Concept URI | http://dd.eionet.europa.eu/vocabulary/euregistryonindustrialsites/BaselineReportValue/NOTREQUIRED |
---|---|
Preferred label | Not Required |
Definition | Baeline report not required as the activity does not involve the use, production or release of relevant hazardous substances and/or does not have the possibility of soil and groundwater contamination at the site of the installation. |
Notation | NOTREQUIRED |
Status | Valid |
Status Modified | 02.10.2018 |
Accepted Date | |
Not Accepted Date |
European Environment Agency
Kgs. Nytorv 6, DK-1050 Copenhagen K, Denmark