Concept: Mandatory information missing. in the cdrqaqc vocabulary

Concept URI http://dd.eionet.europa.eu/vocabulary/art17_2018/cdrqaqc/S200
Preferred label Mandatory information missing.
Definition The time frame of the response to measures should be provided if measures are identified and taken.
Notation S200
Status Valid
Status Modified 2019-03-20
Accepted Date 2019-03-20
Not Accepted Date
Error type
  • ERROR