles, bricks, refractory bricks, tiles, stoneware or porcelain with a production capacity exceeding 75 tonnes per day and/or with a kiln capacity exceeding 4 m3 and with a setting density per kiln exceeding 300 kg/m3
Manufacture of ceramic products by firing, in particular roofing tiles, bricks, refractory bricks, tiles, stoneware or porcelain with a production capacity exceeding 75 tonnes per day and/or with a kiln capacity exceeding 4 m3 and with a setting density per kiln exceeding 300 kg/m3
valid
2017-02-08
2017-02-08
4
Chemical industry
Chemical industry
invalid
2018-05-17
2017-02-08
2018-05-17
4.1(a)
Production of organic chemicals: simple hydrocarbons (linear or cyclic, saturated or unsaturated, aliphatic or aromatic)
Production of organic chemicals: simple hydrocarbons (linear or cyclic, saturated or unsaturated, aliphatic or aromatic)
valid
2017-02-08
2017-02-08
4.1(b)
Production of organic chemicals: oxygen-containing hydrocarbons such as alcohols, aldehydes, ketones, carboxylic acids, esters and mixtures of esters, acetates, ethers, peroxides and epoxy resins
Production of organic chemicals: oxygen-containing hydrocarbons such as alcohols, aldehydes, ketones, carboxylic acids, esters and mixtures of esters, acetates, ethers, peroxides and epoxy resins
valid
2017-02-08
2017-02-08
4.1(c)
Production of organic chemicals: sulphurous hydrocarbons
Production of organic chemicals: sulphurous hydrocarbons
valid
2017-02-08
2017-02-08
4.1(d)
Production of organic chemicals: nitrogenous hydrocarbons such as amines, amides, nitrous compounds, nitro compounds or nitrate compounds, nitriles, cyanates, isocyanates
Production of organic chemicals: nitrogenous hydrocarbons such as amines, amides, nitrous compounds, nitro compounds or nitrate compounds, nitriles, cyanates, isocyanates
valid
2017-02-08
2017-02-08
4.1(e)
Production of organic chemicals: phosphorus-containing hydrocarbons
Production of organic chemicals: phosphorus-containing hydrocarbons
valid
2017-02-08
2017-02-08
4.1(f)
Production of organic chemicals: halogenic hydrocarbons
Production of organic chemicals: halogenic hydrocarbons
valid
2017-02-08
2017-02-08
4.1(g)
Production of organic chemicals: organometallic compounds
Production of organic chemicals: organometallic compounds
valid
2017-02-08
2017-02-08
4.1(h)
Production of organic chemicals: plastic materials (polymers, synthetic fibres and cellulose-based fibres)
Production of organic chemicals: plastic materials (polymers, synthetic fibres and cellulose-based fibres)
valid
2017-02-08
2017-02-08
4.1(i)
Production of organic chemicals: synthetic rubbers
Production of organic chemicals: synthetic rubbers
valid
2017-02-08
2017-02-08
4.1(j)
Production of organic chemicals: dyes and pigments
Production of organic chemicals: dyes and pigments
valid
2017-02-08
2017-02-08
4.1(k)
Production of organic chemicals: surface-active agents and surfactants
Production of organic chemicals: surface-active agents and surfactants
valid
2017-02-08
2017-02-08
4.2(a)
Production of inorganic chemicals: gases, such as ammonia, chlorine or hydrogen chloride, fluorine or hydrogen fluoride, carbon oxides, sulphur compounds, nitrogen oxides, hydrogen, sulphur dioxide, carbonyl chloride
Production of inorganic chemicals: gases, such as ammonia, chlorine or hydrogen chloride, fluorine or hydrogen fluoride, carbon oxides, sulphur compounds, nitrogen oxides, hydrogen, sulphur dioxide, carbonyl chloride
valid
2017-02-08
2017-02-08
4.2(b)
Production of inorganic chemicals: acids, such as chromic acid, hydrofluoric acid, phosphoric acid, nitric acid, hydrochloric acid, sulphuric acid, oleum, sulphurous acids
Production of inorganic chemicals: acids, such as chromic acid, hydrofluoric acid, phosphoric acid, nitric acid, hydrochloric acid, sulphuric acid, oleum, sulphurous acids
valid
2017-02-08
2017-02-08
4.2(c)
Production of inorganic chemicals: bases, such as ammonium hydroxide, potassium hydroxide, sodium hydroxide
Production of inorganic chemicals: bases, such as ammonium hydroxide, potassium hydroxide, sodium hydroxide
valid
2017-02-08
2017-02-08
4.2(d)
Production of inorganic chemicals: salts, such as ammonium chloride, potassium chlorate, potassium carbonate, sodium carbonate, perborate, silver nitrate
Production of inorganic chemicals: salts, such as ammonium chloride, potassium chlorate, potassium carbonate, sodium carbonate, perborate, silver nitrate
valid
2017-02-08
2017-02-08
4.2(e)
Production of inorganic chemicals: non-metals, metal oxides or other inorganic compounds such as calcium carbide, silicon, silicon carbide
Production of inorganic chemicals: non-metals, metal oxides or other inorganic compounds such as calcium carbide, silicon, silicon carbide
valid
2017-02-08
2017-02-08
4.3
Production of phosphorous, nitrogen or potassium based fertilisers (simple or compound fertilisers)
Production of phosphorous, nitrogen or potassium based fertilisers (simple or compound fertilisers)
valid
2017-02-08
2017-02-08
4.4
Production of plant protection products or of biocides
Production of plant protection products or of biocides
valid
2017-02-08
2017-02-08
4.5
Production of pharmaceutical products including intermediates
Production of pharmaceutical products including intermediates
valid
2017-02-08
2017-02-08
4.6
Production of explosives
Production of explosives
valid
2017-02-08
2017-02-08
5
Waste management
Waste management
invalid
2018-05-17
2017-02-08
2018-05-17
5.1
Disposal or recovery of hazardous waste with a capacity exceeding 10 tonnes per day involving one or more of the following activities.
Disposal or recovery of hazardous waste with a capacity exceeding 10 tonnes per day involving one or more of the following activities.
valid
2018-05-17
5.1(a)
Disposal or recovery of hazardous waste with a capacity exceeding 10 tonnes per day involving biological treatment
Disposal or recovery of hazardous waste with a capacity exceeding 10 tonnes per day involving biological treatment
valid
2017-02-08
2017-02-08
5.1(b)
Disposal or recovery of hazardous waste with a capacity exceeding 10 tonnes per day involving physico-chemical treatment
Disposal or recovery of hazardous waste with a capacity exceeding 10 tonnes per day involving physico-chemical treatment
valid
2017-02-08
2017-02-08
5.1(c)
Disposal or recovery of hazardous waste with a capacity exceeding 10 tonnes per day involving blending or mixing prior to submission to any of the other activities listed in points 5.1 and 5.2
Disposal or recovery of hazardous waste with a capacity exceeding 10 tonnes per day involving blending or mixing prior to submission to any of the other activities listed in points 5.1 and 5.2
valid
2017-02-08
2017-02-08
5.1(d)
Disposal or recovery of hazardous waste with a capacity exceeding 10 tonnes per day involving repackaging prior to submission to any of the other activities listed in points 5.1 and 5.2
Disposal or recovery of hazardous waste with a capacity exceeding 10 tonnes per day involving repackaging prior to submission to any of the other activities listed in points 5.1 and 5.2
valid
2017-02-08
2017-02-08
5.1(e)
Disposal or recovery of hazardous waste with a capacity exceeding 10 tonnes per day involving solvent reclamation/regeneration
Disposal or recovery of hazardous waste with a capacity exceeding 10 tonnes per day involving solvent reclamation/regeneration
valid
2017-02-08
2017-02-08
5.1(f)
Disposal or recovery of hazardous waste with a capacity exceeding 10 tonnes per day involving recycling/reclamation of inorganic materials other than metals or metal compounds
Disposal or recovery of hazardous waste with a capacity exceeding 10 tonnes per day involving recycling/reclamation of inorganic materials other than metals or metal compounds
valid
2017-02-08
2017-02-08
5.1(g)
Disposal or recovery of hazardous waste with a capacity exceeding 10 tonnes per day involving the regeneration of acids or bases
Disposal or recovery of hazardous waste with a capacity exceeding 10 tonnes per day involving the regeneration of acids or bases
valid
2017-02-08
2017-02-08
5.1(h)
Disposal or recovery of hazardous waste with a capacity exceeding 10 tonnes per day involving the recovery of components used for pollution abatement
Disposal or recovery of hazardous waste with a capacity exceeding 10 tonnes per day involving the recovery of components used for pollution abatement
valid
2017-02-08
2017-02-08
5.1(i)
Disposal or recovery of hazardous waste with a capacity exceeding 10 tonnes per day involving the recovery of components from catalysts
Disposal or recovery of hazardous waste with a capacity exceeding 10 tonnes per day involving the recovery of components from catalysts
valid
2017-02-08
2017-02-08
5.1(j)
Disposal or recovery of hazardous waste with a capacity exceeding 10 tonnes per day involving oil re-refining or other reuses of oil
Disposal or recovery of hazardous waste with a capacity exceeding 10 tonnes per day involving oil re-refining or other reuses of oil
valid
2017-02-08
2017-02-08
5.1(k)
Disposal or recovery of hazardous waste with a capacity exceeding 10 tonnes per day involving surface impoundment
Disposal or recovery of hazardous waste with a capacity exceeding 10 tonnes per day involving surface impoundment
valid
2017-02-08
2017-02-08
5.2(a)
Disposal or recovery of waste in waste incineration plants or in waste co-incineration plants for non-hazardous waste with a capacity exceeding 3 tonnes per hour
Disposal or recovery of waste in waste incineration plants or in waste co-incineration plants for non-hazardous waste with a capacity exceeding 3 tonnes per hour
valid
2017-02-08
2017-02-08
5.2(b)
Disposal or recovery of waste in waste incineration plants or in waste co-incineration plants for hazardous waste with a capacity exceeding 10 tonnes per day
Disposal or recovery of waste in waste incineration plants or in waste co-incineration plants for hazardous waste with a capacity exceeding 10 tonnes per day
valid
2017-02-08
2017-02-08
5.3(a)
Disposal of non-hazardous waste with a capacity exceeding 50 tonnes per day involving one or more of the following activities.
Disposal of non-hazardous waste with a capacity exceeding 50 tonnes per day involving one or more of the following activities, and excluding activities covered by Council Directive 91/271/EEC of 21 May 1991 concerning urban waste-water treatment.
valid
2018-05-17
5.3(a)(i)
Disposal of non-hazardous waste with a capacity exceeding 50 tonnes per day involving biological treatment, excluding activities covered by Council Directive 91/271/EEC of 21 May 1991 concerning urban waste-water treatment
Disposal of non-hazardous waste with a capacity exceeding 50 tonnes per day involving biological treatment, excluding activities covered by Council Directive 91/271/EEC of 21 May 1991 concerning urban waste-water treatment
valid
2017-02-08
2017-02-08
5.3(a)(ii)
Disposal of non-hazardous waste with a capacity exceeding 50 tonnes per day involving physico-chemical treatment ,excluding activities covered by Council Directive 91/271/EEC of 21 May 1991 concerning urban waste-water treatment
Disposal of non-hazardous waste with a capacity exceeding 50 tonnes per day involving physico-chemical treatment ,excluding activities covered by Council Directive 91/271/EEC of 21 May 1991 concerning urban waste-water treatment
valid
2017-02-08
2017-02-08
5.3(a)(iii)
Disposal of non-hazardous waste with a capacity exceeding 50 tonnes per day involving the pre-treatment of waste for incineration or co-incineration, excluding activities covered by Council Directive 91/271/EEC of 21 May 1991 concerning urban waste-water treatment
Disposal of non-hazardous waste with a capacity exceeding 50 tonnes per day involving the pre-treatment of waste for incineration or co-incineration, excluding activities covered by Council Directive 91/271/EEC of 21 May 1991 concerning urban waste-water treatment
valid
2017-02-08
2017-02-08
5.3(a)(iv)
Disposal of non-hazardous waste with a capacity exceeding 50 tonnes per day involving the treatment of slags and ashes, excluding activities covered by Council Directive 91/271/EEC of 21 May 1991 concerning urban waste-water treatment
Disposal of non-hazardous waste with a capacity exceeding 50 tonnes per day involving the treatment of slags and ashes, excluding activities covered by Council Directive 91/271/EEC of 21 May 1991 concerning urban waste-water treatment
valid
2017-02-08
2017-02-08
5.3(a)(v)
Disposal of non-hazardous waste with a capacity exceeding 50 tonnes per day involving treatment in shredders of metal waste, including waste electrical and electronic equipment and end-of-life vehicles and their components , and excluding activities covered by Council Directive 91/271/EEC of 21 May 1991 concerning urban waste-water treatment
Disposal of non-hazardous waste with a capacity exceeding 50 tonnes per day involving treatment in shredders of metal waste, including waste electrical and electronic equipment and end-of-life vehicles and their components , and excluding activities covered by Council Directive 91/271/EEC of 21 May 1991 concerning urban waste-water treatment
valid
2017-02-08
2017-02-08
5.3(b)
Recovery, or a mix of recovery and disposal, of non-hazardous waste with a capacity exceeding 75 tonnes per day involving one or more of the following activities, and excluding activities covered by Directive 91/271/EEC.
Recovery, or a mix of recovery and disposal, of non-hazardous waste with a capacity exceeding 75 tonnes per day involving one or more of the following activities, and excluding activities covered by Directive 91/271/EEC.
valid
2018-05-17
5.3(b)(i)
Recovery, or a mix of recovery and disposal, of non-hazardous waste with a capacity exceeding 75 tonnes per day involving biological treatment, excluding activities covered by Directive 91/271/EEC
Recovery, or a mix of recovery and disposal, of non-hazardous waste with a capacity exceeding 75 tonnes per day involving biological treatment, excluding activities covered by Directive 91/271/EEC
valid
2017-02-08
2017-02-08
5.3(b)(ii)
Recovery, or a mix of recovery and disposal, of non-hazardous waste with a capacity exceeding 75 tonnes per day involving the pre-treatment of waste for incineration or co-incineration, excluding activities covered by Directive 91/271/EEC
Recovery, or a mix of recovery and disposal, of non-hazardous waste with a capacity exceeding 75 tonnes per day involving the pre-treatment of waste for incineration or co-incineration, excluding activities covered by Directive 91/271/EEC
valid
2017-02-08
2017-02-08
5.3(b)(iii)
Recovery, or a mix of recovery and disposal, of non-hazardous waste with a capacity exceeding 75 tonnes per day involving the treatment of slags and ashes, excluding activities covered by Directive 91/271/EEC
Recovery, or a mix of recovery and disposal, of non-hazardous waste with a capacity exceeding 75 tonnes per day involving the treatment of slags and ashes, excluding activities covered by Directive 91/271/EEC
valid
2017-02-08
2017-02-08
5.3(b)(iv)
Recovery, or a mix of recovery and disposal, of non-hazardous waste with a capacity exceeding 75 tonnes per day involving treatment in shredders of metal waste, including waste electrical and electronic equipment and end-of-life vehicles and their components, and excluding activities covered by Directive 91/271/EEC.
Recovery, or a mix of recovery and disposal, of non-hazardous waste with a capacity exceeding 75 tonnes per day involving treatment in shredders of metal waste, including waste electrical and electronic equipment and end-of-life vehicles and their components, and excluding activities covered by Directive 91/271/EEC.
valid
2017-02-08
2017-02-08
5.4
Landfills, as defined in Article 2(g) of Council Directive 1999/31/EC of 26 April 1999 on the landfill of waste, receiving more than 10 tonnes of waste per day or with a total capacity exceeding 25,000 tonnes, excluding landfills of inert waste
Landfills, as defined in Article 2(g) of Council Directive 1999/31/EC of 26 April 1999 on the landfill of waste, receiving more than 10 tonnes of waste per day or with a total capacity exceeding 25,000 tonnes, excluding landfills of inert waste
valid
2017-02-08
2017-02-08
5.5
Temporary storage of hazardous waste not covered under point 5.4 pending any of the activities listed in points 5.1, 5.2, 5.4 and 5.6 with a total capacity exceeding 50 tonnes, excluding temporary storage, pending collection, on the site where the waste is generated
Temporary storage of hazardous waste not covered under point 5.4 pending any of the activities listed in points 5.1, 5.2, 5.4 and 5.6 with a total capacity exceeding 50 tonnes, excluding temporary storage, pending collection, on the site where the waste is generated
valid
2017-02-08
2017-02-08
5.6
Underground storage of hazardous waste with a total capacity exceeding 50 tonnes
Underground storage of hazardous waste with a total capacity exceeding 50 tonnes
valid
2017-02-08
2017-02-08
6
Other activities
Other activities
invalid
2018-05-17
2017-02-08
2018-05-17
6.1(a)
Production in industrial installations of pulp from timber or other fibrous materials
Production in industrial installations of pulp from timber or other fibrous materials
valid
2017-02-08
2017-02-08
6.1(b)
Production in industrial installations of paper or card board with a production capacity exceeding 20 tonnes per day
Production in industrial installations of paper or card board with a production capacity exceeding 20 tonnes per day
valid
2017-02-08
2017-02-08
6.1(c)
Production in industrial installations with a production capacity exceeding 600 m3 per day of one or more of the following wood-based panels: oriented strand board, particleboard or fibreboard
Production in industrial installations with a production capacity exceeding 600 m3 per day of one or more of the following wood-based panels: oriented strand board, particleboard or fibreboard
valid
2017-02-08
2017-02-08
6.10
Preservation of wood and wood products with chemicals with a production capacity exceeding 75 m3 per day other than exclusively treating against sapstain
Preservation of wood and wood products with chemicals with a production capacity exceeding 75 m3 per day other than exclusively treating against sapstain
valid
2017-02-08
2017-02-08
6.11
Independently operated treatment of waste water not covered by Directive 91/271/EEC and discharged by an installation covered by Chapter II of Directive 2010/75/EU
Independently operated treatment of waste water not covered by Directive 91/271/EEC and discharged by an installation covered by Chapter II of Directive 2010/75/EU
valid
2017-02-08
2017-02-08
6.2
Pre-treatment (operations such as washing, bleaching, mercerisation) or dyeing of textile fibres or textiles where the treatment capacity exceeds 10 tonnes per day
Pre-treatment (operations such as washing, bleaching, mercerisation) or dyeing of textile fibres or textiles where the treatment capacity exceeds 10 tonnes per day
valid
2017-02-08
2017-02-08
6.3
Tanning of hides and skins where the treatment capacity exceeds 12 tonnes of finished products per day
Tanning of hides and skins where the treatment capacity exceeds 12 tonnes of finished products per day
valid
2017-02-08
2017-02-08
6.4(a)
Operating slaughterhouses with a carcass production capacity greater than 50 tonnes per day
Operating slaughterhouses with a carcass production capacity greater than 50 tonnes per day
valid
2017-02-08
2017-02-08
6.4(b)(i)
Treatment and processing, other than exclusively packaging, of the following raw materials, whether previously processed or unprocessed, intended for the production of food or feed from only animal raw materials (other than exclusively milk) with a finished product production capacity greater than 75 tonnes per day
Treatment and processing, other than exclusively packaging, of the following raw materials, whether previously processed or unprocessed, intended for the production of food or feed from only animal raw materials (other than exclusively milk) with a finished product production capacity greater than 75 tonnes per day
valid
2017-02-08
2017-02-08
6.4(b)(ii)
Treatment and processing, other than exclusively packaging, of the following raw materials, whether previously processed or unprocessed, intended for the production of food or feed from only vegetable raw materials with a finished product production capacity greater than 300 tonnes per day or 600 tonnes per day where the installation operates for a period of no more than 90 consecutive days in any year
Treatment and processing, other than exclusively packaging, of the following raw materials, whether previously processed or unprocessed, intended for the production of food or feed from only vegetable raw materials with a finished product production capacity greater than 300 tonnes per day or 600 tonnes per day where the installation operates for a period of no more than 90 consecutive days in any year
valid
2017-02-08
2017-02-08
6.4(c)
Treatment and processing of milk only, the quantity of milk received being greater than 200 tonnes per day (average value on an annual basis)
Treatment and processing of milk only, the quantity of milk received being greater than 200 tonnes per day (average value on an annual basis)
valid
2017-02-08
2017-02-08
6.5
Disposal or recycling of animal carcases or animal waste with a treatment capacity exceeding 10 tonnes per day
Disposal or recycling of animal carcases or animal waste with a treatment capacity exceeding 10 tonnes per day
valid
2017-02-08
2017-02-08
6.6(a)
Intensive rearing of poultry with more than 40,000 places for poultry
Intensive rearing of poultry with more than 40,000 places for poultry
valid
2017-02-08
2017-02-08
6.6(b)
Intensive rearing of pigs with more than 2,000 places for production pigs (over 30 kg)
Intensive rearing of pigs with more than 2,000 places for production pigs (over 30 kg)
valid
2017-02-08
2017-02-08
6.6(c)
Intensive rearing of pigs with more than 750 places for sows
Intensive rearing of pigs with more than 750 places for sows
valid
2017-02-08
2017-02-08
6.7
Surface treatment of substances, objects or products using organic solvents, in particular for dressing, printing, coating, degreasing, waterproofing, sizing, painting, cleaning or impregnating, with an organic solvent consumption capacity of more than 150 kg per hour or more than 200 tonnes per year
Surface treatment of substances, objects or products using organic solvents, in particular for dressing, printing, coating, degreasing, waterproofing, sizing, painting, cleaning or impregnating, with an organic solvent consumption capacity of more than 150 kg per hour or more than 200 tonnes per year
valid
2017-02-08
2017-02-08
6.8
Production of carbon (hard-burnt coal) or electrographite by means of incineration or graphitisation
Production of carbon (hard-burnt coal) or electrographite by means of incineration or graphitisation
valid
2017-02-08
2017-02-08
6.9
Capture of CO2 streams from installations covered by Directive 2010/75/EU for the purposes of geological storage pursuant to Directive 2009/31/EC
Capture of CO2 streams from installations covered by Directive 2010/75/EU for the purposes of geological storage pursuant to Directive 2009/31/EC
valid
2017-02-08
2017-02-08
6.4(b)(iii)
Treatment and processing, other than exclusively packaging, of the following raw materials, whether previously processed or unprocessed, intended for the production of food or feed from animal and vegetable raw materials, both in combined and separate products, with a finished product production capacity in tonnes per day greater than 75 if A is equal to 10 or more or, [300- (22,5 � A)] in any other case, where �A� is the portion of animal material (in percent of weight) of the finished product production capacity
Treatment and processing, other than exclusively packaging, of the following raw materials, whether previously processed or unprocessed, intended for the production of food or feed from animal and vegetable raw materials, both in combined and separate products, with a finished product production capacity in tonnes per day greater than 75 if A is equal to 10 or more or, [300- (22,5 � A)] in any other case, where �A� is the portion of animal material (in percent of weight) of the finished product production capacity
valid
2017-02-08
2017-02-08
Installation Type Value
InstallationTypeValue
Released
claudia
2018-11-21 12:42:53.0
Common
false
false
IED
IED
The facility is subject to Chapter II the IED.
valid
2018-10-02
NONIED
Non-IED
The facility is not subject to Chapter II the IED.
valid
2018-10-02
List hosts the classification for the activities according to the Council Regulation 3037/90/EEC.
NACEValue
Released
alvardan
2017-02-16 10:21:01.0
Common
false
false
01.11
Growing of cereals except rice leguminous crops and oil seeds
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
01.12
Growing of rice
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
01.13
Growing of vegetables and melons roots and tubers
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
01.14
Growing of sugar cane
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
01.15
Growing of tobacco
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
01.16
Growing of fibre crops
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
01.19
Growing of other non-perennial crops
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
01.21
Growing of grapes
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
01.22
Growing of tropical and subtropical fruits
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
01.23
Growing of citrus fruits
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
01.24
Growing of pome fruits and stone fruits
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
01.25
Growing of other tree and bush fruits and nuts
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
01.26
Growing of oleaginous fruits
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
01.27
Growing of beverage crops
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
01.28
Growing of spices aromatic drug and pharmaceutical crops
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
01.29
Growing of other perennial crops
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
01.30
Plant propagation
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
01.41
Raising of dairy cattle
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
01.42
Raising of other cattle and buffaloes
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
01.43
Raising of horses and other equines
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
01.44
Raising of camels and camelids
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
01.45
Raising of sheep and goats
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
01.46
Raising of swine/pigs
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
01.47
Raising of poultry
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
01.49
Raising of other animals
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
01.50
Mixed farming
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
01.61
Support activities for crop production
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
01.62
Support activities for animal production
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
01.63
Post-harvest crop activities
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
01.64
Seed processing for propagation
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
01.70
Hunting trapping and related service activities
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
02.10
Silviculture and other forestry activities
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
02.20
Logging
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
02.30
Gathering of wild growing non-wood products
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
02.40
Support services to forestry
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
03.11
Marine fishing
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
03.12
Freshwater fishing
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
03.21
Marine aquaculture
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
03.22
Freshwater aquaculture
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
05.10
Mining of hard coal
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
05.20
Mining of lignite
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
06.10
Extraction of crude petroleum
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
06.20
Extraction of natural gas
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
07.10
Mining of iron ores
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
07.21
Mining of uranium and thorium ores
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
07.29
Mining of other non-ferrous metal ores
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
08.11
Quarrying of ornamental and building stone limestone gypsum chalk and slate
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
08.12
Operation of gravel and sand pits mining of clays and kaolin
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
08.91
Mining of chemical and fertiliser minerals
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
08.92
Extraction of peat
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
08.93
Extraction of salt
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
08.99
Other mining and quarrying n e c
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
09.10
Support activities for petroleum and natural gas extraction
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
09.90
Support activities for other mining and quarrying
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
10.11
Processing and preserving of meat
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
10.12
Processing and preserving of poultry meat
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
10.13
Production of meat and poultry meat products
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
10.20
Processing and preserving of fish crustaceans and molluscs
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
10.31
Processing and preserving of potatoes
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
10.32
Manufacture of fruit and vegetable juice
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
10.39
Other processing and preserving of fruit and vegetables
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
10.41
Manufacture of oils and fats
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
10.42
Manufacture of margarine and similar edible fats
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
10.51
Operation of dairies and cheese making
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
10.52
Manufacture of ice cream
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
10.61
Manufacture of grain mill products
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
10.62
Manufacture of starches and starch products
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
10.71
Manufacture of bread manufacture of fresh pastry goods and cakes
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
10.72
Manufacture of rusks and biscuits manufacture of preserved pastry goods and cakes
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
10.73
Manufacture of macaroni noodles couscous and similar farinaceous products
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
10.81
Manufacture of sugar
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
10.82
Manufacture of cocoa chocolate and sugar confectionery
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
10.83
Processing of tea and coffee
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
10.84
Manufacture of condiments and seasonings
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
10.85
Manufacture of prepared meals and dishes
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
10.86
Manufacture of homogenised food preparations and dietetic food
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
10.89
Manufacture of other food products n e c
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
10.91
Manufacture of prepared feeds for farm animals
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
10.92
Manufacture of prepared pet foods
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
11.01
Distilling rectifying and blending of spirits
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
11.02
Manufacture of wine from grape
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
11.03
Manufacture of cider and other fruit wines
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
11.04
Manufacture of other non-distilled fermented beverages
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
11.05
Manufacture of beer
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
11.06
Manufacture of malt
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
11.07
Manufacture of soft drinks production of mineral waters and other bottled waters
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
12.00
Manufacture of tobacco products
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
13.10
Preparation and spinning of textile fibres
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
13.20
Weaving of textiles
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
13.30
Finishing of textiles
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
13.91
Manufacture of knitted and crocheted fabrics
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
13.92
Manufacture of made-up textile articles except apparel
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
13.93
Manufacture of carpets and rugs
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
13.94
Manufacture of cordage rope twine and netting
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
13.95
Manufacture of non-wovens and articles made from non-wovens except apparel
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
13.96
Manufacture of other technical and industrial textiles
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
13.99
Manufacture of other textiles n e c
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
14.11
Manufacture of leather clothes
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
14.12
Manufacture of workwear
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
14.13
Manufacture of other outerwear
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
14.14
Manufacture of underwear
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
14.19
Manufacture of other wearing apparel and accessories
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
14.20
Manufacture of articles of fur
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
14.31
Manufacture of knitted and crocheted hosiery
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
14.39
Manufacture of other knitted and crocheted apparel
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
15.11
Tanning and dressing of leather dressing and dyeing of fur
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
15.12
Manufacture of luggage handbags and the like saddlery and harness
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
15.20
Manufacture of footwear
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
16.10
Sawmilling and planing of wood
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
16.21
Manufacture of veneer sheets and wood-based panels
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
16.22
Manufacture of assembled parquet floors
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
16.23
Manufacture of other builders carpentry and joinery
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
16.24
Manufacture of wooden containers
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
16.29
Manufacture of other products of wood manufacture of articles of cork straw and plaiting materials
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
17.11
Manufacture of pulp
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
17.12
Manufacture of paper and paperboard
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
17.21
Manufacture of corrugated paper and paperboard and of containers of paper and paperboard
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
17.22
Manufacture of household and sanitary goods and of toilet requisites
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
17.23
Manufacture of paper stationery
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
17.24
Manufacture of wallpaper
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
17.29
Manufacture of other articles of paper and paperboard
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
18.11
Printing of newspapers
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
18.12
Other printing
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
18.13
Pre-press and pre-media services
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
18.14
Binding and related services
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
18.20
Reproduction of recorded media
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
19.10
Manufacture of coke oven products
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
19.20
Manufacture of refined petroleum products
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
20.11
Manufacture of industrial gases
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
20.12
Manufacture of dyes and pigments
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
20.13
Manufacture of other inorganic basic chemicals
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
20.14
Manufacture of other organic basic chemicals
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
20.15
Manufacture of fertilisers and nitrogen compounds
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
20.16
Manufacture of plastics in primary forms
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
20.17
Manufacture of synthetic rubber in primary forms
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
20.20
Manufacture of pesticides and other agrochemical products
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
20.30
Manufacture of paints varnishes and similar coatings printing ink and mastics
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
20.41
Manufacture of soap and detergents cleaning and polishing preparations
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
20.42
Manufacture of perfumes and toilet preparations
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
20.51
Manufacture of explosives
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
20.52
Manufacture of glues
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
20.53
Manufacture of essential oils
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
20.59
Manufacture of other chemical products n e c
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
20.60
Manufacture of man-made fibres
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
21.10
Manufacture of basic pharmaceutical products
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
21.20
Manufacture of pharmaceutical preparations
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
22.11
Manufacture of rubber tyres and tubes retreading and rebuilding of rubber tyres
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
22.19
Manufacture of other rubber products
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
22.21
Manufacture of plastic plates sheets tubes and profiles
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
22.22
Manufacture of plastic packing goods
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
22.23
Manufacture of builders’ ware of plastic
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
22.29
Manufacture of other plastic products
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
23.11
Manufacture of flat glass
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
23.12
Shaping and processing of flat glass
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
23.13
Manufacture of hollow glass
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
23.14
Manufacture of glass fibres
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
23.19
Manufacture and processing of other glass including technical glassware
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
23.20
Manufacture of refractory products
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
23.31
Manufacture of ceramic tiles and flags
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
23.32
Manufacture of bricks tiles and construction products in baked clay
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
23.41
Manufacture of ceramic household and ornamental articles
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
23.42
Manufacture of ceramic sanitary fixtures
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
23.43
Manufacture of ceramic insulators and insulating fittings
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
23.44
Manufacture of other technical ceramic products
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
23.49
Manufacture of other ceramic products
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
23.51
Manufacture of cement
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
23.52
Manufacture of lime and plaster
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
23.61
Manufacture of concrete products for construction purposes
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
23.62
Manufacture of plaster products for construction purposes
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
23.63
Manufacture of ready-mixed concrete
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
23.64
Manufacture of mortars
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
23.65
Manufacture of fibre cement
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
23.69
Manufacture of other articles of concrete plaster and cement
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
23.70
Cutting shaping and finishing of stone
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
23.91
Production of abrasive products
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
23.99
Manufacture of other non-metallic mineral products n e c
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
24.10
Manufacture of basic iron and steel and of ferro-alloys
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
24.20
Manufacture of tubes pipes hollow profiles and related fittings of steel
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
24.31
Cold drawing of bars
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
24.32
Cold rolling of narrow strip
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
24.33
Cold forming or folding
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
24.34
Cold drawing of wire
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
24.41
Precious metals production
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
24.42
Aluminium production
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
24.43
Lead zinc and tin production
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
24.44
Copper production
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
24.45
Other non-ferrous metal production
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
24.46
Processing of nuclear fuel
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
24.51
Casting of iron
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
24.52
Casting of steel
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
24.53
Casting of light metals
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
24.54
Casting of other non-ferrous metals
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
25.11
Manufacture of metal structures and parts of structures
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
25.12
Manufacture of doors and windows of metal
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
25.21
Manufacture of central heating radiators and boilers
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
25.29
Manufacture of other tanks reservoirs and containers of metal
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
25.30
Manufacture of steam generators except central heating hot water boilers
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
25.40
Manufacture of weapons and ammunition
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
25.50
Forging pressing stamping and roll-forming of metal powder metallurgy
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
25.61
Treatment and coating of metals
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
25.62
Machining
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
25.71
Manufacture of cutlery
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
25.72
Manufacture of locks and hinges
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
25.73
Manufacture of tools
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
25.91
Manufacture of steel drums and similar containers
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
25.92
Manufacture of light metal packaging
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
25.93
Manufacture of wire products chain and springs
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
25.94
Manufacture of fasteners and screw machine products
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
25.99
Manufacture of other fabricated metal products n e c
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
26.11
Manufacture of electronic components
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
26.12
Manufacture of loaded electronic boards
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
26.20
Manufacture of computers and peripheral equipment
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
26.30
Manufacture of communication equipment
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
26.40
Manufacture of consumer electronics
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
26.51
Manufacture of instruments and appliances for measuring testing and navigation
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
26.52
Manufacture of watches and clocks
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
26.60
Manufacture of irradiation electromedical and electrotherapeutic equipment
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
26.70
Manufacture of optical instruments and photographic equipment
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
26.80
Manufacture of magnetic and optical media
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
27.11
Manufacture of electric motors generators and transformers
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
27.12
Manufacture of electricity distribution and control apparatus
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
27.20
Manufacture of batteries and accumulators
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
27.31
Manufacture of fibre optic cables
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
27.32
Manufacture of other electronic and electric wires and cables
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
27.33
Manufacture of wiring devices
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
27.40
Manufacture of electric lighting equipment
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
27.51
Manufacture of electric domestic appliances
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
27.52
Manufacture of non-electric domestic appliances
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
27.90
Manufacture of other electrical equipment
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
28.11
Manufacture of engines and turbines except aircraft vehicle and cycle engines
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
28.12
Manufacture of fluid power equipment
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
28.13
Manufacture of other pumps and compressors
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
28.14
Manufacture of other taps and valves
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
28.15
Manufacture of bearings gears gearing and driving elements
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
28.21
Manufacture of ovens furnaces and furnace burners
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
28.22
Manufacture of lifting and handling equipment
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
28.23
Manufacture of office machinery and equipment except computers and peripheral equipment
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
28.24
Manufacture of power-driven hand tools
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
28.25
Manufacture of non-domestic cooling and ventilation equipment
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
28.29
Manufacture of other general-purpose machinery n e c
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
28.30
Manufacture of agricultural and forestry machinery
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
28.41
Manufacture of metal forming machinery
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
28.49
Manufacture of other machine tools
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
28.91
Manufacture of machinery for metallurgy
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
28.92
Manufacture of machinery for mining quarrying and construction
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
28.93
Manufacture of machinery for food beverage and tobacco processing
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
28.94
Manufacture of machinery for textile apparel and leather production
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
28.95
Manufacture of machinery for paper and paperboard production
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
28.96
Manufacture of plastics and rubber machinery
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
28.99
Manufacture of other special-purpose machinery n e c
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
29.10
Manufacture of motor vehicles
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
29.20
Manufacture of bodies coachwork for motor vehicles manufacture of trailers and semi-trailers
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
29.31
Manufacture of electrical and electronic equipment for motor vehicles
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
29.32
Manufacture of other parts and accessories for motor vehicles
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
30.11
Building of ships and floating structures
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
30.12
Building of pleasure and sporting boats
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
30.20
Manufacture of railway locomotives and rolling stock
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
30.30
Manufacture of air and spacecraft and related machinery
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
30.40
Manufacture of military fighting vehicles
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
30.91
Manufacture of motorcycles
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
30.92
Manufacture of bicycles and invalid carriages
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
30.99
Manufacture of other transport equipment n e c
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
31.01
Manufacture of office and shop furniture
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
31.02
Manufacture of kitchen furniture
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
31.03
Manufacture of mattresses
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
31.09
Manufacture of other furniture
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
32.10
Manufacture of jewellery, bijouterie and related articles
Manufacture of jewellery, bijouterie and related articles
valid
2017-02-08
32.11
Striking of coins
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
32.12
Manufacture of jewellery and related articles
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
32.13
Manufacture of imitation jewellery and related articles
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
32.20
Manufacture of musical instruments
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
32.30
Manufacture of sports goods
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
32.40
Manufacture of games and toys
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
32.50
Manufacture of medical and dental instruments and supplies
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
32.91
Manufacture of brooms and brushes
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
32.99
Other manufacturing n e c
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
33.11
Repair of fabricated metal products
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
33.12
Repair of machinery
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
33.13
Repair of electronic and optical equipment
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
33.14
Repair of electrical equipment
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
33.15
Repair and maintenance of ships and boats
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
33.16
Repair and maintenance of aircraft and spacecraft
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
33.17
Repair and maintenance of other transport equipment
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
33.19
Repair of other equipment
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
33.20
Installation of industrial machinery and equipment
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
35.11
Production of electricity
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
35.12
Transmission of electricity
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
35.13
Distribution of electricity
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
35.14
Trade of electricity
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
35.21
Manufacture of gas
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
35.22
Distribution of gaseous fuels through mains
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
35.23
Trade of gas through mains
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
35.30
Steam and air conditioning supply
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
36.00
Water collection treatment and supply
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
37.00
Sewerage
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
38.11
Collection of non-hazardous waste
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
38.12
Collection of hazardous waste
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
38.21
Treatment and disposal of non-hazardous waste
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
38.22
Treatment and disposal of hazardous waste
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
38.31
Dismantling of wrecks
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
38.32
Recovery of sorted materials
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
39.00
Remediation activities and other waste management services
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
41.10
Development of building projects
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
41.20
Construction of residential and non-residential buildings
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
42.11
Construction of roads and motorways
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
42.12
Construction of railways and underground railways
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
42.13
Construction of bridges and tunnels
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
42.21
Construction of utility projects for fluids
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
42.22
Construction of utility projects for electricity and telecommunications
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
42.91
Construction of water projects
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
42.99
Construction of other civil engineering projects n e c
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
43.11
Demolition
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
43.12
Site preparation
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
43.13
Test drilling and boring
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
43.21
Electrical installation
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
43.22
Plumbing heat and air-conditioning installation
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
43.29
Other construction installation
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
43.31
Plastering
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
43.32
Joinery installation
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
43.33
Floor and wall covering
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
43.34
Painting and glazing
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
43.39
Other building completion and finishing
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
43.91
Roofing activities
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
43.99
Other specialised construction activities n e c
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
45.11
Sale of cars and light motor vehicles
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
45.19
Sale of other motor vehicles
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
45.20
Maintenance and repair of motor vehicles
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
45.31
Wholesale trade of motor vehicle parts and accessories
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
45.32
Retail trade of motor vehicle parts and accessories
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
45.40
Sale maintenance and repair of motorcycles and related parts and accessories
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
46.11
Agents involved in the sale of agricultural raw materials live animals textile raw materials and semi-finished goods
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
46.12
Agents involved in the sale of fuels ores metals and industrial chemicals
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
46.13
Agents involved in the sale of timber and building materials
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
46.14
Agents involved in the sale of machinery industrial equipment ships and aircraft
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
46.15
Agents involved in the sale of furniture household goods hardware and ironmongery
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
46.16
Agents involved in the sale of textiles clothing fur footwear and leather goods
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
46.17
Agents involved in the sale of food beverages and tobacco
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
46.18
Agents specialised in the sale of other particular products
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
46.19
Agents involved in the sale of a variety of goods
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
46.21
Wholesale of grain unmanufactured tobacco seeds and animal feeds
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
46.22
Wholesale of flowers and plants
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
46.23
Wholesale of live animals
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
46.24
Wholesale of hides skins and leather
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
46.31
Wholesale of fruit and vegetables
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
46.32
Wholesale of meat and meat products
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
46.33
Wholesale of dairy products eggs and edible oils and fats
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
46.34
Wholesale of beverages
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
46.35
Wholesale of tobacco products
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
46.36
Wholesale of sugar and chocolate and sugar confectionery
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
46.37
Wholesale of coffee tea cocoa and spices
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
46.38
Wholesale of other food including fish crustaceans and molluscs
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
46.39
Non-specialised wholesale of food beverages and tobacco
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
46.41
Wholesale of textiles
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
46.42
Wholesale of clothing and footwear
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
46.43
Wholesale of electrical household appliances
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
46.44
Wholesale of china and glassware and cleaning materials
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
46.45
Wholesale of perfume and cosmetics
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
46.46
Wholesale of pharmaceutical goods
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
46.47
Wholesale of furniture carpets and lighting equipment
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
46.48
Wholesale of watches and jewellery
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
46.49
Wholesale of other household goods
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
46.51
Wholesale of computers computer peripheral equipment and software
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
46.52
Wholesale of electronic and telecommunications equipment and parts
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
46.61
Wholesale of agricultural machinery equipment and supplies
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
46.62
Wholesale of machine tools
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
46.63
Wholesale of mining construction and civil engineering machinery
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
46.64
Wholesale of machinery for the textile industry and of sewing and knitting machines
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
46.65
Wholesale of office furniture
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
46.66
Wholesale of other office machinery and equipment
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
46.69
Wholesale of other machinery and equipment
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
46.71
Wholesale of solid liquid and gaseous fuels and related products
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
46.72
Wholesale of metals and metal ores
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
46.73
Wholesale of wood construction materials and sanitary equipment
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
46.74
Wholesale of hardware plumbing and heating equipment and supplies
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
46.75
Wholesale of chemical products
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
46.76
Wholesale of other intermediate products
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
46.77
Wholesale of waste and scrap
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
46.90
Non-specialised wholesale trade
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
47.11
Retail sale in non-specialised stores with food beverages or tobacco predominating
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
47.19
Other retail sale in non-specialised stores
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
47.21
Retail sale of fruit and vegetables in specialised stores
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
47.22
Retail sale of meat and meat products in specialised stores
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
47.23
Retail sale of fish crustaceans and molluscs in specialised stores
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
47.24
Retail sale of bread cakes flour confectionery and sugar confectionery in specialised stores
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
47.25
Retail sale of beverages in specialised stores
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
47.26
Retail sale of tobacco products in specialised stores
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
47.29
Other retail sale of food in specialised stores
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
47.30
Retail sale of automotive fuel in specialised stores
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
47.41
Retail sale of computers peripheral units and software in specialised stores
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
47.42
Retail sale of telecommunications equipment in specialised stores
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
47.43
Retail sale of audio and video equipment in specialised stores
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
47.51
Retail sale of textiles in specialised stores
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
47.52
Retail sale of hardware paints and glass in specialised stores
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
47.53
Retail sale of carpets rugs wall and floor coverings in specialised stores
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
47.54
Retail sale of electrical household appliances in specialised stores
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
47.59
Retail sale of furniture lighting equipment and other household articles in specialised stores
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
47.61
Retail sale of books in specialised stores
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
47.62
Retail sale of newspapers and stationery in specialised stores
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
47.63
Retail sale of music and video recordings in specialised stores
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
47.64
Retail sale of sporting equipment in specialised stores
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
47.65
Retail sale of games and toys in specialised stores
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
47.71
Retail sale of clothing in specialised stores
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
47.72
Retail sale of footwear and leather goods in specialised stores
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
47.73
Dispensing chemist in specialised stores
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
47.74
Retail sale of medical and orthopaedic goods in specialised stores
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
47.75
Retail sale of cosmetic and toilet articles in specialised stores
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
47.76
Retail sale of flowers plants seeds fertilisers pet animals and pet food in specialised stores
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
47.77
Retail sale of watches and jewellery in specialised stores
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
47.78
Other retail sale of new goods in specialised stores
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
47.79
Retail sale of second-hand goods in stores
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
47.81
Retail sale via stalls and markets of food beverages and tobacco products
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
47.82
Retail sale via stalls and markets of textiles clothing and footwear
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
47.89
Retail sale via stalls and markets of other goods
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
47.91
Retail sale via mail order houses or via Internet
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
47.99
Other retail sale not in stores stalls or markets
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
49.10
Passenger rail transport interurban
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
49.20
Freight rail transport
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
49.31
Urban and suburban passenger land transport
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
49.32
Taxi operation
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
49.39
Other passenger land transport n e c
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
49.41
Freight transport by road
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
49.42
Removal services
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
49.50
Transport via pipeline
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
50.10
Sea and coastal passenger water transport
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
50.20
Sea and coastal freight water transport
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
50.30
Inland passenger water transport
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
50.40
Inland freight water transport
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
51.10
Passenger air transport
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
51.21
Freight air transport
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
51.22
Space transport
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
52.10
Warehousing and storage
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
52.21
Service activities incidental to land transportation
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
52.22
Service activities incidental to water transportation
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
52.23
Service activities incidental to air transportation
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
52.24
Cargo handling
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
52.29
Other transportation support activities
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
53.10
Postal activities under universal service obligation
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
53.20
Other postal and courier activities
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
55.10
Hotels and similar accommodation
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
55.20
Holiday and other short-stay accommodation
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
55.30
Camping grounds recreational vehicle parks and trailer parks
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
55.90
Other accommodation
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
56.10
Restaurants and mobile food service activities
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
56.21
Event catering activities
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
56.29
Other food service activities
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
56.30
Beverage serving activities
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
58.11
Book publishing
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
58.12
Publishing of directories and mailing lists
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
58.13
Publishing of newspapers
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
58.14
Publishing of journals and periodicals
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
58.19
Other publishing activities
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
58.21
Publishing of computer games
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
58.29
Other software publishing
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
59.11
Motion picture video and television programme production activities
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
59.12
Motion picture video and television programme post-production activities
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
59.13
Motion picture video and television programme distribution activities
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
59.14
Motion picture projection activities
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
59.20
Sound recording and music publishing activities
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
60.10
Radio broadcasting
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
60.20
Television programming and broadcasting activities
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
61.10
Wired telecommunications activities
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
61.20
Wireless telecommunications activities
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
61.30
Satellite telecommunications activities
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
61.90
Other telecommunications activities
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
62.01
Computer programming activities
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
62.02
Computer consultancy activities
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
62.03
Computer facilities management activities
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
62.09
Other information technology and computer service activities
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
63.11
Data processing hosting and related activities
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
63.12
Web portals
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
63.91
News agency activities
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
63.99
Other information service activities n e c
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
64.11
Central banking
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
64.19
Other monetary intermediation
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
64.20
Activities of holding companies
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
64.30
Trusts funds and similar financial entities
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
64.91
Financial leasing
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
64.92
Other credit granting
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
64.99
Other financial service activities except insurance and pension funding n e c
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
65.11
Life insurance
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
65.12
Non-life insurance
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
65.20
Reinsurance
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
65.30
Pension funding
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
66.11
Administration of financial markets
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
66.12
Security and commodity contracts brokerage
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
66.19
Other activities auxiliary to financial services except insurance and pension funding
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
66.21
Risk and damage evaluation
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
66.22
Activities of insurance agents and brokers
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
66.29
Other activities auxiliary to insurance and pension funding
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
66.30
Fund management activities
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
68.10
Buying and selling of own real estate
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
68.20
Renting and operating of own or leased real estate
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
68.31
Real estate agencies
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
68.32
Management of real estate on a fee or contract basis
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
69.10
Legal activities
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
69.20
Accounting bookkeeping and auditing activities tax consultancy
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
70.10
Activities of head offices
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
70.21
Public relations and communication activities
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
70.22
Business and other management consultancy activities
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
71.11
Architectural activities
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
71.12
Engineering activities and related technical consultancy
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
71.20
Technical testing and analysis
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
72.11
Research and experimental development on biotechnology
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
72.19
Other research and experimental development on natural sciences and engineering
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
72.20
Research and experimental development on social sciences and humanities
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
73.11
Advertising agencies
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
73.12
Media representation
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
73.20
Market research and public opinion polling
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
74.10
Specialised design activities
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
74.20
Photographic activities
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
74.30
Translation and interpretation activities
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
74.90
Other professional scientific and technical activities n e c
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
75.00
Veterinary activities
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
77.11
Renting and leasing of cars and light motor vehicles
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
77.12
Renting and leasing of trucks
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
77.21
Renting and leasing of recreational and sports goods
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
77.22
Renting of video tapes and disks
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
77.29
Renting and leasing of other personal and household goods
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
77.31
Renting and leasing of agricultural machinery and equipment
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
77.32
Renting and leasing of construction and civil engineering machinery and equipment
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
77.33
Renting and leasing of office machinery and equipment including computers
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
77.34
Renting and leasing of water transport equipment
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
77.35
Renting and leasing of air transport equipment
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
77.39
Renting and leasing of other machinery equipment and tangible goods n e c
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
77.40
Leasing of intellectual property and similar products except copyrighted works
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
78.10
Activities of employment placement agencies
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
78.20
Temporary employment agency activities
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
78.30
Other human resources provision
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
79.11
Travel agency activities
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
79.12
Tour operator activities
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
79.90
Other reservation service and related activities
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
80.10
Private security activities
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
80.20
Security systems service activities
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
80.30
Investigation activities
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
81.10
Combined facilities support activities
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
81.21
General cleaning of buildings
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
81.22
Other building and industrial cleaning activities
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
81.29
Other cleaning activities
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
81.30
Landscape service activities
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
82.11
Combined office administrative service activities
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
82.19
Photocopying document preparation and other specialised office support activities
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
82.20
Activities of call centres
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
82.30
Organisation of conventions and trade shows
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
82.91
Activities of collection agencies and credit bureaus
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
82.92
Packaging activities
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
82.99
Other business support service activities n e c
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
84.11
General public administration activities
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
84.12
Regulation of the activities of providing health care education cultural services and other social services excluding social security
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
84.13
Regulation of and contribution to more efficient operation of businesses
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
84.21
Foreign affairs
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
84.22
Defence activities
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
84.23
Justice and judicial activities
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
84.24
Public order and safety activities
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
84.25
Fire service activities
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
84.30
Compulsory social security activities
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
85.10
Pre-primary education
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
85.20
Primary education
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
85.31
General secondary education
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
85.32
Technical and vocational secondary education
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
85.41
Post-secondary non-tertiary education
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
85.42
Tertiary education
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
85.51
Sports and recreation education
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
85.52
Cultural education
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
85.53
Driving school activities
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
85.59
Other education n e c
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
85.60
Educational support activities
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
86.10
Hospital activities
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
86.21
General medical practice activities
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
86.22
Specialist medical practice activities
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
86.23
Dental practice activities
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
86.90
Other human health activities
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
87.10
Residential nursing care activities
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
87.20
Residential care activities for mental retardation mental health and substance abuse
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
87.30
Residential care activities for the elderly and disabled
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
87.90
Other residential care activities
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
88.10
Social work activities without accommodation for the elderly and disabled
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
88.91
Child day-care activities
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
88.99
Other social work activities without accommodation n e c
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
90.01
Performing arts
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
90.02
Support activities to performing arts
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
90.03
Artistic creation
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
90.04
Operation of arts facilities
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
91.01
Library and archives activities
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
91.02
Museums activities
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
91.03
Operation of historical sites and buildings and similar visitor attractions
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
91.04
Botanical and zoological gardens and nature reserves activities
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
92.00
Gambling and betting activities
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
93.11
Operation of sports facilities
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
93.12
Activities of sport clubs
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
93.13
Fitness facilities
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
93.19
Other sports activities
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
93.21
Activities of amusement parks and theme parks
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
93.29
Other amusement and recreation activities
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
94.11
Activities of business and employers membership organisations
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
94.12
Activities of professional membership organisations
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
94.20
Activities of trade unions
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
94.91
Activities of religious organisations
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
94.92
Activities of political organisations
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
94.99
Activities of other membership organisations n e c
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
95.11
Repair of computers and peripheral equipment
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
95.12
Repair of communication equipment
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
95.21
Repair of consumer electronics
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
95.22
Repair of household appliances and home and garden equipment
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
95.23
Repair of footwear and leather goods
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
95.24
Repair of furniture and home furnishings
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
95.25
Repair of watches clocks and jewellery
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
95.29
Repair of other personal and household goods
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
96.01
Washing and dry- cleaning of textile and fur products
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
96.02
Hairdressing and other beauty treatment
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
96.03
Funeral and related activities
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
96.04
Physical well-being activities
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
96.09
Other personal service activities n e c
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
97.00
Activities of households as employers of domestic personnel
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
98.00
Undifferentiated goods- and services-producing activities of private households for own use
Undifferentiated goods- and services-producing activities of private households for own use
valid
2017-02-08
98.10
Undifferentiated goods-producing activities of private households for own use
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
98.20
Undifferentiated service-producing activities of private households for own use
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
99.00
Activities of extraterritorial organisations and bodies
List hosts the classification for the activities according to the Council Regulation 3037 90 EEC
valid
2016-06-08
2016-06-08
The type of ProductionInstallationPart
PlantTypeValue
Released
alvardan
2017-11-10 08:31:29.0
Common
false
false
LCP
Large combustion plant
A combustion plant as defined in Chapter III of Directive 2010/75/EU
valid
2017-02-08
WI
Waste incineration plant
Plant covered by Directive 2010/75/EU, Chapter IV, incinerating waste
valid
2017-02-08
co-WI
Waste co-incineration plant
Plant covered by Directive 2010/75/EU, Chapter IV, co-incinerating waste
valid
2017-09-19
This code list contains the potential options under which a confidentiality claim for data can be made.
ReasonValue
Released
claudia
2018-11-21 12:35:03.0
Common
false
false
Art4-2a
Disclosure of the information would adversely affect the confidentiality of the proceedings of public authorities, where such confidentiality is provided for by law, in accordance with Directive 2003/4/EC.
Disclosure of the information would adversely affect the confidentiality of the proceedings of public authorities, where such confidentiality is provided for by law, in accordance with Directive 2003/4/EC.
valid
2016-06-07
Art4-2b
Disclosure of the information would adversely affect international relations, public security or national defence, in accordance with Directive 2003/4/EC.
Disclosure of the information would adversely affect international relations, public security or national defense, in accordance with Directive 2003/4/EC.
valid
2016-06-07
Art4-2c
Disclosure of the information would adversely affect the course of justice, the ability of any person to receive a fair trial or the ability of a public authority to conduct an enquiry of a criminal or disciplinary nature, in accordance with Directive 2003/4/EC.
Disclosure of the information would adversely affect the course of justice, the ability of any person to receive a fair trial or the ability of a public authority to conduct an enquiry of a criminal or disciplinary nature, in accordance with Directive 2003/4/EC.
valid
2016-06-07
Art4-2d
Disclosure of the information would adversely affect the confidentiality of commercial or industrial information where such confidentiality is provided for by national or Community law to protect a legitimate economic interest, including the public interest in maintaining statistical confidentiality and tax secrecy, in accordance with Directive 2003/4/EC.
Disclosure of the information would adversely affect the confidentiality of commercial or industrial information where such confidentiality is provided for by national or Community law to protect a legitimate economic interest, including the public interest in maintaining statistical confidentiality and tax secrecy, in accordance with Directive 2003/4/EC.
valid
2016-06-07
Art4-2e
Disclosure of the information would adversely affect intellectual property rights, in accordance with Directive 2003/4/EC.
Disclosure of the information would adversely affect intellectual property rights, in accordance with Directive 2003/4/EC.
valid
2016-06-07
Art4-2f
Disclosure of the information would adversely affect the confidentiality of personal data and/or files relating to a natural person where that person has not consented to the disclosure of the information to the public, where such confidentiality is provided for by national or Community law, in accordance with Directive 2003/4/EC.
Disclosure of the information would adversely affect the confidentiality of personal data and/or files relating to a natural person where that person has not consented to the disclosure of the information to the public, where such confidentiality is provided for by national or Community law, in accordance with Directive 2003/4/EC.
valid
2016-06-07
Art4-2g
Disclosure of the information would adversely affect the interests or protection of any person who supplied the information requested on a voluntary basis without being under, or capable of being put under, a legal obligation to do so, unless that person has consented to the release of the information concerned, in accordance with DIRECTIVE 2003/4/EC.
Disclosure of the information would adversely affect the interests or protection of any person who supplied the information requested on a voluntary basis without being under, or capable of being put under, a legal obligation to do so, unless that person has consented to the release of the information concerned, in accordance with DIRECTIVE 2003/4/EC.
valid
2016-06-07
Art4-2h
Disclosure of the information would adversely affect the protection of the environment to which such information relates, such as the location of rare species, according to DIRECTIVE 2003/4/EC.
Disclosure of the information would adversely affect the protection of the environment to which such information relates, such as the location of rare species, according to DIRECTIVE 2003/4/EC.
valid
2016-06-07
This code list contains details of the Chapters of Directive 2010/75/EU which may be selected by Member States as part of their EU Registry data reporting
RelevantChapterValue
Released
marnaian
2017-12-20 13:40:27.0
Common
false
false
ChapterIII
Chapter III - Combustion Plants
Special provisions for Combustion Plants
valid
2016-06-07
ChapterIV
Chapter IV - waste incineration and co-incineration plants
Special provisions for waste incineration plants and waste co-incineration plant
valid
2016-06-07
ChapterV
Chapter V - installations and activities using organic solvents
Special provisions for installations and activities using organic solvents
valid
2016-06-07
ChapterVI
ChapterVI - installations producing titanium dioxide
Special provisions for installations producing titanium dioxide
valid
2016-06-07